Letting Schedule for December, 2000 (FY 2001)
![]() |
![]() |
![]() |
![]() |
![]() |
Letting Schedule for December, 2000 (FY 2001) | ||||
Last Update: Friday, August 31, 2001 | ||||
Updated from Design & Construction Information System (DCIS) on: August 31, 2001 | |
December, 2000 (FY 2001) | (see Links) |
SEP 2000 | OCT 2000 | NOV 2000 | DEC 2000 | JAN 2001 | FEB 2001 | MAR 2001 | APR 2001 | MAY 2001 | JUN 2001 | JUL 2001 | AUG 2001 | ||||||
CCSJ | County/ District |
Highway | Let Status | Contract Cost |
Fund Cat |
Description |
---|---|---|---|---|---|---|
0058-03-021 | Anderson/ Tyler |
SH 294 | Actual | $7,752,681 | 7 | SEAL COAT |
0911-00-042 | Angelina/ Lufkin |
VA | Actual | $295,454 | 10A | REPLACE EXPRESSWAY SIGNS |
0180-04-104 | Aransas/ Corpus Christi |
SH 35 | Actual | $973,350 | 6A | REPAIR BRIDGE FOUNDATION |
0073-08-138 | Bexar/ San Antonio |
IH 37 | Actual | $793,934 | 2 | CONSTRUCT RETAINING WALL AT MCCRELESS MALL |
0521-04-236 | Bexar/ San Antonio |
IH 410 | Actual | $18,854,998 | 3A | UPGRADE TO 10 LANE FREEWAY & TRAFFIC MANAGEMENT SYSTEM |
0915-12-173 | Bexar/ San Antonio |
CS | Actual | $2,246,204 | 4C | RECONSTRUCT & EXPAND 2 TO 4 LN W /CLTL (DRAINAGE) |
0330-01-025 | Bowie/ Atlanta |
FM 1840 | Actual | $1,267,828 | 8A | WIDEN TO ADD SHOULDERS, STRENGTHEN BASE AND RESURFACE |
0912-31-125 | Brazoria/ Houston |
VA | Actual | $331,955 | 11 | RAISE MBGF TO MEET STANDARDS |
0054-07-062 | Brown/ Fort Worth |
US 84 | Actual | $6,620,780 | 7 | SEAL COAT |
0007-01-047 | Callahan/ Abilene |
IH 20 | Actual | $5,992,970 | 2 | PLANING, HOT ASPHALT RUBBER UNDERSEAL, ASPHALT CONCRETE |
0437-04-022 | Callahan/ Abilene |
US 283 | Actual | $2,364,757 | 4F | EXTEND STRUCTRES, SAFETY END TREATMENT, BRIDGE RAIL, AND |
0331-03-017 | Cameron/ Pharr |
FM 1421 | Actual | $2,510,830 | 14 | RECONSTRUCT & ADD SHOULDERS |
0630-02-034 | Cameron/ Pharr |
FM 106 | Actual | $1,895,975 | 7 | WIDEN TO 4 LANE DIVIDED |
1232-03-012 | Camp/ Atlanta |
FM 1520 | Actual | $1,023,336 | 8B | REALIGN AND RECONSTRUCT SECTION OF EXISTING FM ROAD |
0218-03-074 | Cass/ Atlanta |
US 59 | Actual | $1,726,387 | 7 | RESURFACE EXISTNG 4-LANE DIVIDED HIGHWAY |
0043-01-065 | Childress/ Childress |
US 287 | Actual | $1,476,081 | 4F | FULL DEPTH PAVEMENT REPAIR |
0137-10-019 | Clay/ Wichita Falls |
FM 174 | Actual | $3,030,143 | 7 | SEAL COAT |
1350-01-015 | Clay/ Wichita Falls |
FM 1197 | Actual | $2,029,630 | 6A | REPLACE BRIDGE AND APPROACHES |
1035-02-006 | Coleman/ Brownwood |
FM 585 | Actual | $603,834 | 14 | SCARIFY EXISTING ROAD, ADD BASE AND SURFACE |
0280-02-036 | Collin/ Dallas |
SH 78 | Actual | $8,577,708 | 7 | SPOT BASE REPAIR, HOT MIX LEVEL-UP, HOT MIX OVERLAY AND PVMT. |
0903-15-061 | Cooke/ Wichita Falls |
CS | Actual | $668,008 | 6B | REPLACE BRIDGE AND APPROACHES |
1141-02-017 | Dallam/ Amarillo |
SH 102 | Actual | $5,182,125 | 4F | WIDEN NON-FREEWAY FACILITY |
0196-03-207 | Dallas/ Dallas |
IH 35E | Actual | $498,760 | 2 | CONSTRUCT RETAINING WALL-SLOPE EROSION PREVENTION |
0136-10-007 | Delta/ Paris |
FM 1528 | Actual | $1,265,701 | 7 | SEAL COAT |
1950-01-029 | Denton/ Dallas |
FM 407 | Actual | $165,163 | 10A | ADD LEFT & RIGHT TURN LANES |
