Letting Schedule for October, 2000 (FY 2001)
![]() |
![]() |
![]() |
![]() |
![]() |
Letting Schedule for October, 2000 (FY 2001) | ||||
Last Update: Friday, August 31, 2001 | ||||
Updated from Design & Construction Information System (DCIS) on: August 31, 2001 | |
October, 2000 (FY 2001) | (see Links) |
SEP 2000 | OCT 2000 | NOV 2000 | DEC 2000 | JAN 2001 | FEB 2001 | MAR 2001 | APR 2001 | MAY 2001 | JUN 2001 | JUL 2001 | AUG 2001 | ||||||
CCSJ | County/ District |
Highway | Let Status | Contract Cost |
Fund Cat |
Description |
---|---|---|---|---|---|---|
0909-28-023 | Bosque/ Waco |
VA | Actual | $288,547 | 10A | REFURBISH OVERHEAD FLASHING BEACONS |
0046-05-034 | Bowie/ Atlanta |
US 82 | Actual | $7,165,368 | 7 | SEAL COAT |
0598-03-017 | Brazoria/ Houston |
SH 288 | Actual | $309,189 | 10A | INSTALL ADVANCED WARNING SIGNALS /SIGNS |
0020-11-038 | Brewster/ El Paso |
US 67 | Actual | $7,209,992 | 7 | SEAL COAT |
0255-03-029 | Brooks/ Pharr |
US 281 | Actual | $67,885 | 4A | TEXTURIZE SHOULDERS (MILLED) |
2243-01-010 | Cameron/ Pharr |
FM 106 | Actual | $1,061,288 | 4F | WIDEN AND ADD SHOULDERS |
0919-00-058 | Cass/ Atlanta |
VA | Actual | $300,000 | 15 | DEVELOP AN ITS REGIONAL ARCHITECTURE & DEPLOYMENT PLAN |
0925-00-047 | Childress/ Childress |
VA | Actual | $200,000 | 15 | DEVELOP AN ITS REGIONAL ARCHITECTURE & DEPLOYMENT PLAN |
0903-15-035 | Cooke/ Wichita Falls |
CR | Actual | $368,452 | 6B | REPLACE BRIDGE AND APPROACHES |
0353-04-076 | Dallas/ Dallas |
SH 114 | Actual | $1,924,536 | 16C | CONSTRUCT FRONTAGE ROAD |
0918-45-520 | Dallas/ Dallas |
VA | Actual | $125,240 | 16B | LANDSCAPING OF RIGHT OF WAY |
0918-45-521 | Dallas/ Dallas |
VA | Actual | $525,000 | 5 | TRAFFIC MANAGEMENT FOR SPECIAL EVENTS OFF-SYSTEM |
0918-45-522 | Dallas/ Dallas |
VA | Actual | $975,000 | 5 | TRAFFIC MANAGEMENT FOR SPECIAL EVENTS ON-SYSTEM |
2374-04-052 | Dallas/ Dallas |
IH 20 | Actual | $1,420,747 | 4C | INSTALLATION OF VIDEO SURVEILLANCE AND FIBER OPTIC CABLE |
0918-46-063 | Denton/ Dallas |
CR | Actual | $324,539 | 6B | REPLACE BRIDGE AND APPROACHES |
0037-05-038 | Dimmit/ Laredo |
US 83 | Actual | $4,879,937 | 14 | REHABILITATE OF A NON-FREEWAY CONSISTING OF FLEXIBLE BASE |
0237-06-028 | Duval/ Laredo |
SH 44 | Actual | $328,998 | 10A | INTERCONNECT TRAFFIC SIGNALS |
0924-00-035 | El Paso/ El Paso |
VA | Actual | $100,000 | 15 | DEVELOP AN ITS REGIONAL ARCHITECTURE & DEPLOYMENT PLAN |
0924-06-173 | El Paso/ El Paso |
CS | Actual | $752,537 | 5 | VEHICLE DETECTOR REPLACEMENT PROGRAM (PHASES I, II & III) |
0048-03-077 | Ellis/ Dallas |
