Letting Schedule for December, 2000 (FY 2001)

Texas Department of Transportation Logo (Registered Trademark)
 
 
Last Update: Friday, August 31, 2001
 
Updated from Design & Construction Information System (DCIS) on: August 31, 2001
December, 2000 (FY 2001) (see Links)
SEP 2000 | OCT 2000 | NOV 2000 | DEC 2000 | JAN 2001 | FEB 2001 | MAR 2001 | APR 2001 | MAY 2001 | JUN 2001 | JUL 2001 | AUG 2001
CCSJ County/
District
Highway Let Status Contract
Cost
Fund
Cat
Description
0058-03-021 Anderson/
Tyler
SH 294 Actual $7,752,681 7 SEAL COAT
0911-00-042 Angelina/
Lufkin
VA Actual $295,454 10A REPLACE EXPRESSWAY SIGNS
0180-04-104 Aransas/
Corpus Christi
SH 35 Actual $973,350 6A REPAIR BRIDGE FOUNDATION
0073-08-138 Bexar/
San Antonio
IH 37 Actual $793,934 2 CONSTRUCT RETAINING WALL AT MCCRELESS MALL
0521-04-236 Bexar/
San Antonio
IH 410 Actual $18,854,998 3A UPGRADE TO 10 LANE FREEWAY & TRAFFIC MANAGEMENT SYSTEM
0915-12-173 Bexar/
San Antonio
CS Actual $2,246,204 4C RECONSTRUCT & EXPAND 2 TO 4 LN W /CLTL (DRAINAGE)
0330-01-025 Bowie/
Atlanta
FM 1840 Actual $1,267,828 8A WIDEN TO ADD SHOULDERS, STRENGTHEN BASE AND RESURFACE
0912-31-125 Brazoria/
Houston
VA Actual $331,955 11 RAISE MBGF TO MEET STANDARDS
0054-07-062 Brown/
Fort Worth
US 84 Actual $6,620,780 7 SEAL COAT
0007-01-047 Callahan/
Abilene
IH 20 Actual $5,992,970 2 PLANING, HOT ASPHALT RUBBER UNDERSEAL, ASPHALT CONCRETE
0437-04-022 Callahan/
Abilene
US 283 Actual $2,364,757 4F EXTEND STRUCTRES, SAFETY END TREATMENT, BRIDGE RAIL, AND
0331-03-017 Cameron/
Pharr
FM 1421 Actual $2,510,830 14 RECONSTRUCT & ADD SHOULDERS
0630-02-034 Cameron/
Pharr
FM 106 Actual $1,895,975 7 WIDEN TO 4 LANE DIVIDED
1232-03-012 Camp/
Atlanta
FM 1520 Actual $1,023,336 8B REALIGN AND RECONSTRUCT SECTION OF EXISTING FM ROAD
0218-03-074 Cass/
Atlanta
US 59 Actual $1,726,387 7 RESURFACE EXISTNG 4-LANE DIVIDED HIGHWAY
0043-01-065 Childress/
Childress
US 287 Actual $1,476,081 4F FULL DEPTH PAVEMENT REPAIR
0137-10-019 Clay/
Wichita Falls
FM 174 Actual $3,030,143 7 SEAL COAT
1350-01-015 Clay/
Wichita Falls
FM 1197 Actual $2,029,630 6A REPLACE BRIDGE AND APPROACHES
1035-02-006 Coleman/
Brownwood
FM 585 Actual $603,834 14 SCARIFY EXISTING ROAD, ADD BASE AND SURFACE
0280-02-036 Collin/
Dallas
SH 78 Actual $8,577,708 7 SPOT BASE REPAIR, HOT MIX LEVEL-UP, HOT MIX OVERLAY AND PVMT.
0903-15-061 Cooke/
Wichita Falls
CS Actual $668,008 6B REPLACE BRIDGE AND APPROACHES
1141-02-017 Dallam/
Amarillo
SH 102 Actual $5,182,125 4F WIDEN NON-FREEWAY FACILITY
0196-03-207 Dallas/
Dallas
IH 35E Actual $498,760 2 CONSTRUCT RETAINING WALL-SLOPE EROSION PREVENTION
0136-10-007 Delta/
Paris
FM 1528 Actual $1,265,701 7 SEAL COAT
1950-01-029 Denton/
Dallas
FM 407 Actual $165,163 10A ADD LEFT & RIGHT TURN LANES
1822-01-017 Ector/
Odessa
