Detail Letting Schedule for Dallas County (FY 2010)
Detail Letting Schedule for Dallas County (FY 2010) | ||||
Last Update: Tuesday, November 2, 2010 |
Dallas County (FY 2010) |
CCSJ: 0008-08-068 | |||
District: | Dallas | Let Date: | OCT 2009 |
Highway: | SH 180 | Let Status: | Actual |
Project ID: | STP 2010(201) | CSJ: | 0008-08-068 |
Description: | REPLACE DAMAGED SAFETY BARRIER AND REPLACE HEADWALL | Handling Code: |
|
Limits From: | W. DAVIS AT COOMBS CREEK | Fund Cat: | 1 |
Limits To: | . | Estimate: | $30,515 |
Length: | 0.0 Miles | Actual: | $24,996 |
Back... |
Totals for 0008-08-068 | ||
---|---|---|---|
Length: | 0.0 Miles | ||
Estimate: | $30,515 | ||
Actual: | $24,996 | ||
CCSJ: 0009-11-219 | |||
District: | Dallas | Let Date: | MAY 2010 |
Highway: | IH 30 | Let Status: | Actual |
Project ID: | IM 0305(079) | CSJ: | 0009-11-219 |
Description: | UPGRADE TRAFFIC SIGNAL HARDWARE AT 2 INTERSECTIONS ON IH 30 | Handling Code: |
|
Limits From: | AT THE INTERSECTIONS OF | Fund Cat: | 1 |
Limits To: | PEAK AND FERGUSON | Estimate: | $408,278 |
Length: | 0.0 Miles | Actual: | $330,486 |
District: | Dallas | Let Date: | MAY 2010 |
Highway: | US 175 | Let Status: | Actual |
Project ID: | NH 2010(035) | CSJ: | 0092-01-055 |
Description: | UPGRADE TRAFFIC SIGNAL HARDWARE AT 2 INTERSECTIONS ON US 175 | Handling Code: |
|
Limits From: | AT THE INTERSETION OF | Fund Cat: | 1 |
Limits To: | M L KING JR BLVD AND HATCHER ST | Estimate: | $350,823 |
Length: | 0.0 Miles | Actual: | $295,041 |
District: | Dallas | Let Date: | MAY 2010 |
Highway: | IH 45 | Let Status: | Actual |
Project ID: | IM 0305(079) | CSJ: | 0092-14-077 |
Description: | UPGRADE TRAFFIC SIGNAL HARDWARE | Handling Code: |
|
Limits From: | AT INTERSECTION OF LAMAR ST | Fund Cat: | 1 |
Limits To: | IN CITY OF DALLAS | Estimate: | $252,775 |
Length: | 0.0 Miles | Actual: | $202,473 |
Back... |
Totals for 0009-11-219 | ||
Length: | 0.0 Miles | ||
Estimate: | $1,011,876 | ||
Actual: | $828,000 | ||
CCSJ: 0009-11-220 | |||
District: | Dallas | Let Date: | AUG 2010 |
Highway: | IH 30 | Let Status: | Actual |
Project ID: | C 9-11-220 | CSJ: | 0009-11-220 |
Description: | CONSTRUCT PERMANENT CONTRAFLOW HOV LANES | Handling Code: |
|
Limits From: | WEST OF GOOD-LATIMER EXPWY | Fund Cat: | 1 |
Limits To: | EAST OF HASKELL AVE | Estimate: | $1,842,860 |
Length: | 1.4 Miles | Actual: | $2,384,031 |
District: | Dallas | Let Date: | AUG 2010 |
Highway: | IH 30 | Let Status: | Actual |
Project ID: | CC 9-11-221 | CSJ: | 0009-11-221 |
Description: | REPLACE FOUR DYNAMIC MESSAGE SIGNS FOR CONTRAFLOW HOV LANE | Handling Code: |
|
Limits From: | ERVAY ST. | Fund Cat: | 10 |
Limits To: | FERGUSON RD IN DALLAS | Estimate: | $157,122 |
