Detail Letting Schedule for Dallas County (FY 2010)
| Detail Letting Schedule for Dallas County (FY 2010) | ||||
| Last Update: Tuesday, November 2, 2010 | 
| Dallas County (FY 2010) | 
CCSJ: 0008-08-068  | |||
| District: | Dallas | Let Date: | OCT 2009 | 
| Highway: | SH 180 | Let Status: | Actual | 
| Project ID: | STP 2010(201) | CSJ: | 0008-08-068 | 
| Description: | REPLACE DAMAGED SAFETY BARRIER AND REPLACE HEADWALL | Handling Code:  | 
|
| Limits From: | W. DAVIS AT COOMBS CREEK | Fund Cat: | 1 | 
| Limits To: | . | Estimate: | $30,515 | 
| Length: | 0.0 Miles | Actual: | $24,996 | 
| 
Back... | 
Totals for 0008-08-068 | ||
|---|---|---|---|
| Length: | 0.0 Miles | ||
| Estimate: | $30,515 | ||
| Actual: | $24,996 | ||
CCSJ: 0009-11-219  | |||
| District: | Dallas | Let Date: | MAY 2010 | 
| Highway: | IH 30 | Let Status: | Actual | 
| Project ID: | IM 0305(079) | CSJ: | 0009-11-219 | 
| Description: | UPGRADE TRAFFIC SIGNAL HARDWARE AT 2 INTERSECTIONS ON IH 30 | Handling Code:  | 
|
| Limits From: | AT THE INTERSECTIONS OF | Fund Cat: | 1 | 
| Limits To: | PEAK AND FERGUSON | Estimate: | $408,278 | 
| Length: | 0.0 Miles | Actual: | $330,486 | 
| District: | Dallas | Let Date: | MAY 2010 | 
| Highway: | US 175 | Let Status: | Actual | 
| Project ID: | NH 2010(035) | CSJ: | 0092-01-055 | 
| Description: | UPGRADE TRAFFIC SIGNAL HARDWARE AT 2 INTERSECTIONS ON US 175 | Handling Code:  | 
|
| Limits From: | AT THE INTERSETION OF | Fund Cat: | 1 | 
| Limits To: | M L KING JR BLVD AND HATCHER ST | Estimate: | $350,823 | 
| Length: | 0.0 Miles | Actual: | $295,041 | 
| District: | Dallas | Let Date: | MAY 2010 | 
| Highway: | IH 45 | Let Status: | Actual | 
| Project ID: | IM 0305(079) | CSJ: | 0092-14-077 | 
| Description: | UPGRADE TRAFFIC SIGNAL HARDWARE | Handling Code:  | 
|
| Limits From: | AT INTERSECTION OF LAMAR ST | Fund Cat: | 1 | 
| Limits To: | IN CITY OF DALLAS | Estimate: | $252,775 | 
| Length: | 0.0 Miles | Actual: | $202,473 | 
| 
Back... | 
Totals for 0009-11-219 | ||
| Length: | 0.0 Miles | ||
| Estimate: | $1,011,876 | ||
| Actual: | $828,000 | ||
CCSJ: 0009-11-220  | |||
| District: | Dallas | Let Date: | AUG 2010 | 
| Highway: | IH 30 | Let Status: | Actual | 
| Project ID: | C 9-11-220 | CSJ: | 0009-11-220 | 
| Description: | CONSTRUCT PERMANENT CONTRAFLOW HOV LANES | Handling Code:  | 
|
| Limits From: | WEST OF GOOD-LATIMER EXPWY | Fund Cat: | 1 | 
| Limits To: | EAST OF HASKELL AVE | Estimate: | $1,842,860 | 
| Length: | 1.4 Miles | Actual: | $2,384,031 | 
| District: | Dallas | Let Date: | AUG 2010 | 
| Highway: | IH 30 | Let Status: | Actual | 
| Project ID: | CC 9-11-221 | CSJ: | 0009-11-221 | 
| Description: | REPLACE FOUR DYNAMIC MESSAGE SIGNS FOR CONTRAFLOW HOV LANE | Handling Code:  | 
|
| Limits From: | ERVAY ST. | Fund Cat: | 10 | 
| Limits To: | FERGUSON RD IN DALLAS | Estimate: | $157,122 | 
| Length: | 4.5 Miles | Actual: | $175,037 | 
| 
Project Addenda Bid Tabulations Back...  | 
Totals for 0009-11-220 | ||
| Length: | 5.9 Miles | ||
| Estimate: | $1,999,982 | ||
| Actual: | $2,559,068 | ||
CCSJ: 0047-07-213  | |||
| District: | Dallas | Let Date: | OCT 2009 | 
| Highway: | US 75 | Let Status: | Actual | 
| Project ID: | STP 2010(202)MM | CSJ: | 0047-07-213 | 
| Description: | INTERSECTION IMPROVEMENTS - DUAL RIGHTS NB TO EB_AND | Handling Code:  | 
|
| Limits From: | AT INTERSECTION OF FOREST LANE | Fund Cat: | 7 | 
| Limits To: | IN CITY OF DALLAS | Estimate: | $166,638 | 
| Length: | 0.1 Miles | Actual: | $112,294 | 
| 
Back... | 
Totals for 0047-07-213 | ||
| Length: | 0.1 Miles | ||
| Estimate: | $166,638 | ||
| Actual: | $112,294 | ||
CCSJ: 0047-07-217  | |||
| District: | Dallas | Let Date: | JUL 2010 | 
| Highway: | US 75 | Let Status: | Actual | 
| Project ID: | NH 2010(978) | CSJ: | 0047-07-217 | 
| Description: | LANDSCAPE DEVELOPMENT INCLUDING SOIL AMENDMENTS | Handling Code:  | 
|
| Limits From: | SPUR 366 / WOODALL RODGERS | Fund Cat: | 10 | 
| Limits To: | COTTONWOOD CREEK | Estimate: | $964,224 | 
| Length: | 10.0 Miles | Actual: | $821,488 | 
| 
Back... | 
Totals for 0047-07-217 | ||
| Length: | 10.0 Miles | ||
| Estimate: | $964,224 | ||
| Actual: | $821,488 | ||
CCSJ: 0092-02-116  | |||
| District: | Dallas | Let Date: | AUG 2010 | 
| Highway: | IH 45 | Let Status: | Actual | 
| Project ID: | HP 2011(147) | CSJ: | 0092-02-116 | 
| Description: | UPGRADE INTERCHANGE FOR EXPANDED MULTIMODAL TRAFFIC | Handling Code:  | 
|
| Limits From: | AT FULGHUM RD INTERCHANGE | Fund Cat: | 10 | 
| Limits To: | . | Estimate: | $3,701,730 | 
| Length: | 1.8 Miles | Actual: | $3,832,239 | 
| 
Bid Tabulations Back...  | 
Totals for 0092-02-116 | ||
| Length: | 1.8 Miles | ||
| Estimate: | $3,701,730 | ||
| Actual: | $3,832,239 | ||
CCSJ: 0094-03-105  | |||
| District: | Dallas | Let Date: | AUG 2010 | 