FM 1936 Actual $3,616,726 11 WIDEN A NON-FREEWAY FACILITY TO PROVIDE FOR AN 85 FOOT CURB
2296-01-043 Ector/
Odessa
SH 191 Actual $2,235,361 4F REHABILITATION OF EXISTING ROAD
2121-02-090 El Paso/
El Paso
IH 10 Actual $13,677,988 6B RELOCATE AND CONSTRUCT ENTRANCE RAMPS
0172-05-097 Ellis/
Dallas
US 287 Actual $513,822 10A GUIDE SIGN REFURBISHING
0261-01-034 Ellis/
Dallas
US 67 Actual $188,239 10A GUIDE SIGN REFURBISHING
0211-09-027 Fayette/
Yoakum
FM 155 Actual $1,384,888 16B RESTORE ROADWAY
0408-01-036 Fayette/
Yoakum
SH 159 Actual $3,294,521 14 REHABILITATE ROADWAY
0912-73-072 Galveston/
Houston
VA Actual $523,948 7 REHAB OF A BRIDGE FACILITY CONSISTING OF JOINT & CRACK
0912-73-073 Galveston/
Houston
VA Actual $965,119 14 REHAB SIGNS
0025-06-048 Gonzales/
Yoakum
US 90A Actual $1,701,658 7 SEAL COAT
0047-03-061 Grayson/
Paris
US 75 Actual $1,612,712 7 SEAL COAT
0925-09-011 Hall/
Childress
CR Actual $855,521 6B REPLACE BRIDGE AND APPROACHES
0177-11-136 Harris/
Houston
US 59 Actual $317,095 7 REPAIR BRIDGE AND EXPANSION JOINTS
0271-17-137 Harris/
Houston
IH 610 Actual $684,274 11 SHOULDER RECONSTRUCTION, RAMP REHABILITATION, SIGNING AND
0500-03-500 Harris/
Houston
IH 45 Actual $1,828,027 7 REPAIR AND REHAB APPROACH SLAB, ARMOR JOINT AND REPLACE
0912-00-195 Harris/
Houston
VA Actual $1,522,891 11 STRIPING
0912-00-201 Harris/
Houston
VA Actual $812,500 5 FY 2001 CLEAN AIR COALITION (CAC) OUTREACH PROGRAM
0912-71-725 Harris/
Houston
VA Actual $654,914 11 STRIPING
0912-71-726 Harris/
Houston
VA Actual $283,483 11 SMALL SIGN UPGRADE
0912-71-728 Harris/
Houston
VA Actual $274,537 11 SMALL SIGN UPGRADE
3256-01-073 Harris/
Houston
BW 8 Actual $202,240 5 FOR THE CONSTRUCTION OF ADDITIONAL RT TURN LANES CONSISTING
0697-02-049 Henderson/
Tyler
FM 85 Actual $4,098,436 8A REHABILITATE ROADWAY
1802-01-032 Hidalgo/
Pharr
FM 1924 Actual $4,244,100 4C IMPROVE TRAFFIC SIGNAL, ADD THROUGH LANES AND CONTINUOUS
0014-05-033 Hill/
Waco
SH 81 Actual $5,956,108 7 SEAL COAT
0005-05-092 Howard/
Abilene
IH 20 Actual $3,179,782 2 LIME TREAT SUBGRADE AND FLEXIBLE BASE, ASPHALT STABILIZED
0068-07-046 Howard/
Abilene
US 87 Actual $4,628,368 4F RECONSTRUCT NORTH BOUND LANE, REHABILITATE SOUTH BOUND LANE,
0136-01-056 Hunt/
Paris
SH 224 Actual $1,264,154 7 SEAL COAT
0089-04-072 Jackson/
Yoakum
US 59 Actual $2,009,646 7 SEAL COAT
0028-06-063 Jefferson/
Beaumont
US 90 Actual $4,991,671 7 SEAL COAT
1227-01-021 Jim Hogg/
Pharr
FM 1017 Actual $6,083,846 4F RECONSTRUCT AND ADD SHOULDERS
0019-02-025 Johnson/
Fort Worth
SH 171 Actual $977,829 7 MILL AND OVERLAY
1094-04-011 Johnson/
Fort Worth
FM 731 Actual $2,888,313 8A ADD SHOULDERS, WIDEN STRUCTURES, OVERLAY AND STRIPE
1294-02-018 Karnes/
Corpus Christi
FM 1144 Actual $1,172,439 11 REHABILITATE ROADWAY
0197-04-066 Kaufman/