Length: | 4.5 Miles | Actual: | $175,037 |
Project Addenda Bid Tabulations Back... |
Totals for 0009-11-220 | ||
Length: | 5.9 Miles | ||
Estimate: | $1,999,982 | ||
Actual: | $2,559,068 | ||
CCSJ: 0047-07-213 | |||
District: | Dallas | Let Date: | OCT 2009 |
Highway: | US 75 | Let Status: | Actual |
Project ID: | STP 2010(202)MM | CSJ: | 0047-07-213 |
Description: | INTERSECTION IMPROVEMENTS - DUAL RIGHTS NB TO EB_AND | Handling Code: |
|
Limits From: | AT INTERSECTION OF FOREST LANE | Fund Cat: | 7 |
Limits To: | IN CITY OF DALLAS | Estimate: | $166,638 |
Length: | 0.1 Miles | Actual: | $112,294 |
Back... |
Totals for 0047-07-213 | ||
Length: | 0.1 Miles | ||
Estimate: | $166,638 | ||
Actual: | $112,294 | ||
CCSJ: 0047-07-217 | |||
District: | Dallas | Let Date: | JUL 2010 |
Highway: | US 75 | Let Status: | Actual |
Project ID: | NH 2010(978) | CSJ: | 0047-07-217 |
Description: | LANDSCAPE DEVELOPMENT INCLUDING SOIL AMENDMENTS | Handling Code: |
|
Limits From: | SPUR 366 / WOODALL RODGERS | Fund Cat: | 10 |
Limits To: | COTTONWOOD CREEK | Estimate: | $964,224 |
Length: | 10.0 Miles | Actual: | $821,488 |
Back... |
Totals for 0047-07-217 | ||
Length: | 10.0 Miles | ||
Estimate: | $964,224 | ||
Actual: | $821,488 | ||
CCSJ: 0092-02-116 | |||
District: | Dallas | Let Date: | AUG 2010 |
Highway: | IH 45 | Let Status: | Actual |
Project ID: | HP 2011(147) | CSJ: | 0092-02-116 |
Description: | UPGRADE INTERCHANGE FOR EXPANDED MULTIMODAL TRAFFIC | Handling Code: |
|
Limits From: | AT FULGHUM RD INTERCHANGE | Fund Cat: | 10 |
Limits To: | . | Estimate: | $3,701,730 |
Length: | 1.8 Miles | Actual: | $3,832,239 |
Bid Tabulations Back... |
Totals for 0092-02-116 | ||
Length: | 1.8 Miles | ||
Estimate: | $3,701,730 | ||
Actual: | $3,832,239 | ||
CCSJ: 0094-03-105 | |||
District: | Dallas | Let Date: | AUG 2010 |
Highway: | SH 183 | Let Status: | Actual |
Project ID: | C 94-3-103 | CSJ: | 0094-03-103 |
Description: | CONSTRUCT SOUND WALLS | Handling Code: |
|
Limits From: | WEST OF STORY RD | Fund Cat: | 10 |
Limits To: | WINGREN ROAD | Estimate: | $3,551,625 |
Length: | 0.0 Miles | Actual: | $2,153,469 |
District: | Dallas | Let Date: | AUG 2010 |
Highway: | SH 183 | Let Status: | Actual |
Project ID: | C 94-3-105 | CSJ: | 0094-03-105 |
Description: | CONSTRUCT EASTBOUND FRONTAGE ROAD | Handling Code: |
|
Limits From: | WEST OF STORY RD | Fund Cat: | 10 |
Limits To: | WILLIAM BREWSTER ST | Estimate: | $6,614,710 |
Length: | 1.2 Miles | Actual: | $4,957,688 |
Bid Tabulations Back... |
Totals for 0094-03-105 | ||
Length: | 1.2 Miles | ||
Estimate: | $10,166,335 | ||
Actual: | $7,111,157 | ||
CCSJ: 0095-13-029 | |||
District: | Dallas | Let Date: | JUL 2010 |