| Highway: | SH 183 | Let Status: | Actual | 
| Project ID: | C 94-3-103 | CSJ: | 0094-03-103 | 
| Description: | CONSTRUCT SOUND WALLS | Handling Code:  | 
|
| Limits From: | WEST OF STORY RD | Fund Cat: | 10 | 
| Limits To: | WINGREN ROAD | Estimate: | $3,551,625 | 
| Length: | 0.0 Miles | Actual: | $2,153,469 | 
| District: | Dallas | Let Date: | AUG 2010 | 
| Highway: | SH 183 | Let Status: | Actual | 
| Project ID: | C 94-3-105 | CSJ: | 0094-03-105 | 
| Description: | CONSTRUCT EASTBOUND FRONTAGE ROAD | Handling Code:  | 
|
| Limits From: | WEST OF STORY RD | Fund Cat: | 10 | 
| Limits To: | WILLIAM BREWSTER ST | Estimate: | $6,614,710 | 
| Length: | 1.2 Miles | Actual: | $4,957,688 | 
| 
Bid Tabulations Back...  | 
Totals for 0094-03-105 | ||
| Length: | 1.2 Miles | ||
| Estimate: | $10,166,335 | ||
| Actual: | $7,111,157 | ||
CCSJ: 0095-13-029  | |||
| District: | Dallas | Let Date: | JUL 2010 | 
| Highway: | IH 20 | Let Status: | Actual | 
| Project ID: | C 95-13-29 | CSJ: | 0095-13-029 | 
| Description: | FULL DEPTH PAVEMENT REPAIR | Handling Code:  | 
|
| Limits From: | IH 635 | Fund Cat: | 1 | 
| Limits To: | KAUFMAN COUNTY LINE; EASTBOUND | Estimate: | $1,703,700 | 
| Length: | 6.3 Miles | Actual: | $1,250,269 | 
| 
Back... | 
Totals for 0095-13-029 | ||
| Length: | 6.3 Miles | ||
| Estimate: | $1,703,700 | ||
| Actual: | $1,250,269 | ||
CCSJ: 0196-07-021  | |||
| District: | Dallas | Let Date: | SEP 2009 | 
| Highway: | SP 366 | Let Status: | Actual | 
| Project ID: | STP 2010(036)MM | CSJ: | 0196-07-021 | 
| Description: | INTERSECTION IMPROVEMENTS | Handling Code:  | 
|
| Limits From: | SPUR 366 (WOODALL RODGERS FRWY) | Fund Cat: | 7 | 
| Limits To: | AT PEARL ST AND OLIVE ST | Estimate: | $747,770 | 
| Length: | 0.3 Miles | Actual: | $593,554 | 
| District: | Dallas | Let Date: | SEP 2009 | 
| Highway: | SP 366 | Let Status: | Actual | 
| Project ID: | STP 2008(919)MM | CSJ: | 0196-07-028 | 
| Description: | ROW ACQUISITION & UTILITIES | Handling Code:  | 
NC | 
| Limits From: | SPUR 366 (WOODALL RODGERS FRWY) | Fund Cat: | 7 | 
| Limits To: | AT PEARL ST AND OLIVE ST | Estimate: | |
| Length: | 0.0 Miles | Actual: | $25,092 | 
| 
Back... | 
Totals for 0196-07-021 | ||
| Length: | 0.3 Miles | ||
| Estimate: | $747,770 | ||
| Actual: | $618,646 | ||
CCSJ: 0261-02-065  | |||
| District: | Dallas | Let Date: | SEP 2009 | 
| Highway: | US 67 | Let Status: | Actual | 
| Project ID: | C 261-2-65 | CSJ: | 0261-02-065 | 
| Description: | PROVIDE AUXILIARY LANE NB AND SB | Handling Code:  | 
|
| Limits From: | COCKRELL HILL RD | Fund Cat: | 10 | 
| Limits To: | WHEATLAND RD | Estimate: | $1,965,142 | 
| Length: | 0.6 Miles | Actual: | $1,942,330 | 
| District: | Dallas | Let Date: | SEP 2009 | 
| Highway: | US 67 | Let Status: | Actual | 
| Project ID: | C 261-3-54 | CSJ: | 0261-03-054 | 
| Description: | PROVIDING AUXILIARY LANES IN BOTH DIRECTIONS | Handling Code:  | 
|
| Limits From: | WHEATLAND RD | Fund Cat: | 10 | 
| Limits To: | 2600 FT NORTH OF WHEATLAND RD | Estimate: | $1,934,550 | 
| Length: | 0.5 Miles | Actual: | $1,952,408 | 
| 
Back... | 
Totals for 0261-02-065 | ||
| Length: | 1.1 Miles | ||
| Estimate: | $3,899,692 | ||
| Actual: | $3,894,738 | ||
CCSJ: 0261-03-053  | |||
| District: | Dallas | Let Date: | AUG 2010 | 
| Highway: | US 67 | Let Status: | Actual | 
| Project ID: | NH 2011(346) | CSJ: | 0261-03-053 | 
| Description: | CONSTRUCT NB AUXILIARY LANE, WIDEN NBML BRIDGE, CHANNEL WORK | Handling Code:  | 
|
| Limits From: | NORTH OF IH 20 | Fund Cat: | 1 | 
| Limits To: | SOUTH OF RED BIRD LN | Estimate: | $3,482,183 | 
| Length: | 1.0 Miles | Actual: | $3,685,288 | 
| 
Bid Tabulations Back...  | 
Totals for 0261-03-053 | ||
| Length: | 1.0 Miles | ||
| Estimate: | $3,482,183 | ||
| Actual: | $3,685,288 | ||
CCSJ: 0261-03-059  | |||
| District: | Dallas | Let Date: | MAY 2010 | 
| Highway: | US 67 | Let Status: | Actual | 
| Project ID: | NH 2010(848) | CSJ: | 0261-03-059 | 
| Description: | UPGRADE TRAFFIC SINGAL HARDWARE AT 2 INTERSECTIONS ON US 67 | Handling Code:  | 
|
| Limits From: | AT THE INTERSECTIONS OF | Fund Cat: | 1 | 
| Limits To: | KIEST AND POLK | Estimate: | $361,018 | 
| Length: | 0.0 Miles | Actual: | $288,432 | 
| District: | Dallas | Let Date: | MAY 2010 | 
| Highway: | LP 12 | Let Status: | Actual | 
| Project ID: | NH 2010(848) | CSJ: | 0581-02-131 | 
| Description: | UPGRADE TRAFFIC SIGNAL HARDWARE | Handling Code:  | 
|
| Limits From: | AT THE INTERSECTION OF DAVIS ST | Fund Cat: | 1 | 
| Limits To: | IN CITY OF DALLAS | Estimate: | $178,436 | 
| Length: | 0.0 Miles | Actual: | $159,908 | 
| District: | Dallas | Let Date: | MAY 2010 | 
| Highway: | IH 635 | Let Status: | Actual | 
| Project ID: | IM 6356(420) | CSJ: | 2374-01-160 | 
| Description: | UPGRADE TRAFFIC SIGNAL HARDWARE | Handling Code:  | 