Dallas
US 175 Actual $164,813 10A INSTALLATION OF SAFETY LIGHTING
0018-09-004 La Salle/
Laredo
BI 35-C Actual $82,277 10A UPGRADE OF EXISTING FLASHING BEACON
0673-02-008 Limestone/
Waco
FM 1951 Actual $1,260,864 7 SEAL COAT
0074-02-060 Live Oak/
Corpus Christi
IH 37 Actual $4,602,168 2 NBL /SBL HOT MIX OVERLAY (TY'C')
0117-04-035 Madison/
Bryan
US 190 Actual $46,468 4A MISCELLANEOUS WORK CONSISTING OF THE INSTALLATION OF
0915-45-025 Medina/
San Antonio
CR Actual $626,436 6B REPLACE BRIDGE & APPROACHES
0463-02-054 Midland/
Odessa
BS 158B Actual $3,896,251 3C REHABILITATION OF EXISTING ROAD
0338-03-083 Montgomery/
Houston
SH 105 Actual $170,815 10A UPGRADE EXISTING FLASHING BEACON TO A FULL-ACTUATED TRAFFIC
0162-03-037 Navarro/
Dallas
SH 31 Actual $5,487,320 3B CONSTRUCT 4 LANE DIVIDED FROM 2 LANE UNDIVIDED
0007-08-023 Palo Pinto/
Fort Worth
SH 16 Actual $3,349,922 7 SEAL COAT
0008-01-043 Palo Pinto/
Fort Worth
US 180 Actual $877,305 7 MILL AND OVERLAY
0171-03-055 Parker/
Fort Worth
SH 199 Actual $776,810 7 MICROSURFACING
0213-05-033 Polk/
Lufkin
US 190 Actual $1,066,254 4E EXTEND & SAFETY TREAT STRUCTURES & CLEAR R.O.W.
0957-08-021 Presidio/
El Paso
FM 170 Actual $3,839,093 8A REHABILITATION
0330-04-004 Red River/
Paris
FM 44 Actual $1,723,151 7 SEAL COAT
0191-01-067 Smith/
Tyler
US 69 Actual $468,200 7 RESURFACE ROADWAY TO MAINTAIN DESIRED RIDING SURFACE
0008-06-044 Tarrant/
Fort Worth
SH 180 Actual $1,186,801 7 ROTOMILL PLANT MIX SEAL AND OVERLAY
0008-12-082 Tarrant/
Fort Worth
SH 183 Actual $570,044 7 MICROSURFACING MAIN LANES
0902-48-188 Tarrant/
Fort Worth
CS Actual $1,939,730 4C WIDENING 2 LANES TO 4 LANES
0902-48-450 Tarrant/
Fort Worth
CS Actual $204,000 4C RIGHT OF WAY ACQUISITION
2374-05-056 Tarrant/
Fort Worth
IH 20 Actual $347,845 11 REPAIR PAVEMENT AND LENGTHEN STORAGE ON WESTBOUND FRONTAGE R
0908-33-061 Taylor/
Abilene
CR Actual $140,634 6B REPLACE BRIDGE AND APPROACHES
0113-13-086 Travis/
Austin
SH 71 Actual $338,098 16R ACQUIRE ROW & CONST P O PARKING AT BURLESON RD
0114-02-072 Travis/
Austin
US 290 Actual $6,574,861 12 CONST ML BRIDGES & TURNAROUNDS
1149-01-018 Travis/
Austin
FM 812 Actual $121,890 11 REALIGN INTERSECTION
0038-01-047 Webb/
Laredo
US 83 Actual $196,082 4A UPGRADE TRAFFIC SIGNAL
0275-13-057 Wheeler/
Childress
IH 40 Actual $29,236,775 2 REHAB AND REMOVE RR OVERPASS
0043-09-101 Wichita/
Wichita Falls
US 287 Actual $3,571,021 7 SEAL COAT
0134-11-027 Wise/
Fort Worth
US 380 Actual $2,154,149 7 OVERLAY
0902-20-047 Wise/
Fort Worth
CR Actual $404,618 6B REPLACE BRIDGE


Let Status Definition
Tentative Estimated letting date for this project
Approved Project has administrative approval to be let
Actual Project was let to contract



Top...
Back...
 
Letting Schedule
Doing Business with TxDOT