Detail Letting Schedule for Bexar County (FY 2010)
Detail Letting Schedule for Bexar County (FY 2010) | ||||
Last Update: Tuesday, November 2, 2010 |
Bexar County (FY 2010) |
CCSJ: 0017-02-073 | |||
District: | San Antonio | Let Date: | FEB 2010 |
Highway: | IH 35 | Let Status: | Actual |
Project ID: | IM 0351(332) | CSJ: | 0017-02-073 |
Description: | MILL, SEAL COAT, OVERLAY & PAVEMENT MARKINGS | Handling Code: |
|
Limits From: | 0.1 MI SOUTH OF THE MEDINA RIVER | Fund Cat: | 1 |
Limits To: | 0.3 M SOUTH OF IH 410 | Estimate: | $1,030,221 |
Length: | 2.2 Miles | Actual: | $924,077 |
Back... |
Totals for 0017-02-073 | ||
---|---|---|---|
Length: | 2.2 Miles | ||
Estimate: | $1,030,221 | ||
Actual: | $924,077 | ||
CCSJ: 0017-10-225 | |||
District: | San Antonio | Let Date: | SEP 2009 |
Highway: | IH 35 | Let Status: | Actual |
Project ID: | IM 0352(330) | CSJ: | 0017-10-225 |
Description: | BRIDGE DECK REPAIR | Handling Code: |
|
Limits From: | MARTIN STREET | Fund Cat: | 1 |
Limits To: | FLORES STREET | Estimate: | $561,302 |
Length: | 0.3 Miles | Actual: | $566,926 |
Back... |
Totals for 0017-10-225 | ||
Length: | 0.3 Miles | ||
Estimate: | $561,302 | ||
Actual: | $566,926 | ||
CCSJ: 0017-10-244 | |||
District: | San Antonio | Let Date: | AUG 2010 |
Highway: | IH 35 | Let Status: | Actual |
Project ID: | C 17-10-244 | CSJ: | 0017-10-244 |
Description: | HIGH MAST ILLUMINATION | Handling Code: |
|
Limits From: | AT US 281 | Fund Cat: | 1 |
Limits To: | . | Estimate: | $720,798 |
Length: | 0.5 Miles | Actual: | $589,660 |
Project Addenda Bid Tabulations Back... |
Totals for 0017-10-244 | ||
Length: | 0.5 Miles | ||
Estimate: | $720,798 | ||
Actual: | $589,660 | ||
CCSJ: 0017-10-250 | |||
District: | San Antonio | Let Date: | AUG 2010 |
Highway: | IH 35 | Let Status: | Actual |
Project ID: | C 17-10-250 | CSJ: | 0017-10-250 |
Description: | INSTALL CONCRETE MEDIAN BARRIER & ILLUMINATION | Handling Code: |
|
Limits From: | 0.995 MI S OF RITTIMAN RD | Fund Cat: | 1 |
Limits To: | 0.155 MI S OF RITTIMAN RD | Estimate: | $201,738 |
Length: | 0.8 Miles | Actual: | $246,290 |
District: | San Antonio | Let Date: | AUG 2010 |
Highway: | IH 410 | Let Status: | Actual |
Project ID: | C 521-6-132 | CSJ: | 0521-06-132 |
Description: | INSTALL CONCRETE MEDIAN BARRIER & ILLUMINATION | Handling Code: |
|
Limits From: | IH 10 EAST | Fund Cat: | 1 |
Limits To: | IH 35 NORTH | Estimate: | $1,803,047 |
Length: | 3.1 Miles | Actual: | $1,994,355 |
Bid Tabulations Back... |
Totals for 0017-10-250 | ||
Length: | 3.9 Miles | ||
Estimate: | $2,004,785 | ||
Actual: | $2,240,645 | ||
CCSJ: 0017-11-037 | |||
District: | San Antonio | Let Date: | JUN 2010 |
Highway: | SP 536 | Let Status: | Actual |
Project ID: | NH 2010(913) | CSJ: | 0017-11-037 |
Description: | SEAL COAT, OVERLAY, & PAVEMENT MARKINGS | Handling Code: |
|
Limits From: | IH 35 | Fund Cat: | 1 |