1822-01-017 | Ector/ Odessa |
FM 1936 | Actual | $3,616,726 | 11 | WIDEN A NON-FREEWAY FACILITY TO PROVIDE FOR AN 85 FOOT CURB |
2296-01-043 | Ector/ Odessa |
SH 191 | Actual | $2,235,361 | 4F | REHABILITATION OF EXISTING ROAD |
2121-02-090 | El Paso/ El Paso |
IH 10 | Actual | $13,677,988 | 6B | RELOCATE AND CONSTRUCT ENTRANCE RAMPS |
0172-05-097 | Ellis/ Dallas |
US 287 | Actual | $513,822 | 10A | GUIDE SIGN REFURBISHING |
0261-01-034 | Ellis/ Dallas |
US 67 | Actual | $188,239 | 10A | GUIDE SIGN REFURBISHING |
0211-09-027 | Fayette/ Yoakum |
FM 155 | Actual | $1,384,888 | 16B | RESTORE ROADWAY |
0408-01-036 | Fayette/ Yoakum |
SH 159 | Actual | $3,294,521 | 14 | REHABILITATE ROADWAY |
0912-73-072 | Galveston/ Houston |
VA | Actual | $523,948 | 7 | REHAB OF A BRIDGE FACILITY CONSISTING OF JOINT & CRACK |
0912-73-073 | Galveston/ Houston |
VA | Actual | $965,119 | 14 | REHAB SIGNS |
0025-06-048 | Gonzales/ Yoakum |
US 90A | Actual | $1,701,658 | 7 | SEAL COAT |
0047-03-061 | Grayson/ Paris |
US 75 | Actual | $1,612,712 | 7 | SEAL COAT |
0925-09-011 | Hall/ Childress |
CR | Actual | $855,521 | 6B | REPLACE BRIDGE AND APPROACHES |
0177-11-136 | Harris/ Houston |
US 59 | Actual | $317,095 | 7 | REPAIR BRIDGE AND EXPANSION JOINTS |
0271-17-137 | Harris/ Houston |
IH 610 | Actual | $684,274 | 11 | SHOULDER RECONSTRUCTION, RAMP REHABILITATION, SIGNING AND |
0500-03-500 | Harris/ Houston |
IH 45 | Actual | $1,828,027 | 7 | REPAIR AND REHAB APPROACH SLAB, ARMOR JOINT AND REPLACE |
0912-00-195 | Harris/ Houston |
VA | Actual | $1,522,891 | 11 | STRIPING |
0912-00-201 | Harris/ Houston |
VA | Actual | $812,500 | 5 | FY 2001 CLEAN AIR COALITION (CAC) OUTREACH PROGRAM |
0912-71-725 | Harris/ Houston |
VA | Actual | $654,914 | 11 | STRIPING |
0912-71-726 | Harris/ Houston |
VA | Actual | $283,483 | 11 | SMALL SIGN UPGRADE |
0912-71-728 | Harris/ Houston |
VA | Actual | $274,537 | 11 | SMALL SIGN UPGRADE |
3256-01-073 | Harris/ Houston |
BW 8 | Actual | $202,240 | 5 | FOR THE CONSTRUCTION OF ADDITIONAL RT TURN LANES CONSISTING |
0697-02-049 | Henderson/ Tyler |
FM 85 | Actual | $4,098,436 | 8A | REHABILITATE ROADWAY |
1802-01-032 | Hidalgo/ Pharr |
FM 1924 | Actual | $4,244,100 | 4C | IMPROVE TRAFFIC SIGNAL, ADD THROUGH LANES AND CONTINUOUS |
0014-05-033 | Hill/ Waco |
SH 81 | Actual | $5,956,108 | 7 | SEAL COAT |
0005-05-092 | Howard/ Abilene |
IH 20 | Actual | $3,179,782 | 2 | LIME TREAT SUBGRADE AND FLEXIBLE BASE, ASPHALT STABILIZED |
0068-07-046 | Howard/ Abilene |
US 87 | Actual | $4,628,368 | 4F | RECONSTRUCT NORTH BOUND LANE, REHABILITATE SOUTH BOUND LANE, |
0136-01-056 | Hunt/ Paris |
SH 224 | Actual | $1,264,154 | 7 | SEAL COAT |
0089-04-072 | Jackson/ Yoakum |
US 59 | Actual | $2,009,646 | 7 | SEAL COAT |
0028-06-063 | Jefferson/ Beaumont |
US 90 | Actual | $4,991,671 | 7 | SEAL COAT |
1227-01-021 | Jim Hogg/ Pharr |
FM 1017 | Actual | $6,083,846 | 4F | RECONSTRUCT AND ADD SHOULDERS |
0019-02-025 | Johnson/ Fort Worth |
SH 171 | Actual | $977,829 | 7 | MILL AND OVERLAY |
1094-04-011 | Johnson/ Fort Worth |
FM 731 | Actual | $2,888,313 | 8A | ADD SHOULDERS, WIDEN STRUCTURES, OVERLAY AND STRIPE |