|
| Limits From: | AT THE INTERSECTION OF PLANO RD | Fund Cat: | 1 | 
| Limits To: | IN CITY OF DALLAS | Estimate: | $163,023 | 
| Length: | 0.0 Miles | Actual: | $153,227 | 
| District: | Dallas | Let Date: | MAY 2010 | 
| Highway: | IH 20 | Let Status: | Actual | 
| Project ID: | IM 6356(420) | CSJ: | 2374-04-067 | 
| Description: | UPGRADE TRAFFIC SIGNAL HARDWARE | Handling Code:  | 
|
| Limits From: | AT THE INTERSECTION | Fund Cat: | 1 | 
| Limits To: | OF COCKRELL HILL RD | Estimate: | $179,504 | 
| Length: | 0.0 Miles | Actual: | $171,433 | 
| 
Back... | 
Totals for 0261-03-059 | ||
| Length: | 0.0 Miles | ||
| Estimate: | $881,981 | ||
| Actual: | $773,000 | ||
CCSJ: 0261-03-060  | |||
| District: | Dallas | Let Date: | JUL 2010 | 
| Highway: | US 67 | Let Status: | Actual | 
| Project ID: | NH 2010(980) | CSJ: | 0261-03-060 | 
| Description: | LANDSCAPE DEVELOPMENT TO INCLUDE TREE PLANTING | Handling Code:  | 
|
| Limits From: | 0.1 MILE SOUTH OF POLK ST | Fund Cat: | 10 | 
| Limits To: | IH 35E | Estimate: | $129,779 | 
| Length: | 1.1 Miles | Actual: | $126,344 | 
| 
Back... | 
Totals for 0261-03-060 | ||
| Length: | 1.1 Miles | ||
| Estimate: | $129,779 | ||
| Actual: | $126,344 | ||
CCSJ: 0353-04-088  | |||
| District: | Dallas | Let Date: | APR 2010 | 
| Highway: | SP 348 | Let Status: | Actual | 
| Project ID: | C 353-4-88 | CSJ: | 0353-04-088 | 
| Description: | PROVIDE CONSTRUCTION OF GRADE SEPARATION | Handling Code:  | 
|
| Limits From: | AT LAS COLINAS BLVD IN IRVING | Fund Cat: | 10 | 
| Limits To: | . | Estimate: | $10,874,422 | 
| Length: | 0.7 Miles | Actual: | $7,469,412 | 
| District: | Dallas | Let Date: | APR 2010 | 
| Highway: | SP 348 | Let Status: | Actual | 
| Project ID: | RW 353-4-92 | CSJ: | 0353-04-092 | 
| Description: | RIGHT OF WAY ACQUISTION AND UTILITY ADJUSTMENT | Handling Code:  | 
|
| Limits From: | AT LAS COLINAS BLVD IN IRVING | Fund Cat: | 10 | 
| Limits To: | . | Estimate: | |
| Length: | 0.7 Miles | Actual: | $414,335 | 
| 
Back... | 
Totals for 0353-04-088 | ||
| Length: | 1.4 Miles | ||
| Estimate: | $10,874,422 | ||
| Actual: | $7,883,747 | ||
CCSJ: 0918-00-152  | |||
| District: | Dallas | Let Date: | APR 2010 | 
| Highway: | VA | Let Status: | Actual | 
| Project ID: | STP 2010(840)MM | CSJ: | 0918-00-152 | 
| Description: | NCTCOG - - REGIONAL BICYCLE AND PEDESTRIAN / | Handling Code:  | 
XX | 
| Limits From: | NCTCOG STUDY AREA | Fund Cat: | 7 | 
| Limits To: | . | Estimate: | $1,040,000 | 
| Length: | 0.0 Miles | Actual: | $1,040,000 | 
| 
Back... | 
Totals for 0918-00-152 | ||
| Length: | 0.0 Miles | ||
| Estimate: | $1,040,000 | ||
| Actual: | $1,040,000 | ||
CCSJ: 0918-00-154  | |||
| District: | Dallas | Let Date: | MAY 2010 | 
| Highway: | VA | Let Status: | Actual | 
| Project ID: | STP 2010(138) | CSJ: | 0918-00-154 | 
| Description: | INSTALL UNINTERRUPTED POWER SUPPLY AT SIGNALIZED | Handling Code:  | 
|
| Limits From: | VARIOUS LOCATIONS IN DALLAS, DENTON | Fund Cat: | 1 | 
| Limits To: | AND ROCKWALL COUNTIES | Estimate: | $762,324 | 
| Length: | 0.0 Miles | Actual: | $549,207 | 
| 
Back... | 
Totals for 0918-00-154 | ||
| Length: | 0.0 Miles | ||
| Estimate: | $762,324 | ||
| Actual: | $549,207 | ||
CCSJ: 0918-00-155  | |||
| District: | Dallas | Let Date: | OCT 2009 | 
| Highway: | VA | Let Status: | Actual | 
| Project ID: | STP 2010(196)MM | CSJ: | 0918-00-155 | 
| Description: | TRUCK LANE RESETRICTION SIGNING WITHIN MPA BOUNDARY | Handling Code:  | 
|
| Limits From: | TRUCK LANE RESTRICTIONS | Fund Cat: | 7 | 
| Limits To: | ON IH 20 AND IH 45 | Estimate: | $261,992 | 
| Length: | 0.0 Miles | Actual: | $225,700 | 
| 
Back... | 
Totals for 0918-00-155 | ||
| Length: | 0.0 Miles | ||
| Estimate: | $261,992 | ||
| Actual: | $225,700 | ||
CCSJ: 0918-00-156  | |||
| District: | Dallas | Let Date: | SEP 2009 | 
| Highway: | VA | Let Status: | Actual | 
| Project ID: | STP 2010(038) | CSJ: | 0918-00-156 | 
| Description: | ASBESTOS ABATEMENT ON BRIDGES IN ADVANCE OF OTHER | Handling Code:  | 
|
| Limits From: | DISTRICTWIDE | Fund Cat: | 1 | 
| Limits To: | (ON-SYSTEM) | Estimate: | $849,758 | 
| Length: | 0.0 Miles | Actual: | $690,175 | 
| 
Back... | 
Totals for 0918-00-156 | ||
| Length: | 0.0 Miles | ||
| Estimate: | $849,758 | ||
| Actual: | $690,175 | ||
CCSJ: 0918-00-157  | |||
| District: | Dallas | Let Date: | OCT 2009 | 
| Highway: | VA | Let Status: | Actual | 
| Project ID: | STP 2010(184) | CSJ: | 0918-00-157 | 
| Description: | NON - SITE SPECIFIC TRAFFIC SIGNAL INSTALLATION | Handling Code:  | 
|
| Limits From: | DISTRICTWIDE | Fund Cat: | 1 | 
| Limits To: | . | Estimate: | $1,430,500 | 
| Length: | 0.0 Miles | Actual: | $1,208,758 | 
| 
Back... | 
Totals for 0918-00-157 | ||
| Length: | 0.0 Miles | ||
| Estimate: | $1,430,500 | ||