Limits To: | STEVES AVENUE | Estimate: | $967,721 |
Length: | 2.1 Miles | Actual: | $867,898 |
District: | San Antonio | Let Date: | JUN 2010 |
Highway: | SP 536 | Let Status: | Actual |
Project ID: | NH 2010(913) | CSJ: | 0073-02-065 |
Description: | SEAL COAT, OVERLAY, PAVEMENT MARKINGS | Handling Code: |
|
Limits From: | ASHLEY RD | Fund Cat: | 1 |
Limits To: | IH 410 | Estimate: | $280,748 |
Length: | 0.9 Miles | Actual: | $266,088 |
District: | San Antonio | Let Date: | JUN 2010 |
Highway: | SP 536 | Let Status: | Actual |
Project ID: | NH 2010(913) | CSJ: | 0253-06-034 |
Description: | SEAL COAT, OVERLAY, & PAVEMENT MARKINGS | Handling Code: |
|
Limits From: | STEVES AVE | Fund Cat: | 1 |
Limits To: | ASHLEY RD | Estimate: | $1,564,463 |
Length: | 4.1 Miles | Actual: | $1,341,113 |
Back... |
Totals for 0017-11-037 | ||
Length: | 7.1 Miles | ||
Estimate: | $2,812,932 | ||
Actual: | $2,475,099 | ||
CCSJ: 0025-02-175 | |||
District: | San Antonio | Let Date: | MAY 2010 |
Highway: | IH 10 | Let Status: | Actual |
Project ID: | IM 0104(361) | CSJ: | 0025-02-175 |
Description: | CONSTRUCT LANDSCAPE AND IRRIGATION SYSTEM | Handling Code: |
|
Limits From: | IH 10E | Fund Cat: | 10 |
Limits To: | @IH 410 | Estimate: | $524,002 |
Length: | 0.0 Miles | Actual: | $440,483 |
Back... |
Totals for 0025-02-175 | ||
Length: | 0.0 Miles | ||
Estimate: | $524,002 | ||
Actual: | $440,483 | ||
CCSJ: 0025-02-186 | |||
District: | San Antonio | Let Date: | JUL 2010 |
Highway: | IH 10 | Let Status: | Actual |
Project ID: | IM 0104(363) | CSJ: | 0025-02-186 |
Description: | INSTALL MEDIAN BARRIER (WIRE ROPE / CABLE SAFETY SYSTEM) | Handling Code: |
|
Limits From: | 0.2 MI EAST OF FM 2538 | Fund Cat: | 1 |
Limits To: | BEXAR/GUADALUPE COUNTY LINE | Estimate: | $53,033 |
Length: | 0.4 Miles | Actual: | $36,671 |
District: | San Antonio | Let Date: | JUL 2010 |
Highway: | IH 10 | Let Status: | Actual |
Project ID: | C 25-3-86 | CSJ: | 0025-03-086 |
Description: | INSTALL MEDIAN BARRIER (WIRE ROPE / CABLE SAFETY SYSTEM) | Handling Code: |
|
Limits From: | BEXAR/GUADALUPE COUNTY LINE | Fund Cat: | 1 |
Limits To: | SCHWAB | Estimate: | $554,487 |
Length: | 6.5 Miles | Actual: | $384,340 |
District: | San Antonio | Let Date: | JUL 2010 |
Highway: | IH 10 | Let Status: | Actual |
Project ID: | IM 0104(363) | CSJ: | 0025-03-087 |
Description: | INSTALL MEDIAN BARRIER (WIRE ROPE / CABLE SAFETY SYSTEM) | Handling Code: |
|
Limits From: | 0.4 MI EAST OF FM 775 | Fund Cat: | 1 |
Limits To: | 0.2 MI WEST OF US 90 | Estimate: | $134,224 |
Length: | 1.4 Miles | Actual: | $97,161 |
District: | San Antonio | Let Date: | JUL 2010 |
Highway: | IH 10 | Let Status: | Actual |
Project ID: | IM 0104(363) | CSJ: | 0535-01-060 |
Description: | INSTALL MEDIAN BARRIER (WIRE ROPE / CABLE SAFETY SYSTEM) | Handling Code: |
|
Limits From: | 0.2 MI WEST OF US 90 | Fund Cat: | 1 |
Limits To: | 0.2 MI WEST OF BS 123-B | Estimate: | $512,775 |