1294-02-018 | Karnes/ Corpus Christi |
FM 1144 | Actual | $1,172,439 | 11 | REHABILITATE ROADWAY |
0197-04-066 | Kaufman/ Dallas |
US 175 | Actual | $164,813 | 10A | INSTALLATION OF SAFETY LIGHTING |
0018-09-004 | La Salle/ Laredo |
BI 35-C | Actual | $82,277 | 10A | UPGRADE OF EXISTING FLASHING BEACON |
0673-02-008 | Limestone/ Waco |
FM 1951 | Actual | $1,260,864 | 7 | SEAL COAT |
0074-02-060 | Live Oak/ Corpus Christi |
IH 37 | Actual | $4,602,168 | 2 | NBL /SBL HOT MIX OVERLAY (TY'C') |
0117-04-035 | Madison/ Bryan |
US 190 | Actual | $46,468 | 4A | MISCELLANEOUS WORK CONSISTING OF THE INSTALLATION OF |
0915-45-025 | Medina/ San Antonio |
CR | Actual | $626,436 | 6B | REPLACE BRIDGE & APPROACHES |
0463-02-054 | Midland/ Odessa |
BS 158B | Actual | $3,896,251 | 3C | REHABILITATION OF EXISTING ROAD |
0338-03-083 | Montgomery/ Houston |
SH 105 | Actual | $170,815 | 10A | UPGRADE EXISTING FLASHING BEACON TO A FULL-ACTUATED TRAFFIC |
0162-03-037 | Navarro/ Dallas |
SH 31 | Actual | $5,487,320 | 3B | CONSTRUCT 4 LANE DIVIDED FROM 2 LANE UNDIVIDED |
0007-08-023 | Palo Pinto/ Fort Worth |
SH 16 | Actual | $3,349,922 | 7 | SEAL COAT |
0008-01-043 | Palo Pinto/ Fort Worth |
US 180 | Actual | $877,305 | 7 | MILL AND OVERLAY |
0171-03-055 | Parker/ Fort Worth |
SH 199 | Actual | $776,810 | 7 | MICROSURFACING |
0213-05-033 | Polk/ Lufkin |
US 190 | Actual | $1,066,254 | 4E | EXTEND & SAFETY TREAT STRUCTURES & CLEAR R.O.W. |
0957-08-021 | Presidio/ El Paso |
FM 170 | Actual | $3,839,093 | 8A | REHABILITATION |
0330-04-004 | Red River/ Paris |
FM 44 | Actual | $1,723,151 | 7 | SEAL COAT |
0191-01-067 | Smith/ Tyler |
US 69 | Actual | $468,200 | 7 | RESURFACE ROADWAY TO MAINTAIN DESIRED RIDING SURFACE |
0008-06-044 | Tarrant/ Fort Worth |
SH 180 | Actual | $1,186,801 | 7 | ROTOMILL PLANT MIX SEAL AND OVERLAY |
0008-12-082 | Tarrant/ Fort Worth |
SH 183 | Actual | $570,044 | 7 | MICROSURFACING MAIN LANES |
0902-48-188 | Tarrant/ Fort Worth |
CS | Actual | $1,939,730 | 4C | WIDENING 2 LANES TO 4 LANES |
0902-48-450 | Tarrant/ Fort Worth |
CS | Actual | $204,000 | 4C | RIGHT OF WAY ACQUISITION |
2374-05-056 | Tarrant/ Fort Worth |
IH 20 | Actual | $347,845 | 11 | REPAIR PAVEMENT AND LENGTHEN STORAGE ON WESTBOUND FRONTAGE R |
0908-33-061 | Taylor/ Abilene |
CR | Actual | $140,634 | 6B | REPLACE BRIDGE AND APPROACHES |
0113-13-086 | Travis/ Austin |
SH 71 | Actual | $338,098 | 16R | ACQUIRE ROW & CONST P O PARKING AT BURLESON RD |
0114-02-072 | Travis/ Austin |
US 290 | Actual | $6,574,861 | 12 | CONST ML BRIDGES & TURNAROUNDS |
1149-01-018 | Travis/ Austin |
FM 812 | Actual | $121,890 | 11 | REALIGN INTERSECTION |
0038-01-047 | Webb/ Laredo |
US 83 | Actual | $196,082 | 4A | UPGRADE TRAFFIC SIGNAL |
0275-13-057 | Wheeler/ Childress |
IH 40 | Actual | $29,236,775 | 2 | REHAB AND REMOVE RR OVERPASS |
0043-09-101 | Wichita/ Wichita Falls |
US 287 | Actual | $3,571,021 | 7 | SEAL COAT |
0134-11-027 | Wise/ Fort Worth |
US 380 | Actual | $2,154,149 | 7 | OVERLAY |
0902-20-047 | Wise/ Fort Worth |
CR | Actual | $404,618 | 6B | REPLACE BRIDGE |
Top... Back... Letting Schedule Doing Business with TxDOT |