| Actual: | $1,208,758 | ||
CCSJ: 0918-00-158  | |||
| District: | Dallas | Let Date: | MAR 2010 | 
| Highway: | VA | Let Status: | Actual | 
| Project ID: | STP 2010(620) | CSJ: | 0918-00-158 | 
| Description: | NON - SITE SPECIFIC SIGN REPLACEMENT AND REFURBISHING | Handling Code:  | 
|
| Limits From: | DISTRICTWIDE | Fund Cat: | 1 | 
| Limits To: | . | Estimate: | $919,389 | 
| Length: | 0.0 Miles | Actual: | $765,741 | 
| 
Back... | 
Totals for 0918-00-158 | ||
| Length: | 0.0 Miles | ||
| Estimate: | $919,389 | ||
| Actual: | $765,741 | ||
CCSJ: 0918-00-159  | |||
| District: | Dallas | Let Date: | AUG 2010 | 
| Highway: | VA | Let Status: | Actual | 
| Project ID: | STP 2011(448)MM | CSJ: | 0918-00-159 | 
| Description: | TRAVEL SURVEY AND DATA COLLECTION EFFORT FOR PROJECTS IN MPO | Handling Code:  | 
XX | 
| Limits From: | REGIONAL TRAVEL SURVEY | Fund Cat: | 7 | 
| Limits To: | (FY 2010) | Estimate: | $1,986,666 | 
| Length: | 0.0 Miles | Actual: | $1,986,666 | 
| 
Back... | 
Totals for 0918-00-159 | ||
| Length: | 0.0 Miles | ||
| Estimate: | $1,986,666 | ||
| Actual: | $1,986,666 | ||
CCSJ: 0918-00-167  | |||
| District: | Dallas | Let Date: | AUG 2010 | 
| Highway: | VA | Let Status: | Actual | 
| Project ID: | STP 2011(592)MM | CSJ: | 0918-00-167 | 
| Description: | PROVIDE ASSISTANCE TO STRANDED MOTORISTS OR NON INJURY | Handling Code:  | 
XX | 
| Limits From: | MOBILITY ASSISTANCE PATROL | Fund Cat: | 7 | 
| Limits To: | . | Estimate: | $3,370,000 | 
| Length: | 0.0 Miles | Actual: | $3,369,962 | 
| 
Back... | 
Totals for 0918-00-167 | ||
| Length: | 0.0 Miles | ||
| Estimate: | $3,370,000 | ||
| Actual: | $3,369,962 | ||
CCSJ: 0918-45-354  | |||
| District: | Dallas | Let Date: | MAY 2010 | 
| Highway: | VA | Let Status: | Actual | 
| Project ID: | STP 97(253)ESTE | CSJ: | 0918-45-354 | 
| Description: | SANTA FE TRESTLE HIKE AND BIKE TRAIL | Handling Code:  | 
LC | 
| Limits From: | EXISTING TRAILHEAD AT MOORE PARK | Fund Cat: | 9 | 
| Limits To: | N. TRINITY RIVER LEVEE, DOWNTOWN | Estimate: | $6,107,200 | 
| Length: | 0.9 Miles | Actual: | $5,575,149 | 
| 
Back... | 
Totals for 0918-45-354 | ||
| Length: | 0.9 Miles | ||
| Estimate: | $6,107,200 | ||
| Actual: | $5,575,149 | ||
CCSJ: 0918-45-366  | |||
| District: | Dallas | Let Date: | SEP 2009 | 
| Highway: | CS | Let Status: | Actual | 
| Project ID: | STP 97(431)MM | CSJ: | 0918-45-366 | 
| Description: | WIDEN 2 - LANE FACILITY TO 4 - LANE DIVIDED FACILITY | Handling Code:  | 
|
| Limits From: | ON MEDICAL DIST DR,HARRY HINES BLVD | Fund Cat: | 7 | 
| Limits To: | MAPLE AVENUE | Estimate: | $3,453,274 | 
| Length: | 0.5 Miles | Actual: | $2,601,474 | 
| District: | Dallas | Let Date: | SEP 2009 | 
| Highway: | CS | Let Status: | Actual | 
| Project ID: | STP 2008(854)MM | CSJ: | 0918-45-814 | 
| Description: | ACQUISITION, RELOCATION & UTILITIES | Handling Code:  | 
NC | 
| Limits From: | ON MEDICAL DIST DR HARRY HINES BLVD | Fund Cat: | 7 | 
| Limits To: | MAPLE AVENUE | Estimate: | |
| Length: | 0.0 Miles | Actual: | $666,538 | 
| 
Back... | 
Totals for 0918-45-366 | ||
| Length: | 0.5 Miles | ||
| Estimate: | $3,453,274 | ||
| Actual: | $3,268,012 | ||
CCSJ: 0918-45-368  | |||
| District: | Dallas | Let Date: | APR 2010 | 
| Highway: | CS | Let Status: | Actual | 
| Project ID: | STP 97(433)MM | CSJ: | 0918-45-368 | 
| Description: | WIDEN 4 - LANE FACILITY TO 5 - LANE FACILITY | Handling Code:  | 
|
| Limits From: | ON MONTFORT DRIVE, PETERSON LANE | Fund Cat: | 7 | 
| Limits To: | ALPHA ROAD | Estimate: | $547,192 | 
| Length: | 0.2 Miles | Actual: | $563,823 | 
| District: | Dallas | Let Date: | APR 2010 | 
| Highway: | CS | Let Status: | Actual | 
| Project ID: | STP 2001(674)MM | CSJ: | 0918-45-577 | 
| Description: | RIGHT OF WAY ACQUISITION, RELOCATION ASSISTANCE AND UTILITY | Handling Code:  | 
|
| Limits From: | ON MONTFORT DRIVE, PETERSON LANE | Fund Cat: | 7 | 
| Limits To: | ALPHA ROAD | Estimate: | |
| Length: | 0.0 Miles | Actual: | $173,390 | 
| 
Back... | 
Totals for 0918-45-368 | ||
| Length: | 0.2 Miles | ||
| Estimate: | $547,192 | ||
| Actual: | $737,213 | ||
CCSJ: 0918-45-533  | |||
| District: | Dallas | Let Date: | NOV 2009 | 
| Highway: | VA | Let Status: | Actual | 
| Project ID: | STP 2000(555)ESTE | CSJ: | 0918-45-533 | 
| Description: | SCENIC BEAUTIFICATION PROJECT TO PROVIDE STREET FURNITURE | Handling Code:  | 
LC | 
| Limits From: | CITY OF LANCASTER HISTORIC DISTRICT | Fund Cat: | 9 | 
| Limits To: | . | Estimate: | $535,287 | 
| Length: | 0.0 Miles | Actual: | $635,540 | 
| 
Back... | 
Totals for 0918-45-533 | ||
| Length: | 0.0 Miles | ||
| Estimate: | $535,287 | ||
| Actual: | $635,540 | ||
CCSJ: 0918-45-541  | |||
| District: | Dallas | Let Date: | JUL 2010 | 
| Highway: | CS | Let Status: | Actual | 
| Project ID: | CM 2001(272) | CSJ: | 0918-45-541 | 