Length: | 5.7 Miles | Actual: | $357,250 |
District: | San Antonio | Let Date: | JUL 2010 |
Highway: | IH 10 | Let Status: | Actual |
Project ID: | IM 0104(363) | CSJ: | 0535-01-061 |
Description: | INSTALL MEDIAN BARRIER (WIRE ROPE / CABLE SAFETY SYSTEM) | Handling Code: |
|
Limits From: | 0.1 MI EAST OF SH 123 | Fund Cat: | 1 |
Limits To: | 2.45 MI EAST OF US 90 | Estimate: | $352,453 |
Length: | 3.9 Miles | Actual: | $246,597 |
District: | San Antonio | Let Date: | JUL 2010 |
Highway: | IH 10 | Let Status: | Actual |
Project ID: | IM 0104(363) | CSJ: | 0535-02-041 |
Description: | INSTALL MEDIAN BARRIER (WIRE ROPE / CABLE SAFETY SYSTEM) | Handling Code: |
|
Limits From: | FM 1104 | Fund Cat: | 1 |
Limits To: | 0.7 MI WEST OF SH 80 | Estimate: | $690,793 |
Length: | 7.3 Miles | Actual: | $483,134 |
District: | San Antonio | Let Date: | JUL 2010 |
Highway: | IH 10 | Let Status: | Actual |
Project ID: | IM 0104(363) | CSJ: | 0535-02-042 |
Description: | INSTALL MEDIAN BARRIER (WIRE ROPE / CABLE SAFETY SYSTEM) | Handling Code: |
|
Limits From: | 2.5 MI E OF US 90 | Fund Cat: | 1 |
Limits To: | 1.0 MI W OF FM 2438 | Estimate: | $90,588 |
Length: | 2.2 Miles | Actual: | $63,720 |
Back... |
Totals for 0025-02-186 | ||
Length: | 27.4 Miles | ||
Estimate: | $2,388,353 | ||
Actual: | $1,668,873 | ||
CCSJ: 0025-09-073 | |||
District: | San Antonio | Let Date: | DEC 2009 |
Highway: | FM 78 | Let Status: | Actual |
Project ID: | NH 2010(086) | CSJ: | 0025-09-073 |
Description: | SEAL COAT, OVERLAY, & PAVEMENT MARKINGS | Handling Code: |
|
Limits From: | IH 410 | Fund Cat: | 1 |
Limits To: | LP 1604 | Estimate: | $2,366,674 |
Length: | 5.5 Miles | Actual: | $1,496,694 |
Back... |
Totals for 0025-09-073 | ||
Length: | 5.5 Miles | ||
Estimate: | $2,366,674 | ||
Actual: | $1,496,694 | ||
CCSJ: 0072-08-121 | |||
District: | San Antonio | Let Date: | AUG 2010 |
Highway: | IH 10 | Let Status: | Actual |
Project ID: | BR 2009(169) | CSJ: | 0072-08-121 |
Description: | REHAB BRIDGE & APPROACHES | Handling Code: |
|
Limits From: | EB FR AT LEON CREEK | Fund Cat: | 6 |
Limits To: | . | Estimate: | $713,922 |
Length: | 0.0 Miles | Actual: | $673,765 |
Bid Tabulations Back... |
Totals for 0072-08-121 | ||
Length: | 0.0 Miles | ||
Estimate: | $713,922 | ||
Actual: | $673,765 | ||
CCSJ: 0253-04-139 | |||
District: | San Antonio | Let Date: | JUN 2010 |
Highway: | US 281 | Let Status: | Actual |
Project ID: | STP 2009(653)ES | CSJ: | 0253-04-139 |
Description: | EXPAND INTERCHANGE WITH SOUTHERN DIRECT CONN'S (PHASE 1) | Handling Code: |
XX |
Limits From: | AT LP 1604 | Fund Cat: | 2 |
Limits To: | . | Estimate: | $80,000,000 |
Length: | 1.6 Miles | Actual: | $80,000,000 |
District: | San Antonio | Let Date: | JUN 2010 |
Highway: | US 281 | Let Status: | Actual |
Project ID: | C 253-4-141 | CSJ: | 0253-04-141 |
Description: | EXPAND INTERCHANGE WITH SOUTHERN DIRECT CONN'S (PHASE 1) | Handling Code: |