Highway: | IH 20 | Let Status: | Actual |
Project ID: | C 95-13-29 | CSJ: | 0095-13-029 |
Description: | FULL DEPTH PAVEMENT REPAIR | Handling Code: |
|
Limits From: | IH 635 | Fund Cat: | 1 |
Limits To: | KAUFMAN COUNTY LINE; EASTBOUND | Estimate: | $1,703,700 |
Length: | 6.3 Miles | Actual: | $1,250,269 |
Back... |
Totals for 0095-13-029 | ||
Length: | 6.3 Miles | ||
Estimate: | $1,703,700 | ||
Actual: | $1,250,269 | ||
CCSJ: 0196-07-021 | |||
District: | Dallas | Let Date: | SEP 2009 |
Highway: | SP 366 | Let Status: | Actual |
Project ID: | STP 2010(036)MM | CSJ: | 0196-07-021 |
Description: | INTERSECTION IMPROVEMENTS | Handling Code: |
|
Limits From: | SPUR 366 (WOODALL RODGERS FRWY) | Fund Cat: | 7 |
Limits To: | AT PEARL ST AND OLIVE ST | Estimate: | $747,770 |
Length: | 0.3 Miles | Actual: | $593,554 |
District: | Dallas | Let Date: | SEP 2009 |
Highway: | SP 366 | Let Status: | Actual |
Project ID: | STP 2008(919)MM | CSJ: | 0196-07-028 |
Description: | ROW ACQUISITION & UTILITIES | Handling Code: |
NC |
Limits From: | SPUR 366 (WOODALL RODGERS FRWY) | Fund Cat: | 7 |
Limits To: | AT PEARL ST AND OLIVE ST | Estimate: | |
Length: | 0.0 Miles | Actual: | $25,092 |
Back... |
Totals for 0196-07-021 | ||
Length: | 0.3 Miles | ||
Estimate: | $747,770 | ||
Actual: | $618,646 | ||
CCSJ: 0261-02-065 | |||
District: | Dallas | Let Date: | SEP 2009 |
Highway: | US 67 | Let Status: | Actual |
Project ID: | C 261-2-65 | CSJ: | 0261-02-065 |
Description: | PROVIDE AUXILIARY LANE NB AND SB | Handling Code: |
|
Limits From: | COCKRELL HILL RD | Fund Cat: | 10 |
Limits To: | WHEATLAND RD | Estimate: | $1,965,142 |
Length: | 0.6 Miles | Actual: | $1,942,330 |
District: | Dallas | Let Date: | SEP 2009 |
Highway: | US 67 | Let Status: | Actual |
Project ID: | C 261-3-54 | CSJ: | 0261-03-054 |
Description: | PROVIDING AUXILIARY LANES IN BOTH DIRECTIONS | Handling Code: |
|
Limits From: | WHEATLAND RD | Fund Cat: | 10 |
Limits To: | 2600 FT NORTH OF WHEATLAND RD | Estimate: | $1,934,550 |
Length: | 0.5 Miles | Actual: | $1,952,408 |
Back... |
Totals for 0261-02-065 | ||
Length: | 1.1 Miles | ||
Estimate: | $3,899,692 | ||
Actual: | $3,894,738 | ||
CCSJ: 0261-03-053 | |||
District: | Dallas | Let Date: | AUG 2010 |
Highway: | US 67 | Let Status: | Actual |
Project ID: | NH 2011(346) | CSJ: | 0261-03-053 |
Description: | CONSTRUCT NB AUXILIARY LANE, WIDEN NBML BRIDGE, CHANNEL WORK | Handling Code: |
|
Limits From: | NORTH OF IH 20 | Fund Cat: | 1 |
Limits To: | SOUTH OF RED BIRD LN | Estimate: | $3,482,183 |
Length: | 1.0 Miles | Actual: | $3,685,288 |
Bid Tabulations Back... |
Totals for 0261-03-053 | ||
Length: | 1.0 Miles | ||
Estimate: | $3,482,183 | ||
Actual: | $3,685,288 | ||