| Description: | ONE OFF SYSTEM INTERSECTION IMPROVEMENT | Handling Code:  | 
|
| Limits From: | ON MIDWAY RD AT TRINITY MILLS RD | Fund Cat: | 5 | 
| Limits To: | . | Estimate: | $846,697 | 
| Length: | 0.2 Miles | Actual: | $866,143 | 
| 
Back... | 
Totals for 0918-45-541 | ||
| Length: | 0.2 Miles | ||
| Estimate: | $846,697 | ||
| Actual: | $866,143 | ||
CCSJ: 0918-45-587  | |||
| District: | Dallas | Let Date: | FEB 2010 | 
| Highway: | VA | Let Status: | Actual | 
| Project ID: | CM 2001(795) | CSJ: | 0918-45-587 | 
| Description: | CONSTRUCT TRAIL EXTENSION TO EXISTING KATY TRAIL WITH | Handling Code:  | 
LC | 
| Limits From: | ON KATY TRAIL FROM MCCOMMAS BLVD | Fund Cat: | 5 | 
| Limits To: | SKILLMAN ST AND SANDHURST LN | Estimate: | $1,861,995 | 
| Length: | 1.1 Miles | Actual: | $809,298 | 
| 
Back... | 
Totals for 0918-45-587 | ||
| Length: | 1.1 Miles | ||
| Estimate: | $1,861,995 | ||
| Actual: | $809,298 | ||
CCSJ: 0918-45-640  | |||
| District: | Dallas | Let Date: | FEB 2010 | 
| Highway: | VA | Let Status: | Actual | 
| Project ID: | STP 2002(126)ESTE | CSJ: | 0918-45-640 | 
| Description: | CONSTRUCT PEDESTRIAN BRIDGE OVER IH635 (LBJ) TO DART STATION | Handling Code:  | 
|
| Limits From: | DART LINE FROM AUDELIA RD NORTHEAST | Fund Cat: | 9 | 
| Limits To: | 626 FT BRIDGE TO SKILLMAN DART STAT | Estimate: | $2,227,449 | 
| Length: | 0.3 Miles | Actual: | $1,549,413 | 
| 
Back... | 
Totals for 0918-45-640 | ||
| Length: | 0.3 Miles | ||
| Estimate: | $2,227,449 | ||
| Actual: | $1,549,413 | ||
CCSJ: 0918-45-642  | |||
| District: | Dallas | Let Date: | MAY 2010 | 
| Highway: | VA | Let Status: | Actual | 
| Project ID: | STP 2002(128)ESTE | CSJ: | 0918-45-642 | 
| Description: | PEDESTRIAN / BICYCLE LINK BETWEEN 2 TRAILS | Handling Code:  | 
LC | 
| Limits From: | E SIDE OF COIT RD @ HAYMEADOW, S | Fund Cat: | 9 | 
| Limits To: | SPRING VALLEY, E ON N SIDE TO MAHAM | Estimate: | $585,422 | 
| Length: | 0.8 Miles | Actual: | $429,037 | 
| 
Back... | 
Totals for 0918-45-642 | ||
| Length: | 0.8 Miles | ||
| Estimate: | $585,422 | ||
| Actual: | $429,037 | ||
CCSJ: 0918-45-758  | |||
| District: | Dallas | Let Date: | DEC 2009 | 
| Highway: | CS | Let Status: | Actual | 
| Project ID: | BR 2007(302) | CSJ: | 0918-45-758 | 
| Description: | REPLACE BRIDGE AND APPROACHES | Handling Code:  | 
|
| Limits From: | PARK LANE AT BACHMAN BRANCH | Fund Cat: | 6 | 
| Limits To: | IN CITY OF DALLAS | Estimate: | $795,645 | 
| Length: | 0.1 Miles | Actual: | $739,138 | 
| District: | Dallas | Let Date: | DEC 2009 | 
| Highway: | CS | Let Status: | Actual | 
| Project ID: | RW 918-45-879 | CSJ: | 0918-45-879 | 
| Description: | RIGHT OF WAY UTILITY ADJUSTMENTS | Handling Code:  | 
NC | 
| Limits From: | PARK LANE AT BACHMAN CREEK | Fund Cat: | 6 | 
| Limits To: | . | Estimate: | |
| Length: | 0.1 Miles | Actual: | $156,201 | 
| 
Back... | 
Totals for 0918-45-758 | ||
| Length: | 0.2 Miles | ||
| Estimate: | $795,645 | ||
| Actual: | $895,339 | ||
CCSJ: 0918-45-760  | |||
| District: | Dallas | Let Date: | AUG 2010 | 
| Highway: | CS | Let Status: | Actual | 
| Project ID: | BR 2007(305) | CSJ: | 0918-45-760 | 
| Description: | REPLACE BRIDGE AND APPROACHES | Handling Code:  | 
|
| Limits From: | WEST LAWTHER DRIVE | Fund Cat: | 6 | 
| Limits To: | WHITE ROCK CREEK | Estimate: | $616,396 | 
| Length: | 0.1 Miles | Actual: | $681,031 | 
| 
Bid Tabulations Back...  | 
Totals for 0918-45-760 | ||
| Length: | 0.1 Miles | ||
| Estimate: | $616,396 | ||
| Actual: | $681,031 | ||
CCSJ: 0918-45-763  | |||
| District: | Dallas | Let Date: | FEB 2010 | 
| Highway: | VA | Let Status: | Actual | 
| Project ID: | STP 2007(832)MM | CSJ: | 0918-45-763 | 
| Description: | INTERSECTION IMPROVEMENTS | Handling Code:  | 
|
| Limits From: | ON GALLOWAY AVE AT US 80 | Fund Cat: | 7 | 
| Limits To: | . | Estimate: | $279,517 | 
| Length: | 0.2 Miles | Actual: | $268,100 | 
| 
Back... | 
Totals for 0918-45-763 | ||
| Length: | 0.2 Miles | ||
| Estimate: | $279,517 | ||
| Actual: | $268,100 | ||
CCSJ: 0918-45-772  | |||
| District: | Dallas | Let Date: | FEB 2010 | 
| Highway: | VA | Let Status: | Actual | 
| Project ID: | CM 2010(671) | CSJ: | 0918-45-772 | 
| Description: | ITS ARCHITECTURE DEVELOPMENT | Handling Code:  | 
XX | 
| Limits From: | DALLAS AREA INTER-CITY COMMUNICAT'N | Fund Cat: | 5 | 
| Limits To: | EXCHANGE - PHASE II | Estimate: | $85,000 | 
| Length: | 0.0 Miles | Actual: | $85,000 | 
| 
Back... | 
Totals for 0918-45-772 | ||
| Length: | 0.0 Miles | ||
| Estimate: | $85,000 | ||
| Actual: | $85,000 | ||
CCSJ: 0918-45-774  | |||
| District: | Dallas | Let Date: | DEC 2009 | 
| Highway: | VA | Let Status: | Actual | 
| Project ID: | HP 2006(867) | CSJ: | 0918-45-774 | 
| Description: | PEDESTRIAN / BICYCLE LINK FOR TRAIL ALONG COTTONWOOD CREEK | Handling Code:  | 