XX |
Limits From: | AT LP 1604 | Fund Cat: | 2 |
Limits To: | . | Estimate: | $40,814,636 |
Length: | 1.6 Miles | Actual: | $50,993,477 |
Back... |
Totals for 0253-04-139 | ||
Length: | 3.2 Miles | ||
Estimate: | 120,814,636 | ||
Actual: | 130,993,477 | ||
CCSJ: 0253-04-140 | |||
District: | San Antonio | Let Date: | FEB 2010 |
Highway: | US 281 | Let Status: | Actual |
Project ID: | STP 2009(484)ES | CSJ: | 0253-04-140 |
Description: | OPERATIONAL IMPROVEMENTS AND RECONFIGURE INTERSECTIONS AT | Handling Code: |
LC |
Limits From: | REDLAND ROAD | Fund Cat: | 7 |
Limits To: | NORTH OF MARSHALL ROAD | Estimate: | $6,368,680 |
Length: | 3.4 Miles | Actual: | $5,156,792 |
Back... |
Totals for 0253-04-140 | ||
Length: | 3.4 Miles | ||
Estimate: | $6,368,680 | ||
Actual: | $5,156,792 | ||
CCSJ: 0291-10-097 | |||
District: | San Antonio | Let Date: | SEP 2009 |
Highway: | SH 16 | Let Status: | Actual |
Project ID: | STP 2010(087)ESTE | CSJ: | 0291-10-097 |
Description: | LANDSCAPE PLANTING, IRRIGATION SYSTEM, & SPECIALIZED PAVING | Handling Code: |
|
Limits From: | AT LP 1604 | Fund Cat: | 10 |
Limits To: | . | Estimate: | $276,690 |
Length: | 0.5 Miles | Actual: | $239,457 |
Back... |
Totals for 0291-10-097 | ||
Length: | 0.5 Miles | ||
Estimate: | $276,690 | ||
Actual: | $239,457 | ||
CCSJ: 0521-04-261 | |||
District: | San Antonio | Let Date: | SEP 2009 |
Highway: | IH 410 | Let Status: | Actual |
Project ID: | STP 2010(089)ESTE | CSJ: | 0521-04-261 |
Description: | LANDSCAPE DEVELOPMENT | Handling Code: |
|
Limits From: | AT IH 10 | Fund Cat: | 10 |
Limits To: | . | Estimate: | $1,271,392 |
Length: | 0.0 Miles | Actual: | $962,118 |
Back... |
Totals for 0521-04-261 | ||
Length: | 0.0 Miles | ||
Estimate: | $1,271,392 | ||
Actual: | $962,118 | ||
CCSJ: 0658-01-038 | |||
District: | San Antonio | Let Date: | JAN 2010 |
Highway: | FM 1535 | Let Status: | Actual |
Project ID: | STP 2010(260) | CSJ: | 0658-01-038 |
Description: | SEAL COAT, OVERLAY, & PAVEMENT MARKINGS | Handling Code: |
|
Limits From: | LOOP 1604 | Fund Cat: | 1 |
Limits To: | HUEBNER ROAD | Estimate: | $402,826 |
Length: | 1.6 Miles | Actual: | $316,927 |
Back... |
Totals for 0658-01-038 | ||
Length: | 1.6 Miles | ||
Estimate: | $402,826 | ||
Actual: | $316,927 | ||
CCSJ: 0915-00-147 | |||
District: | San Antonio | Let Date: | OCT 2009 |
Highway: | VA | Let Status: | Actual |
Project ID: | STP 2010(162) | CSJ: | 0915-00-147 |
Description: | DISTRICTWIDE TRAFFIC CONTROL DEVICE FY 2010 (PROJECT 1) | Handling Code: |
|
Limits From: | DISTRICTWIDE TRAFFIC CNTRL FY 2010 | Fund Cat: | 11 |
Limits To: | (PROJECT 1) | Estimate: | $764,081 |
Length: | 0.0 Miles | Actual: | $753,306 |
Back... |
Totals for 0915-00-147 | ||
Length: | 0.0 Miles | ||
Estimate: | $764,081 | ||
Actual: | $753,306 | ||
CCSJ: 0915-00-148 | |||
District: | San Antonio | Let Date: | OCT 2009 |