CCSJ: 0261-03-059 | |||
District: | Dallas | Let Date: | MAY 2010 |
Highway: | US 67 | Let Status: | Actual |
Project ID: | NH 2010(848) | CSJ: | 0261-03-059 |
Description: | UPGRADE TRAFFIC SINGAL HARDWARE AT 2 INTERSECTIONS ON US 67 | Handling Code: |
|
Limits From: | AT THE INTERSECTIONS OF | Fund Cat: | 1 |
Limits To: | KIEST AND POLK | Estimate: | $361,018 |
Length: | 0.0 Miles | Actual: | $288,432 |
District: | Dallas | Let Date: | MAY 2010 |
Highway: | LP 12 | Let Status: | Actual |
Project ID: | NH 2010(848) | CSJ: | 0581-02-131 |
Description: | UPGRADE TRAFFIC SIGNAL HARDWARE | Handling Code: |
|
Limits From: | AT THE INTERSECTION OF DAVIS ST | Fund Cat: | 1 |
Limits To: | IN CITY OF DALLAS | Estimate: | $178,436 |
Length: | 0.0 Miles | Actual: | $159,908 |
District: | Dallas | Let Date: | MAY 2010 |
Highway: | IH 635 | Let Status: | Actual |
Project ID: | IM 6356(420) | CSJ: | 2374-01-160 |
Description: | UPGRADE TRAFFIC SIGNAL HARDWARE | Handling Code: |
|
Limits From: | AT THE INTERSECTION OF PLANO RD | Fund Cat: | 1 |
Limits To: | IN CITY OF DALLAS | Estimate: | $163,023 |
Length: | 0.0 Miles | Actual: | $153,227 |
District: | Dallas | Let Date: | MAY 2010 |
Highway: | IH 20 | Let Status: | Actual |
Project ID: | IM 6356(420) | CSJ: | 2374-04-067 |
Description: | UPGRADE TRAFFIC SIGNAL HARDWARE | Handling Code: |
|
Limits From: | AT THE INTERSECTION | Fund Cat: | 1 |
Limits To: | OF COCKRELL HILL RD | Estimate: | $179,504 |
Length: | 0.0 Miles | Actual: | $171,433 |
Back... |
Totals for 0261-03-059 | ||
Length: | 0.0 Miles | ||
Estimate: | $881,981 | ||
Actual: | $773,000 | ||
CCSJ: 0261-03-060 | |||
District: | Dallas | Let Date: | JUL 2010 |
Highway: | US 67 | Let Status: | Actual |
Project ID: | NH 2010(980) | CSJ: | 0261-03-060 |
Description: | LANDSCAPE DEVELOPMENT TO INCLUDE TREE PLANTING | Handling Code: |
|
Limits From: | 0.1 MILE SOUTH OF POLK ST | Fund Cat: | 10 |
Limits To: | IH 35E | Estimate: | $129,779 |
Length: | 1.1 Miles | Actual: | $126,344 |
Back... |
Totals for 0261-03-060 | ||
Length: | 1.1 Miles | ||
Estimate: | $129,779 | ||
Actual: | $126,344 | ||
CCSJ: 0353-04-088 | |||
District: | Dallas | Let Date: | APR 2010 |
Highway: | SP 348 | Let Status: | Actual |
Project ID: | C 353-4-88 | CSJ: | 0353-04-088 |
Description: | PROVIDE CONSTRUCTION OF GRADE SEPARATION | Handling Code: |
|
Limits From: | AT LAS COLINAS BLVD IN IRVING | Fund Cat: | 10 |
Limits To: | . | Estimate: | $10,874,422 |
Length: | 0.7 Miles | Actual: | $7,469,412 |
District: | Dallas | Let Date: | APR 2010 |
Highway: | SP 348 | Let Status: | Actual |
Project ID: | RW 353-4-92 | CSJ: | 0353-04-092 |
Description: | RIGHT OF WAY ACQUISTION AND UTILITY ADJUSTMENT | Handling Code: |
|