LC | 
| Limits From: | HAMILTON PARK | Fund Cat: | 10 | 
| Limits To: | WHITE ROCK CREEK TRAIL IN DALLAS | Estimate: | $2,453,995 | 
| Length: | 0.0 Miles | Actual: | $1,125,715 | 
| District: | Dallas | Let Date: | DEC 2009 | 
| Highway: | VA | Let Status: | Actual | 
| Project ID: | HP 2009(053) | CSJ: | 0918-45-852 | 
| Description: | PEDESTRAIAN / BICYCLE LINK FOR TRAIL ALONG COTTONWOOD CREEK_ - | Handling Code:  | 
FC | 
| Limits From: | HAMILTON PARK | Fund Cat: | 10 | 
| Limits To: | WHITE ROCK CREEK TRAIL IN DALLAS | Estimate: | $1,251,844 | 
| Length: | 0.0 Miles | Actual: | $1,251,844 | 
| 
Back... | 
Totals for 0918-45-774 | ||
| Length: | 0.0 Miles | ||
| Estimate: | $3,705,839 | ||
| Actual: | $2,377,559 | ||
CCSJ: 0918-45-799  | |||
| District: | Dallas | Let Date: | MAR 2010 | 
| Highway: | VA | Let Status: | Actual | 
| Project ID: | STP 2010(583)MM | CSJ: | 0918-45-799 | 
| Description: | CBD SIGNAGE & WAYFINDING | Handling Code:  | 
LC | 
| Limits From: | DALLAS-VARIOUS LOCATIONS | Fund Cat: | 7 | 
| Limits To: | PHASE II, ON-SYSTEM | Estimate: | $41,000 | 
| Length: | 0.0 Miles | Actual: | $55,787 | 
| District: | Dallas | Let Date: | MAR 2010 | 
| Highway: | VA | Let Status: | Actual | 
| Project ID: | STP 2010(584)MM | CSJ: | 0918-45-800 | 
| Description: | CBD SIGNAGE & WAYFINDING | Handling Code:  | 
LC | 
| Limits From: | DALLAS-VARIOUS LOCATIONS | Fund Cat: | 7 | 
| Limits To: | PHASE II, OFF-SYSTEM | Estimate: | $690,375 | 
| Length: | 0.0 Miles | Actual: | $520,104 | 
| 
Back... | 
Totals for 0918-45-799 | ||
| Length: | 0.0 Miles | ||
| Estimate: | $731,375 | ||
| Actual: | $575,891 | ||
CCSJ: 0918-45-849  | |||
| District: | Dallas | Let Date: | FEB 2010 | 
| Highway: | CS | Let Status: | Actual | 
| Project ID: | STP 2010(692)MM | CSJ: | 0918-45-849 | 
| Description: | INSTALL ITS / TRAIN DETECTION | Handling Code:  | 
XX | 
| Limits From: | KINGLSEY RD, LEON RD, & SHILOH ROAD | Fund Cat: | 7 | 
| Limits To: | AT KCS RR, IN GARLAND | Estimate: | $145,000 | 
| Length: | 0.0 Miles | Actual: | $145,000 | 
| 
Back... | 
Totals for 0918-45-849 | ||
| Length: | 0.0 Miles | ||
| Estimate: | $145,000 | ||
| Actual: | $145,000 | ||
CCSJ: 0918-45-857  | |||
| District: | Dallas | Let Date: | AUG 2010 | 
| Highway: | VA | Let Status: | Actual | 
| Project ID: | STP 2011(284)MM | CSJ: | 0918-45-857 | 
| Description: | UPGRADE TRINITY RAILWAY EXPRESS (TRE) CROSSINGS; INSTALL | Handling Code:  | 
TR | 
| Limits From: | TRE GRADE CROSSINGS AT IRVING YARD | Fund Cat: | 7 | 
| Limits To: | WAY AND VALLEY VIEW LANE | Estimate: | $714,000 | 
| Length: | 0.0 Miles | Actual: | $714,000 | 
| 
Back... | 
Totals for 0918-45-857 | ||
| Length: | 0.0 Miles | ||
| Estimate: | $714,000 | ||
| Actual: | $714,000 | ||
CCSJ: 0918-45-859  | |||
| District: | Dallas | Let Date: | MAY 2010 | 
| Highway: | VA | Let Status: | Actual | 
| Project ID: | CM 2009(754) | CSJ: | 0918-45-859 | 
| Description: | NORTHWEST CORRIDOR SEGMENT FROM BACHMAN STATION IN DALLAS | Handling Code:  | 
TR | 
| Limits From: | NORTHWEST LIGHT RAIL CORRIDOR | Fund Cat: | 5 | 
| Limits To: | IN CITIES OF DALLAS AND IRVING | Estimate: | $18,468,138 | 
| Length: | 0.0 Miles | Actual: | $18,468,139 | 
| 
Back... | 
Totals for 0918-45-859 | ||
| Length: | 0.0 Miles | ||
| Estimate: | $18,468,138 | ||
| Actual: | $18,468,139 | ||
CCSJ: 0918-45-860  | |||
| District: | Dallas | Let Date: | APR 2010 | 
| Highway: | VA | Let Status: | Actual | 
| Project ID: | CM 2010(697) | CSJ: | 0918-45-860 | 
| Description: | DART - TRE TRAIN SET - PHASE 2; PURCHASE 1 ADDITIONAL | Handling Code:  | 
TR | 
| Limits From: | TRINITY RAILWAY EXPRESS (TRE) | Fund Cat: | 5 | 
| Limits To: | IN DALLAS AND TARRANTY COUNTIES | Estimate: | $5,200,000 | 
| Length: | 0.0 Miles | Actual: | $5,200,000 | 
| 
Back... | 
Totals for 0918-45-860 | ||
| Length: | 0.0 Miles | ||
| Estimate: | $5,200,000 | ||
| Actual: | $5,200,000 | ||
CCSJ: 0918-45-861  | |||
| District: | Dallas | Let Date: | JUL 2010 | 
| Highway: | VA | Let Status: | Actual | 
| Project ID: | STP 94(187)TE | CSJ: | 0918-45-861 | 
| Description: | MCKINNEY TROLLEY PHASE 2 - CONSTRUCT EXTENTION OF TROLLEY | Handling Code:  | 
LC | 
| Limits From: | VARIOUS LOCATIONS DOWNTOWN DALLAS | Fund Cat: | 9 | 
| Limits To: | . | Estimate: | $6,792,173 | 
| Length: | 0.5 Miles | Actual: | $5,903,345 | 
| District: | Dallas | Let Date: | JUL 2010 | 
| Highway: | VA | Let Status: | Actual | 
| Project ID: | RW 918-47-7 | CSJ: | 0918-47-007 | 
| Description: | RIGHT OF WAY UTILITY ADJUSTMENTS | Handling Code:  | 
LC | 
| Limits From: | VARIOUS LOCATIONS DOWNTOWN DALLAS | Fund Cat: | 9 | 
| Limits To: | . | Estimate: | |
| Length: | 0.0 Miles | Actual: | $2,500,000 | 
| 
Back... | 
Totals for 0918-45-861 | ||
| Length: | 0.5 Miles | ||