Highway: | VA | Let Status: | Actual |
Project ID: | STP 2010(170) | CSJ: | 0915-00-148 |
Description: | DISTRICTWIDE TRAFFIC CONTROL DEVICE FY 2010 (PROJECT 2) | Handling Code: |
|
Limits From: | DISTRICTWIDE TRAFFIC CNTRL FY 2010 | Fund Cat: | 11 |
Limits To: | (PROJECT 2) | Estimate: | $696,324 |
Length: | 0.0 Miles | Actual: | $687,330 |
Back... |
Totals for 0915-00-148 | ||
Length: | 0.0 Miles | ||
Estimate: | $696,324 | ||
Actual: | $687,330 | ||
CCSJ: 0915-12-224 | |||
District: | San Antonio | Let Date: | AUG 2010 |
Highway: | MH | Let Status: | Actual |
Project ID: | C 915-12-224 | CSJ: | 0915-12-224 |
Description: | CONSTRUCT 4 LANE DIVIDED ROADWAY ON NEW LOCATION | Handling Code: |
|
Limits From: | WURZBACH PARKWAY ON NEW LOCATION | Fund Cat: | 2 |
Limits To: | FROM FM 2696 TO WEST AVE | Estimate: | $28,245,997 |
Length: | 1.5 Miles | Actual: | $24,686,408 |
District: | San Antonio | Let Date: | AUG 2010 |
Highway: | MH | Let Status: | Actual |
Project ID: | RW 8000-15-7 | CSJ: | 8000-15-007 |
Description: | ACQUISITION OF RIGHT OF WAY | Handling Code: |
|
Limits From: | ON EAST-WEST PKWY FROM LOCKHILL-SEL | Fund Cat: | 2 |
Limits To: | IH 35 IN SAN ANTONIO | Estimate: | $1 |
Length: | 0.0 Miles | Actual: | $1,762,476 |
Bid Tabulations Back... |
Totals for 0915-12-224 | ||
Length: | 1.5 Miles | ||
Estimate: | $28,245,998 | ||
Actual: | $26,448,884 | ||
CCSJ: 0915-12-322 | |||
District: | San Antonio | Let Date: | JAN 2010 |
Highway: | CS | Let Status: | Actual |
Project ID: | STP 2003(559)ES | CSJ: | 0915-12-322 |
Description: | EXPAND ROADWAY TO 4 LANES W / CURBS & SIDEWALKS | Handling Code: |
LC |
Limits From: | IN SAN ANTONIO ON 36TH STREET FROM | Fund Cat: | 7 |
Limits To: | US 90 TO GROWDON | Estimate: | $4,500,000 |
Length: | 0.4 Miles | Actual: | $3,297,539 |
Back... |
Totals for 0915-12-322 | ||
Length: | 0.4 Miles | ||
Estimate: | $4,500,000 | ||
Actual: | $3,297,539 | ||
CCSJ: 0915-12-329 | |||
District: | San Antonio | Let Date: | DEC 2009 |
Highway: | CS | Let Status: | Actual |
Project ID: | STP 2000(148)ES | CSJ: | 0915-12-329 |
Description: | RECONSTRUCT & EXPAND 3 TO 4 LANES | Handling Code: |
LC |
Limits From: | ON JONES MALTSBERGER FROM US 281 | Fund Cat: | 7 |
Limits To: | EAST OF UPRR TRACKS | Estimate: | $4,000,000 |
Length: | 0.1 Miles | Actual: | $1,047,285 |
Back... |
Totals for 0915-12-329 | ||
Length: | 0.1 Miles | ||
Estimate: | $4,000,000 | ||
Actual: | $1,047,285 | ||
CCSJ: 0915-12-349 | |||
District: | San Antonio | Let Date: | NOV 2009 |
Highway: | CS | Let Status: | Actual |
Project ID: | HP 1232(1) | CSJ: | 0915-12-349 |
Description: | EAGLELAND / RIVERWALK LINK TO MISSION TRAILS - PEDESTRIAN PHASE | Handling Code: |
LC |
Limits From: | 0.1 MI SOUTH OF ALAMO ST. | Fund Cat: | 10 |
Limits To: | GUENTHER ST. | Estimate: | $2,218,200 |
Length: | 0.3 Miles | Actual: | $3,182,751 |
Back... |
Totals for 0915-12-349 | ||