Limits From: | AT LAS COLINAS BLVD IN IRVING | Fund Cat: | 10 |
Limits To: | . | Estimate: | |
Length: | 0.7 Miles | Actual: | $414,335 |
Back... |
Totals for 0353-04-088 | ||
Length: | 1.4 Miles | ||
Estimate: | $10,874,422 | ||
Actual: | $7,883,747 | ||
CCSJ: 0918-00-152 | |||
District: | Dallas | Let Date: | APR 2010 |
Highway: | VA | Let Status: | Actual |
Project ID: | STP 2010(840)MM | CSJ: | 0918-00-152 |
Description: | NCTCOG - - REGIONAL BICYCLE AND PEDESTRIAN / | Handling Code: |
XX |
Limits From: | NCTCOG STUDY AREA | Fund Cat: | 7 |
Limits To: | . | Estimate: | $1,040,000 |
Length: | 0.0 Miles | Actual: | $1,040,000 |
Back... |
Totals for 0918-00-152 | ||
Length: | 0.0 Miles | ||
Estimate: | $1,040,000 | ||
Actual: | $1,040,000 | ||
CCSJ: 0918-00-154 | |||
District: | Dallas | Let Date: | MAY 2010 |
Highway: | VA | Let Status: | Actual |
Project ID: | STP 2010(138) | CSJ: | 0918-00-154 |
Description: | INSTALL UNINTERRUPTED POWER SUPPLY AT SIGNALIZED | Handling Code: |
|
Limits From: | VARIOUS LOCATIONS IN DALLAS, DENTON | Fund Cat: | 1 |
Limits To: | AND ROCKWALL COUNTIES | Estimate: | $762,324 |
Length: | 0.0 Miles | Actual: | $549,207 |
Back... |
Totals for 0918-00-154 | ||
Length: | 0.0 Miles | ||
Estimate: | $762,324 | ||
Actual: | $549,207 | ||
CCSJ: 0918-00-155 | |||
District: | Dallas | Let Date: | OCT 2009 |
Highway: | VA | Let Status: | Actual |
Project ID: | STP 2010(196)MM | CSJ: | 0918-00-155 |
Description: | TRUCK LANE RESETRICTION SIGNING WITHIN MPA BOUNDARY | Handling Code: |
|
Limits From: | TRUCK LANE RESTRICTIONS | Fund Cat: | 7 |
Limits To: | ON IH 20 AND IH 45 | Estimate: | $261,992 |
Length: | 0.0 Miles | Actual: | $225,700 |
Back... |
Totals for 0918-00-155 | ||
Length: | 0.0 Miles | ||
Estimate: | $261,992 | ||
Actual: | $225,700 | ||
CCSJ: 0918-00-156 | |||
District: | Dallas | Let Date: | SEP 2009 |
Highway: | VA | Let Status: | Actual |
Project ID: | STP 2010(038) | CSJ: | 0918-00-156 |
Description: | ASBESTOS ABATEMENT ON BRIDGES IN ADVANCE OF OTHER | Handling Code: |
|
Limits From: | DISTRICTWIDE | Fund Cat: | 1 |
Limits To: | (ON-SYSTEM) | Estimate: | $849,758 |
Length: | 0.0 Miles | Actual: | $690,175 |
Back... |
Totals for 0918-00-156 | ||
Length: | 0.0 Miles | ||
Estimate: | $849,758 | ||
Actual: | $690,175 | ||
CCSJ: 0918-00-157 | |||
District: | Dallas | Let Date: | OCT 2009 |
Highway: | VA | Let Status: | Actual |
Project ID: | STP 2010(184) | CSJ: | 0918-00-157 |
Description: | NON - SITE SPECIFIC TRAFFIC SIGNAL INSTALLATION | Handling Code: |
|
Limits From: | DISTRICTWIDE | Fund Cat: | 1 |
Limits To: | . | Estimate: | $1,430,500 |
Length: | 0.0 Miles | Actual: | $1,208,758 |
Back... |
Totals for 0918-00-157 | ||