| Estimate: | $6,792,173 | ||
| Actual: | $8,403,345 | ||
CCSJ: 0918-45-881  | |||
| District: | Dallas | Let Date: | AUG 2010 | 
| Highway: | VA | Let Status: | Actual | 
| Project ID: | NH 2011(318) | CSJ: | 0918-45-881 | 
| Description: | REFURBISH BRIDGE PROTECTION ASSEMBLY SIGNS | Handling Code:  | 
|
| Limits From: | VARIOUS ON SYSTEM LOCATIONS | Fund Cat: | 1 | 
| Limits To: | . | Estimate: | $532,266 | 
| Length: | 0.0 Miles | Actual: | $609,208 | 
| 
Bid Tabulations Back...  | 
Totals for 0918-45-881 | ||
| Length: | 0.0 Miles | ||
| Estimate: | $532,266 | ||
| Actual: | $609,208 | ||
CCSJ: 0918-45-891  | |||
| District: | Dallas | Let Date: | MAY 2010 | 
| Highway: | VA | Let Status: | Actual | 
| Project ID: | NH 2010(587) | CSJ: | 0918-45-891 | 
| Description: | EXPEDITE 408 PERMITS | Handling Code:  | 
XX | 
| Limits From: | PRE ENG FOR NEW LOC IH35E/SH 183 | Fund Cat: | 7 | 
| Limits To: | US 175/SH 310 (TRINITY PARKWAY) | Estimate: | $5,000,000 | 
| Length: | 0.0 Miles | Actual: | $5,000,000 | 
| 
Back... | 
Totals for 0918-45-891 | ||
| Length: | 0.0 Miles | ||
| Estimate: | $5,000,000 | ||
| Actual: | $5,000,000 | ||
CCSJ: 0918-45-894  | |||
| District: | Dallas | Let Date: | AUG 2010 | 
| Highway: | VA | Let Status: | Actual | 
| Project ID: | CM 2011(442) | CSJ: | 0918-45-894 | 
| Description: | TRINITY RAILWAY EXPRESS DOUBLE TRACK AND GRADE SEPARATIONS; | Handling Code:  | 
TR | 
| Limits From: | ON TRE RR IN IRVING | Fund Cat: | 5 | 
| Limits To: | GILBERT RD TO WEST OF IRBY- PHASE 2 | Estimate: | $19,276,725 | 
| Length: | 0.0 Miles | Actual: | $19,276,725 | 
| 
Back... | 
Totals for 0918-45-894 | ||
| Length: | 0.0 Miles | ||
| Estimate: | $19,276,725 | ||
| Actual: | $19,276,725 | ||
CCSJ: 1047-02-046  | |||
| District: | Dallas | Let Date: | DEC 2009 | 
| Highway: | FM 1382 | Let Status: | Actual | 
| Project ID: | STP 2010(431)MM | CSJ: | 1047-02-046 | 
| Description: | TRAFFIC SIGNAL IMPROVEMENT | Handling Code:  | 
|
| Limits From: | AT NORTH CLARK ROAD | Fund Cat: | 7 | 
| Limits To: | IN CEDAR HILL | Estimate: | $121,219 | 
| Length: | 0.0 Miles | Actual: | $86,000 | 
| 
Back... | 
Totals for 1047-02-046 | ||
| Length: | 0.0 Miles | ||
| Estimate: | $121,219 | ||
| Actual: | $86,000 | ||
CCSJ: 1047-02-047  | |||
| District: | Dallas | Let Date: | JUN 2010 | 
| Highway: | FM 1382 | Let Status: | Actual | 
| Project ID: | NH 2010(890) | CSJ: | 1047-02-047 | 
| Description: | REFURBISH EXISTING AND INSTALL NEW CONTINUOUS ILLUMINATION | Handling Code:  | 
|
| Limits From: | US 67 | Fund Cat: | 1 | 
| Limits To: | IH 35E | Estimate: | $391,653 | 
| Length: | 7.1 Miles | Actual: | $321,973 | 
| 
Back... | 
Totals for 1047-02-047 | ||
| Length: | 7.1 Miles | ||
| Estimate: | $391,653 | ||
| Actual: | $321,973 | ||
CCSJ: 1068-04-140  | |||
| District: | Dallas | Let Date: | AUG 2010 | 
| Highway: | IH 30 | Let Status: | Actual | 
| Project ID: | CM 2011(319) | CSJ: | 1068-04-140 | 
| Description: | INSTALLATION OF 2 DYNAMIC MESSAGE SIGNS | Handling Code:  | 
|
| Limits From: | DALLAS/TARRANT COUNTY LINE | Fund Cat: | 5 | 
| Limits To: | IH 35E | Estimate: | $369,420 | 
| Length: | 13.1 Miles | Actual: | $138,137 | 
| 
Bid Tabulations Back...  | 
Totals for 1068-04-140 | ||
| Length: | 13.1 Miles | ||
| Estimate: | $369,420 | ||
| Actual: | $138,137 | ||
CCSJ: 1068-04-150  | |||
| District: | Dallas | Let Date: | NOV 2009 | 
| Highway: | IH 30 | Let Status: | Actual | 
| Project ID: | CM 2010(486) | CSJ: | 1068-04-150 | 
| Description: | INSTALL COMMUNICATIONS EQUIPMENT AT MAJOR INTERSECTIONS ON | Handling Code:  | 
XX | 
| Limits From: | SH 161 | Fund Cat: | 5 | 
| Limits To: | MACARTHUR BLVD IN GRAND PRAIRIE | Estimate: | $76,542 | 
| Length: | 4.1 Miles | Actual: | $76,542 | 
| 
Back... | 
Totals for 1068-04-150 | ||
| Length: | 4.1 Miles | ||
| Estimate: | $76,542 | ||
| Actual: | $76,542 | ||
CCSJ: 1068-04-151  | |||
| District: | Dallas | Let Date: | FEB 2010 | 
| Highway: | IH 30 | Let Status: | Actual | 
| Project ID: | IM 0301(055) | CSJ: | 1068-04-151 | 
| Description: | ACP OVERLAY OF EXISTING HIGHWAY AND LANDSCAPING | Handling Code:  | 
|
| Limits From: | WEST OF FORT WORTH AVE | Fund Cat: | 1 | 
| Limits To: | EAST OF SYLVAN AVE | Estimate: | $625,111 | 
| Length: | 1.1 Miles | Actual: | $592,144 | 
| 
Back... | 
Totals for 1068-04-151 | ||
| Length: | 1.1 Miles | ||
| Estimate: | $625,111 | ||
| Actual: | $592,144 | ||
CCSJ: 2374-02-124  | |||
| District: | Dallas | Let Date: | SEP 2009 | 
| Highway: | IH 635 | Let Status: | Actual | 
| Project ID: | C 2374-2-124 | CSJ: | 2374-02-124 | 
| Description: | CONSTRUCT NB FRONTAGE ROAD IN CITY OF GARLAND | Handling Code:  | 
|
| Limits From: | EAST OF CENTERVILLE RD. | Fund Cat: | 10 | 
| Limits To: | NORTHWEST HIGHWAY | Estimate: | $8,277,643 | 