Length: | 0.3 Miles | ||
Estimate: | $2,218,200 | ||
Actual: | $3,182,751 | ||
CCSJ: 0915-12-375 | |||
District: | San Antonio | Let Date: | APR 2010 |
Highway: | CS | Let Status: | Actual |
Project ID: | STP 2000(624)ESTE | CSJ: | 0915-12-375 |
Description: | CONSTRUCT HIKE AND BIKE TRAILS ALONG SALADO CREEK (PH 1) | Handling Code: |
LC |
Limits From: | COMMANCHE PARK (US 87) | Fund Cat: | 9 |
Limits To: | WILLOW SPRINGS GOLF COURSE (HOUSTON | Estimate: | $2,660,000 |
Length: | 2.9 Miles | Actual: | $1,301,990 |
Back... |
Totals for 0915-12-375 | ||
Length: | 2.9 Miles | ||
Estimate: | $2,660,000 | ||
Actual: | $1,301,990 | ||
CCSJ: 0915-12-402 | |||
District: | San Antonio | Let Date: | MAR 2010 |
Highway: | CS | Let Status: | Actual |
Project ID: | STP 2002(184)ESTE | CSJ: | 0915-12-402 |
Description: | CONSTRUCTING HIKE & BIKE TRAILS (PHASE II) ALONG SALADO CRK | Handling Code: |
LC |
Limits From: | ALONG SALADO CREEK FROM HOUSTON ST | Fund Cat: | 9 |
Limits To: | JACK WHITE PARK, N OF OLD SEGUIN RD | Estimate: | $2,999,853 |
Length: | 2.7 Miles | Actual: | $2,005,430 |
Back... |
Totals for 0915-12-402 | ||
Length: | 2.7 Miles | ||
Estimate: | $2,999,853 | ||
Actual: | $2,005,430 | ||
CCSJ: 0915-12-418 | |||
District: | San Antonio | Let Date: | MAY 2010 |
Highway: | VA | Let Status: | Actual |
Project ID: | DMO 2004(424)ES | CSJ: | 0915-12-418 |
Description: | EXTEND 36TH ST ALONG EXISTING FRANK LUKE RD - EXPAND TO_4 LN | Handling Code: |
LC |
Limits From: | GROWDEN | Fund Cat: | 10 |
Limits To: | BILLY MITCHELL | Estimate: | $20,000,000 |
Length: | 1.4 Miles | Actual: | $13,252,146 |
District: | San Antonio | Let Date: | MAY 2010 |
Highway: | VA | Let Status: | Actual |
Project ID: | DMO 2003(964) | CSJ: | 0915-12-474 |
Description: | EXPAND TO 4 LANE DIVIDED WITH RAISED MEDIAN | Handling Code: |
FC |
Limits From: | GROWDEN | Fund Cat: | 10 |
Limits To: | BILLY MITCHELL | Estimate: | $20,000,000 |
Length: | 1.4 Miles | Actual: | $248,375 |
District: | San Antonio | Let Date: | MAY 2010 |
Highway: | VA | Let Status: | Actual |
Project ID: | DMO 2003(965) | CSJ: | 0915-12-475 |
Description: | EXPAND TO 4 LANE DIVIDED WITH RAISED MEDIAN | Handling Code: |
FC |
Limits From: | GROWDEN | Fund Cat: | 10 |
Limits To: | BILLY MITCHELL | Estimate: | $20,000,000 |
Length: | 1.4 Miles | Actual: | $844,475 |
District: | San Antonio | Let Date: | MAY 2010 |
Highway: | VA | Let Status: | Actual |
Project ID: | HP 2010(626) | CSJ: | 0915-12-476 |
Description: | EXPAND TO 4 LANE DIVIDED WITH RAISED MEDIAN | Handling Code: |
FC |
Limits From: | GROWDEN | Fund Cat: | 10 |
Limits To: | BILLY MITCHELL | Estimate: | $20,000,000 |
Length: | 1.4 Miles | Actual: | $2,103,093 |
District: | San Antonio | Let Date: | MAY 2010 |
Highway: | VA | Let Status: | Actual |
Project ID: | HP 2010(627) | CSJ: | 0915-12-477 |
Description: | EXPAND TO 4 LANE DIVIDED WITH RAISED MEDIAN | Handling Code: |