US 77 | Actual | $414,670 | 7 | FULL DEPTH CONCRETE PAVEMENT REPAIR |
0715-02-011 | Gonzales/ Yoakum |
FM 108 | Actual | $2,311,687 | 14 | RESTORE ROADWAY |
0912-00-194 | Harris/ Houston |
VA | Actual | $1,552,128 | 11 | STRIPING |
0495-08-072 | Harrison/ Atlanta |
IH 20 | Actual | $1,682,165 | 2 | REFURBISH LARGE AND SMALL SIGNS |
0157-07-002 | Haskell/ Abilene |
BU 277G | Actual | $2,834,774 | 11 | WIDENING, ADD SIDEWALK /CURB & GUTTER, ASPHALT PAVEMENT |
0014-07-084 | Hill/ Wichita Falls |
IH 35 | Actual | $439,153 | 4A | TEXTURIZE SHOULDERS (MILLED) |
0009-13-131 | Hunt/ Paris |
IH 30 | Actual | $1,455,850 | 2 | REHAB EXIST ROAD |
0255-01-065 | Jim Wells/ Corpus Christi |
US 281 | Actual | $5,050,942 | 14 | REHABILITATE ROADWAY |
0095-04-053 | Kaufman/ Dallas |
US 80 | Actual | $413,121 | 11 | REGRADE EASTBOUND LANES TO IMPROVE SAFETY, SURFACE PLANING |
0918-11-044 | Kaufman/ Dallas |
VA | Actual | $1,368,287 | 14 | BASE REPAIR AND LEVELUP |
0925-17-003 | Knox/ Childress |
VA | Actual | $42,696 | 16B | LANDSCAPE |
0515-04-025 | Lavaca/ Yoakum |
FM 530 | Actual | $2,022,337 | 14 | RESTORE ROADWAY |
0177-03-080 | Liberty/ Beaumont |
US 59 | Actual | $1,260,967 | 3C | REHABILITATE EXISTING ROADWAY |
0413-01-024 | McLennan/ Waco |
SH 164 | Actual | $3,339,087 | 14 | SEAL, OVERLAY AND SAFETY WORK |
0833-04-032 | McLennan/ Waco |
FM 434 | Actual | $100,000 | 14 | WIDEN 1000 FT ROADWAY ON SOUTH SIDE OF FM 434 FOR LEFT |
2383-01-017 | Midland/ Odessa |
FM 1379 | Actual | $925,821 | 14 | RESTORATION OF PAVEMENT STRUCTURE |
0337-05-030 | Milam/ Bryan |
FM 486 | Actual | $489,755 | 14 | RESTORATION OF EXISTING ROAD CONSISTING OF LIME TREATING |
1210-03-022 | Milam/ Bryan |
FM 979 | Actual | $417,832 | 14 | RESTORATION OF EXISTING ROAD CONSTING OF FLEX BASE, CEMENT |
1259-01-023 | Montgomery/ Houston |
FM 1097 | Actual | $738,656 | 10A | LEFT TURN CHANNELIZATION |
0918-18-065 | Navarro/ Dallas |
VA | Actual | $1,618,466 | 14 | BASE REPAIR AND LEVELUP |
0373-08-010 | Nueces/ Corpus Christi |
BU 77-U | Actual | $50,000 | 4A | RAIL ROAD SIGNAL UPGRADE |
0090-03-050 | Oldham/ Amarillo |
IH 40 | Actual | $5,846,965 | 7 | SEAL COAT |
1876-02-011 | Polk/ Lufkin |
FM 1988 | Actual | $1,959,074 | 14 | REHAB EXISTING ROADWAY |
0090-06-037 | Potter/ Amarillo |
BI 40-D | Actual | $298,176 | 4D | MISCELLANEOUS WORK CONSISTING OF REHAB EXISTING ROADWAY & |
0904-00-077 | Potter/ Amarillo |
VA | Actual | $300,000 | 15 | DEVELOP AN ITS REGIONAL ARCHITECTURE & DEPLOYMENT PLAN |
0540-01-034 | Robertson/ Bryan |
FM 46 | Actual | $1,273,039 | 14 | RESTORATION OF EXISTING ROAD CONSISTING OF CEMENT TREATED |