| Length: | 1.3 Miles | Actual: | $7,718,650 | 
| 
Back... | 
Totals for 2374-02-124 | ||
| Length: | 1.3 Miles | ||
| Estimate: | $8,277,643 | ||
| Actual: | $7,718,650 | ||
CCSJ: 2374-02-131  | |||
| District: | Dallas | Let Date: | MAR 2010 | 
| Highway: | IH 635 | Let Status: | Actual | 
| Project ID: | IM 0635(419) | CSJ: | 2374-02-131 | 
| Description: | REMOVE AND SEAL PAVEMENT MARKINGS ON SOUTHBOUND MAINLANES | Handling Code:  | 
|
| Limits From: | ELAM ROAD IN BALCH SPRINGS | Fund Cat: | 1 | 
| Limits To: | US 80 | Estimate: | $298,133 | 
| Length: | 5.2 Miles | Actual: | $209,951 | 
| 
Back... | 
Totals for 2374-02-131 | ||
| Length: | 5.2 Miles | ||
| Estimate: | $298,133 | ||
| Actual: | $209,951 | ||
CCSJ: 2374-02-132  | |||
| District: | Dallas | Let Date: | AUG 2010 | 
| Highway: | IH 635 | Let Status: | Actual | 
| Project ID: | CM 2011(320) | CSJ: | 2374-02-132 | 
| Description: | UPGRADE EXISTING ISDN TO A WIRELESS ITS SYSTEM | Handling Code:  | 
|
| Limits From: | TOWNE CENTRE BLVD | Fund Cat: | 5 | 
| Limits To: | IH 30 IN MESQUITE | Estimate: | $87,633 | 
| Length: | 1.4 Miles | Actual: | $60,998 | 
| 
Bid Tabulations Back...  | 
Totals for 2374-02-132 | ||
| Length: | 1.4 Miles | ||
| Estimate: | $87,633 | ||
| Actual: | $60,998 | ||
CCSJ: 2374-03-075  | |||
| District: | Dallas | Let Date: | JUL 2010 | 
| Highway: | IH 20 | Let Status: | Actual | 
| Project ID: | STP 2010(984)HES | CSJ: | 0095-13-032 | 
| Description: | INSTALL CONCRETE TRAFFIC BARRIER IN MEDIAN; | Handling Code:  | 
|
| Limits From: | RYLIE CREST OVERPASS | Fund Cat: | 1 | 
| Limits To: | IH 635 INTERCHANGE | Estimate: | $113,200 | 
| Length: | 0.1 Miles | Actual: | $48,297 | 
| District: | Dallas | Let Date: | JUL 2010 | 
| Highway: | IH 20 | Let Status: | Actual | 
| Project ID: | STP 2010(984)HES | CSJ: | 2374-03-075 | 
| Description: | INSTALL CTB IN THE MEDIAN | Handling Code:  | 
|
| Limits From: | US 175 INTERCHANGE | Fund Cat: | 1 | 
| Limits To: | RYLIE CREST OVERPASS | Estimate: | $345,309 | 
| Length: | 0.5 Miles | Actual: | $146,703 | 
| 
Back... | 
Totals for 2374-03-075 | ||
| Length: | 0.6 Miles | ||
| Estimate: | $458,509 | ||
| Actual: | $195,000 | ||
CCSJ: 2374-04-064  | |||
| District: | Dallas | Let Date: | JUN 2010 | 
| Highway: | IH 20 | Let Status: | Actual | 
| Project ID: | CM 2010(893) | CSJ: | 2374-04-064 | 
| Description: | INTERSECTION IMPROVEMENTS ADD RIGHT AND LEFT TURN LANES | Handling Code:  | 
|
| Limits From: | AT BELTLINE ROAD IN GRAND PRAIRIE | Fund Cat: | 10 | 
| Limits To: | . | Estimate: | $4,308,363 | 
| Length: | 0.8 Miles | Actual: | $2,051,798 | 
| 
Back... | 
Totals for 2374-04-064 | ||
| Length: | 0.8 Miles | ||
| Estimate: | $4,308,363 | ||
| Actual: | $2,051,798 | ||
CCSJ: 2374-04-068  | |||
| District: | Dallas | Let Date: | DEC 2009 | 
| Highway: | IH 20 | Let Status: | Actual | 
| Project ID: | IM 0205(144) | CSJ: | 2374-04-068 | 
| Description: | LANDSCAPE DEVELOPMENT TO INCLUDE TREES, SHRUBS, IRRIGATION | Handling Code:  | 
|
| Limits From: | HILL CITY DRIVE | Fund Cat: | 10 | 
| Limits To: | COCKRELL HILL ROAD | Estimate: | $307,879 | 
| Length: | 1.5 Miles | Actual: | $278,380 | 
| 
Back... | 
Totals for 2374-04-068 | ||
| Length: | 1.5 Miles | ||
| Estimate: | $307,879 | ||
| Actual: | $278,380 | ||
CCSJ: 2964-01-041  | |||
| District: | Dallas | Let Date: | SEP 2009 | 
| Highway: | SH 161 | Let Status: | Actual | 
| Project ID: | NH 2010(039) | CSJ: | 2964-01-041 | 
| Description: | BRIDGE REPAIR | Handling Code:  | 
|
| Limits From: | AT WALNUT HILL LANE | Fund Cat: | 1 | 
| Limits To: | . | Estimate: | $661,132 | 
| Length: | 0.9 Miles | Actual: | $597,056 | 
| 
Back... | 
Totals for 2964-01-041 | ||
| Length: | 0.9 Miles | ||
| Estimate: | $661,132 | ||
| Actual: | $597,056 | ||
CCSJ: 2964-01-042  | |||
| District: | Dallas | Let Date: | JUN 2010 | 
| Highway: | SH 161 | Let Status: | Actual | 
| Project ID: | NH 2010(895) | CSJ: | 2964-01-042 | 
| Description: | REFURBISH SMALL SIGNS | Handling Code:  | 
|
| Limits From: | SH 183 | Fund Cat: | 1 | 
| Limits To: | IH 635 | Estimate: | $112,392 | 
| Length: | 3.4 Miles | Actual: | $71,713 | 
| 
Back... | 
Totals for 2964-01-042 | ||
| Length: | 3.4 Miles | ||
| Estimate: | $112,392 | ||
| Actual: | $71,713 | ||
CCSJ: 2964-01-043  | |||
| District: | Dallas | Let Date: | AUG 2010 | 
| Highway: | SH 161 | Let Status: | Actual | 
| Project ID: | STP 2010(499)MM | CSJ: | 2964-01-043 | 
| Description: | COG CORRIDOR PEAK PRICING BEFORE AND AFTER SURVEY; ANALYZE | Handling Code:  | 
XX | 
| Limits From: | IH 20 | Fund Cat: | 7 | 
| Limits To: | SH 183 | Estimate: | $1,241,668 | 
| Length: | 25.4 Miles | Actual: | $1,241,668 | 
| 
Back... | 
Totals for 2964-01-043 | ||
| Length: | 25.4 Miles | ||
| Estimate: | $1,241,668 | ||
| Actual: | $1,241,668 | ||
 
  | 
|   |