FC |
Limits From: | GROWDEN | Fund Cat: | 10 |
Limits To: | BILLY MITCHELL | Estimate: | $20,000,000 |
Length: | 1.4 Miles | Actual: | $2,503,688 |
Back... |
Totals for 0915-12-418 | ||
Length: | 7.0 Miles | ||
Estimate: | 100,000,000 | ||
Actual: | $18,951,777 | ||
CCSJ: 0915-12-440 | |||
District: | San Antonio | Let Date: | AUG 2010 |
Highway: | CS | Let Status: | Actual |
Project ID: | STP 2010(368)MM | CSJ: | 0915-12-440 |
Description: | RECONSTRUCT EXIST ROADWAY, ADD SIDEWALKS, BIKE LANES AND | Handling Code: |
LC |
Limits From: | ON WALTER ST, FROM IH 35 | Fund Cat: | 7 |
Limits To: | FORT SAM HOUSTON ENTRANCE | Estimate: | $7,982,000 |
Length: | 0.4 Miles | Actual: | $4,185,032 |
Back... |
Totals for 0915-12-440 | ||
Length: | 0.4 Miles | ||
Estimate: | $7,982,000 | ||
Actual: | $4,185,032 | ||
CCSJ: 0915-12-465 | |||
District: | San Antonio | Let Date: | MAY 2010 |
Highway: | CS | Let Status: | Actual |
Project ID: | STP 2010(380)MM | CSJ: | 0915-12-465 |
Description: | RIGHT OF WAY ACQUISITION | Handling Code: |
XX |
Limits From: | ON WALTER ST, FROM IH 35 | Fund Cat: | 7 |
Limits To: | FORT SAM HOUSTON ENTRANCE | Estimate: | $1,200,000 |
Length: | 0.4 Miles | Actual: | |
Back... |
Totals for 0915-12-465 | ||
Length: | 0.4 Miles | ||
Estimate: | $1,200,000 | ||
Actual: | |||
CCSJ: 0915-12-466 | |||
District: | San Antonio | Let Date: | MAY 2010 |
Highway: | CS | Let Status: | Actual |
Project ID: | STP 2009(786)ES | CSJ: | 0915-12-466 |
Description: | INSTALL WARNING DEVICES AT 7 LOW WATER CROSSINGS IN THE CITY | Handling Code: |
LC |
Limits From: | IN SAN ANTONIO | Fund Cat: | 7 |
Limits To: | AT VARIOUS LOCATIONS | Estimate: | $550,000 |
Length: | 0.0 Miles | Actual: | $617,584 |
Back... |
Totals for 0915-12-466 | ||
Length: | 0.0 Miles | ||
Estimate: | $550,000 | ||
Actual: | $617,584 | ||
CCSJ: 0915-12-467 | |||
District: | San Antonio | Let Date: | MAY 2010 |
Highway: | CS | Let Status: | Actual |
Project ID: | STP 2009(787)ES | CSJ: | 0915-12-467 |
Description: | EAGLELAND / RIVERWALK LINK TO MISSION TRAILS | Handling Code: |
LC |
Limits From: | EAGLELAND | Fund Cat: | 7 |
Limits To: | LONESTAR | Estimate: | $750,000 |
Length: | 0.2 Miles | Actual: | $403,074 |
Back... |
Totals for 0915-12-467 | ||
Length: | 0.2 Miles | ||
Estimate: | $750,000 | ||
Actual: | $403,074 | ||
CCSJ: 0915-12-469 | |||
District: | San Antonio | Let Date: | NOV 2009 |
Highway: | VA | Let Status: | Actual |
Project ID: | STP 2010(485)MM | CSJ: | 0915-12-469 |
Description: | ALAMO AREA COMMUTE SOLUTION PGM - FY 2009 | Handling Code: |
XX |
Limits From: | IN SAN ANTONIO/BEXAR CO AREA | Fund Cat: | 7 |
Limits To: | . | Estimate: | $267,000 |
Length: | 0.0 Miles | Actual: | $267,000 |
Back... |
Totals for 0915-12-469 | ||
Length: | 0.0 Miles | ||
Estimate: | $267,000 | ||
Actual: | $267,000 | ||
CCSJ: 0915-12-473 | |||
District: | San Antonio | Let Date: | AUG 2010 |