0911-29-010 | Sabine/ Lufkin |
CR | Actual | $325,515 | 6B | REPLACE BRIDGE AND APPROACHES |
0125-04-025 | Shackelford/ Abilene |
US 283 | Actual | $1,474,893 | 7 | ACP OVERLAY, PAVEMENT MARKINGS |
0066-03-034 | Sherman/ Amarillo |
US 287 | Actual | $10,216,269 | 4F | REHABILITATE EXISTING ROADWAY |
0910-00-053 | Smith/ Tyler |
VA | Actual | $300,000 | 15 | DEVELOP AN ITS REGIONAL ARCHITECTURE & DEPLOYMENT PLAN |
0504-02-019 | Tarrant/ Fort Worth |
SH 121 | Actual | $10,700 | 11 | DESIGN AND CONSTRUCTION OF MODEL OF INTERCHANGE |
0902-00-074 | Tarrant/ Fort Worth |
VA | Actual | $894,273 | 2 | CONCRETE PAVEMENT REPAIR |
0902-00-076 | Tarrant/ Fort Worth |
VA | Actual | $858,663 | 2 | THERMOPLASTIC PAVEMENT MARKERS AND RAISED PAVEMENT MARKERS |
0902-48-330 | Tarrant/ Fort Worth |
CS | Actual | $678,000 | 5 | PARK-N-RIDE FACILITY |
0902-48-443 | Tarrant/ Fort Worth |
VA | Actual | $200,000 | 5 | TRAVEL DEMAND MANAGEMENT |
0902-48-444 | Tarrant/ Fort Worth |
VA | Actual | $257,812 | 5 | ALTERNATIVE FUELS |
0902-48-445 | Tarrant/ Fort Worth |
VA | Actual | $3,750,000 | 5 | FWTA TRACKING AND DISPATCH SYSTEM |
0902-48-446 | Tarrant/ Fort Worth |
VA | Actual | $166,666 | 5 | EMPLOYER TRIP REDUCTION TRANSFER YEAR 1 |
0902-48-447 | Tarrant/ Fort Worth |
VA | Actual | $4,125,000 | 5 | BRIDGE AT LANCASTER AVE; BRIDGE & RDWY ON EULESS MAIN AT |
0902-48-448 | Tarrant/ Fort Worth |
VA | Actual | $1,392,300 | 4C | VEHICLE ACQUISITION |
0902-48-449 | Tarrant/ Fort Worth |
VA | Actual | $1,250,000 | 5 | RAIL TRANSIT, ENGINEERING & DESIGN |
0914-00-139 | Travis/ Austin |
VA | Actual | $184,000 | 10A | REFURBISH GUIDE SIGNS |
0914-00-142 | Travis/ Austin |
VA | Actual | $135,000 | 4C | COMMUTE SOLUTIONS /OZONE ACTION DAY PROGRAMS |
0914-00-143 | Travis/ Austin |
VA | Actual | $46,500 | 4C | AIR QUALITY SPECIALIST |
1186-01-046 | Travis/ Austin |
FM 969 | Actual | $1,520,083 | 11 | REPLACE BRIDGE AND APPROACHES |
0578-02-030 | Walker/ Bryan |
FM 247 | Actual | $1,572,656 | 14 | RESTORATION OF EXISTING ROAD CONSISTING OF GRADING, |
0922-33-041 | Webb/ Laredo |
CS | Actual | $798,989 | 4A | INTERCONNECT TRAFFIC SIGNALS AND LEFT TURN BAYS |
0903-30-009 | Wilbarger/ Wichita Falls |
CR | Actual | $105,289 | 6B | BRIDGE REPLACEMENT |
0015-09-134 | Williamson/ Austin |
IH 35 | Actual | $2,153,475 | 3E | CONST TURNAROUND & FRT IMPROVEMENTS |
0683-06-007 | Williamson/ Austin |
SH 45 | Actual | $13,082,018 | 18 | CONSTRUCT FRONTAGE ROADS |
0914-05-101 | Williamson/ Austin |
CS | Actual | $367,093 | 6B | REPLACE BRIDGE & APPROACHES |