Length: | 0.0 Miles | ||
Estimate: | $1,430,500 | ||
Actual: | $1,208,758 | ||
CCSJ: 0918-00-158 | |||
District: | Dallas | Let Date: | MAR 2010 |
Highway: | VA | Let Status: | Actual |
Project ID: | STP 2010(620) | CSJ: | 0918-00-158 |
Description: | NON - SITE SPECIFIC SIGN REPLACEMENT AND REFURBISHING | Handling Code: |
|
Limits From: | DISTRICTWIDE | Fund Cat: | 1 |
Limits To: | . | Estimate: | $919,389 |
Length: | 0.0 Miles | Actual: | $765,741 |
Back... |
Totals for 0918-00-158 | ||
Length: | 0.0 Miles | ||
Estimate: | $919,389 | ||
Actual: | $765,741 | ||
CCSJ: 0918-00-159 | |||
District: | Dallas | Let Date: | AUG 2010 |
Highway: | VA | Let Status: | Actual |
Project ID: | STP 2011(448)MM | CSJ: | 0918-00-159 |
Description: | TRAVEL SURVEY AND DATA COLLECTION EFFORT FOR PROJECTS IN MPO | Handling Code: |
XX |
Limits From: | REGIONAL TRAVEL SURVEY | Fund Cat: | 7 |
Limits To: | (FY 2010) | Estimate: | $1,986,666 |
Length: | 0.0 Miles | Actual: | $1,986,666 |
Back... |
Totals for 0918-00-159 | ||
Length: | 0.0 Miles | ||
Estimate: | $1,986,666 | ||
Actual: | $1,986,666 | ||
CCSJ: 0918-00-167 | |||
District: | Dallas | Let Date: | AUG 2010 |
Highway: | VA | Let Status: | Actual |
Project ID: | STP 2011(592)MM | CSJ: | 0918-00-167 |
Description: | PROVIDE ASSISTANCE TO STRANDED MOTORISTS OR NON INJURY | Handling Code: |
XX |
Limits From: | MOBILITY ASSISTANCE PATROL | Fund Cat: | 7 |
Limits To: | . | Estimate: | $3,370,000 |
Length: | 0.0 Miles | Actual: | $3,369,962 |
Back... |
Totals for 0918-00-167 | ||
Length: | 0.0 Miles | ||
Estimate: | $3,370,000 | ||
Actual: | $3,369,962 | ||
CCSJ: 0918-45-354 | |||
District: | Dallas | Let Date: | MAY 2010 |
Highway: | VA | Let Status: | Actual |
Project ID: | STP 97(253)ESTE | CSJ: | 0918-45-354 |
Description: | SANTA FE TRESTLE HIKE AND BIKE TRAIL | Handling Code: |
LC |
Limits From: | EXISTING TRAILHEAD AT MOORE PARK | Fund Cat: | 9 |
Limits To: | N. TRINITY RIVER LEVEE, DOWNTOWN | Estimate: | $6,107,200 |
Length: | 0.9 Miles | Actual: | $5,575,149 |
Back... |
Totals for 0918-45-354 | ||
Length: | 0.9 Miles | ||
Estimate: | $6,107,200 | ||
Actual: | $5,575,149 | ||
CCSJ: 0918-45-366 | |||
District: | Dallas | Let Date: | SEP 2009 |
Highway: | CS | Let Status: | Actual |
Project ID: | STP 97(431)MM | CSJ: | 0918-45-366 |
Description: | WIDEN 2 - LANE FACILITY TO 4 - LANE DIVIDED FACILITY | Handling Code: |
|
Limits From: | ON MEDICAL DIST DR,HARRY HINES BLVD | Fund Cat: | 7 |
Limits To: | MAPLE AVENUE | Estimate: | $3,453,274 |
Length: | 0.5 Miles | Actual: | $2,601,474 |
District: | Dallas | Let Date: | SEP 2009 |
Highway: | CS | Let Status: | Actual |
Project ID: | STP 2008(854)MM | CSJ: | 0918-45-814 |