Highway: | VA | Let Status: | Actual |
Project ID: | STP 2011(517)MM | CSJ: | 0915-12-473 |
Description: | ALAMO AREA COMMUTE SOLUTION PGM - FY 2010 | Handling Code: |
XX |
Limits From: | IN SAN ANTONIO/BEXAR CO AREA | Fund Cat: | 7 |
Limits To: | . | Estimate: | $267,000 |
Length: | 0.0 Miles | Actual: | $267,000 |
Back... |
Totals for 0915-12-473 | ||
Length: | 0.0 Miles | ||
Estimate: | $267,000 | ||
Actual: | $267,000 | ||
CCSJ: 1437-01-035 | |||
District: | San Antonio | Let Date: | SEP 2009 |
Highway: | FM 1346 | Let Status: | Actual |
Project ID: | STP 2010(093) | CSJ: | 1437-01-035 |
Description: | SEAL COAT, OVERLAY & PAVEMENT MARKINGS | Handling Code: |
|
Limits From: | LOOP 13 | Fund Cat: | 1 |
Limits To: | 1.143 MI E OF IH 410(ROSILLO CREEK) | Estimate: | $1,458,626 |
Length: | 2.2 Miles | Actual: | $1,062,205 |
Back... |
Totals for 1437-01-035 | ||
Length: | 2.2 Miles | ||
Estimate: | $1,458,626 | ||
Actual: | $1,062,205 | ||
CCSJ: 1502-03-001 | |||
District: | San Antonio | Let Date: | DEC 2009 |
Highway: | PA 1502 | Let Status: | Actual |
Project ID: | STP 2010(456)HES | CSJ: | 1502-03-001 |
Description: | INSTALL MEDIAN BARRIER | Handling Code: |
|
Limits From: | WETMORE ROAD | Fund Cat: | 8 |
Limits To: | WEIDNER ROAD | Estimate: | $708,200 |
Length: | 4.3 Miles | Actual: | $287,373 |
Back... |
Totals for 1502-03-001 | ||
Length: | 4.3 Miles | ||
Estimate: | $708,200 | ||
Actual: | $287,373 | ||
CCSJ: 2452-03-103 | |||
District: | San Antonio | Let Date: | JAN 2010 |
Highway: | LP 1604 | Let Status: | Actual |
Project ID: | STP 2009(655)ES | CSJ: | 2452-03-103 |
Description: | EXPAND FROM 2 LANES TO 4 LANE DIVIDED | Handling Code: |
|
Limits From: | FM 78 | Fund Cat: | 7 |
Limits To: | GRAYTOWN ROAD | Estimate: | $13,242,302 |
Length: | 3.1 Miles | Actual: | $6,631,043 |
Back... |
Totals for 2452-03-103 | ||
Length: | 3.1 Miles | ||
Estimate: | $13,242,302 | ||
Actual: | $6,631,043 | ||
CCSJ: 8000-15-012 | |||
District: | San Antonio | Let Date: | AUG 2010 |
Highway: | PS | Let Status: | Actual |
Project ID: | C 8000-15-12 | CSJ: | 8000-15-012 |
Description: | CONSTRUCT 4 LANE DIVIDED ROADWAY_ON NEW LOCATION | Handling Code: |
|
Limits From: | WURZBACH PARKWAY ON NEW LOCATION | Fund Cat: | 2 |
Limits To: | FROM JONES-MALTSBERGER TO WETMORE | Estimate: | $28,010,285 |
Length: | 1.8 Miles | Actual: | $22,696,171 |
District: | San Antonio | Let Date: | AUG 2010 |
Highway: | PS | Let Status: | Actual |
Project ID: | RW 8000-15-16 | CSJ: | 8000-15-016 |
Description: | RIGHT OF WAY UTILITY ADJUSTMENTS | Handling Code: |
|
Limits From: | WURZBACH PARKWAY ON NEW LOCATION | Fund Cat: | 2 |
Limits To: | FROM JONES-MALTSBERGER TO WETMORE | Estimate: | |
Length: | 1.8 Miles | Actual: | $1,322,268 |
Bid Tabulations Back... |
Totals for 8000-15-012 | ||
Length: | 3.6 Miles | ||
Estimate: | $28,010,285 | ||
Actual: | $24,018,439 |
|
|