Letting Schedule for Waco District (FY 2001)
| Letting Schedule for Waco District (FY 2001) | ||||
| Last Update: Friday, August 31, 2001 | ||||
| Updated from Design & Construction Information System (DCIS) on: August 31, 2001 |
| Waco District (FY 2001) |
| Bell | Bosque | Coryell | Falls | Hamilton | Hill | Limestone | McLennan | ||||||
Bell County | ||||||
| CCSJ | Highway | Let Status | Letting Date |
Contract Cost |
Fund Cat |
Description |
|---|---|---|---|---|---|---|
| 0015-04-066 | IH 35 | Actual | JUL 2001 | $1,719,341 | 2 | METAL BEAM GUARD UPGRADE |
| 0015-04-069 | SP 290 | Actual | MAR 2001 | $866,620 | 7 | PLANING, SEAL COAT AND ASPHALT CONCRETE PAVEMENT OVERLAY |
| 0184-04-036 | LP 363 | Actual | APR 2001 | $429,882 | 11 | REALIGN WESTBOUND FRONTAGE ROAD AND REALIGN RAMP |
| 0184-04-037 | LP 363 | Actual | AUG 2001 | $355,427 | 13D | REALIGN FRONTAGE ROAD AND RAMP |
| 0232-05-012 | FM 2305 | Actual | NOV 2000 | $98,304 | 16S | PURCHASE OF LANDSCAPE MATERIAL |
| 0909-36-091 | CS | Approved | AUG 2001 | $753,644 | 11 | WIDENING TO ADD LEFT TURN LANE, RESURFACE PAVEMENT & |
| 0909-36-099 | VA | Actual | AUG 2001 | $717,441 | 7 | BRIDGE MAINTENANCE @ 9 LOCATIONS IN BELL COUNTY |
Bosque County | ||||||
| CCSJ | Highway | Let Status | Letting Date |
Contract Cost |
Fund Cat |
Description |
| 0909-28-023 | VA | Actual | OCT 2000 | $288,547 | 10A | REFURBISH OVERHEAD FLASHING BEACONS |
Coryell County | ||||||
| CCSJ | Highway | Let Status | Letting Date |
Contract Cost |
Fund Cat |
Description |
| 0055-05-044 | US 84 | Actual | MAY 2001 | $2,938,109 | 14 | IMPROVE GUARDRAIL TO DESIGN STANDARDS & SAFETY TREAT FIXED |
| 0055-05-046 | US 84 | Actual | MAR 2001 | $500,424 | 7 | ASPHALT CONCRETE PAVEMENT, MILLING AND SURFACING |
Falls County | ||||||
| CCSJ | Highway | Let Status | Letting Date |
Contract Cost |
Fund Cat |
Description |
| 0049-03-052 | SH 6 | Actual | JUL 2001 | $12,887,108 | 3B | WIDEN 2 LANE TO 4 LANE DIVIDED |
| 0513-03-017 | SH 7 | Actual | MAY 2001 | $5,829,912 | 4E | WIDEN SHOULDERS, OVERLAY AND SAFETY WORK |
Hamilton County | ||||||
| CCSJ | Highway | Let Status | Letting Date |
Contract Cost |
Fund Cat |
Description |
| 0120-01-015 | SH 22 | Actual | JAN 2001 | $2,684,698 | 7 | MICROSURFACING |
| 0909-29-018 | CR | Actual | AUG 2001 | $465,613 | 6B | REPLACE BRIDGE AND APPROACHES |
| 0909-29-021 | CR | Actual | APR 2001 | $427,956 | 6B | REPLACE BRIDGES AND APPROACHES |
Hill County | ||||||
| CCSJ | Highway | Let Status | Letting Date |
Contract Cost |
Fund Cat |
Description |
| 0014-05-033 | SH 81 | Actual | DEC 2000 | $5,956,108 | 7 | SEAL COAT |
| 0909-37-029 | VA | Actual | MAY 2001 | $184,541 | 10A | REFURBISH OVERHEAD FLASHING BEACONS |
Limestone County | ||||||
| CCSJ | Highway | Let Status | Letting Date |
Contract Cost |
Fund Cat |
Description |
| 0673-02-008 | FM 1951 | Actual | DEC 2000 | $1,260,864 | 7 | SEAL COAT |
McLennan County | ||||||
| CCSJ | Highway | Let Status | Letting Date |
Contract Cost |
Fund Cat |
Description |
| 0014-10-054 | BU 77-L | Actual | APR 2001 | $84,399 | 16S | LANDSCAPE DEVELOPMENT CONSISTING OF AN IRRIGATION SYSTEM |
| 0015-01-178 | IH 35 | Actual | JUL 2001 | $2,437,328 | 4A | INSTALL MEDIAN BARRIER |
| 0162-01-080 | US 84 | Actual | AUG 2001 | $5,566,715 | 14 | TEXTURIZE SHOULDERS (MILLED) |
| 0413-01-024 | SH 164 | Actual | OCT 2000 | $3,339,087 | 14 | SEAL, OVERLAY AND SAFETY WORK |
| 0833-04-032 | FM 434 | Actual | OCT 2000 | $100,000 | 14 | WIDEN 1000 FT ROADWAY ON SOUTH SIDE OF FM 434 FOR LEFT |
| 0909-00-037 | VA | Actual | APR 2001 | $1,344,759 | 10A | DISTRICTWIDE GUIDE SIGNS |