Description: | ACQUISITION, RELOCATION & UTILITIES | Handling Code: |
NC |
Limits From: | ON MEDICAL DIST DR HARRY HINES BLVD | Fund Cat: | 7 |
Limits To: | MAPLE AVENUE | Estimate: | |
Length: | 0.0 Miles | Actual: | $666,538 |
Back... |
Totals for 0918-45-366 | ||
Length: | 0.5 Miles | ||
Estimate: | $3,453,274 | ||
Actual: | $3,268,012 | ||
CCSJ: 0918-45-368 | |||
District: | Dallas | Let Date: | APR 2010 |
Highway: | CS | Let Status: | Actual |
Project ID: | STP 97(433)MM | CSJ: | 0918-45-368 |
Description: | WIDEN 4 - LANE FACILITY TO 5 - LANE FACILITY | Handling Code: |
|
Limits From: | ON MONTFORT DRIVE, PETERSON LANE | Fund Cat: | 7 |
Limits To: | ALPHA ROAD | Estimate: | $547,192 |
Length: | 0.2 Miles | Actual: | $563,823 |
District: | Dallas | Let Date: | APR 2010 |
Highway: | CS | Let Status: | Actual |
Project ID: | STP 2001(674)MM | CSJ: | 0918-45-577 |
Description: | RIGHT OF WAY ACQUISITION, RELOCATION ASSISTANCE AND UTILITY | Handling Code: |
|
Limits From: | ON MONTFORT DRIVE, PETERSON LANE | Fund Cat: | 7 |
Limits To: | ALPHA ROAD | Estimate: | |
Length: | 0.0 Miles | Actual: | $173,390 |
Back... |
Totals for 0918-45-368 | ||
Length: | 0.2 Miles | ||
Estimate: | $547,192 | ||
Actual: | $737,213 | ||
CCSJ: 0918-45-533 | |||
District: | Dallas | Let Date: | NOV 2009 |
Highway: | VA | Let Status: | Actual |
Project ID: | STP 2000(555)ESTE | CSJ: | 0918-45-533 |
Description: | SCENIC BEAUTIFICATION PROJECT TO PROVIDE STREET FURNITURE | Handling Code: |
LC |
Limits From: | CITY OF LANCASTER HISTORIC DISTRICT | Fund Cat: | 9 |
Limits To: | . | Estimate: | $535,287 |
Length: | 0.0 Miles | Actual: | $635,540 |
Back... |
Totals for 0918-45-533 | ||
Length: | 0.0 Miles | ||
Estimate: | $535,287 | ||
Actual: | $635,540 | ||
CCSJ: 0918-45-541 | |||
District: | Dallas | Let Date: | JUL 2010 |
Highway: | CS | Let Status: | Actual |
Project ID: | CM 2001(272) | CSJ: | 0918-45-541 |
Description: | ONE OFF SYSTEM INTERSECTION IMPROVEMENT | Handling Code: |
|
Limits From: | ON MIDWAY RD AT TRINITY MILLS RD | Fund Cat: | 5 |
Limits To: | . | Estimate: | $846,697 |
Length: | 0.2 Miles | Actual: | $866,143 |
Back... |
Totals for 0918-45-541 | ||
Length: | 0.2 Miles | ||
Estimate: | $846,697 | ||
Actual: | $866,143 | ||
CCSJ: 0918-45-587 | |||
District: | Dallas | Let Date: | FEB 2010 |
Highway: | VA | Let Status: | Actual |
Project ID: | CM 2001(795) | CSJ: | 0918-45-587 |
Description: | CONSTRUCT TRAIL EXTENSION TO EXISTING KATY TRAIL WITH | Handling Code: |
LC |
Limits From: | ON KATY TRAIL FROM MCCOMMAS BLVD | Fund Cat: | 5 |
Limits To: | SKILLMAN ST AND SANDHURST LN | Estimate: | $1,861,995 |
Length: | 1.1 Miles | Actual: | $809,298 |
Back... |
Totals for 0918-45-587 | ||
Length: | 1.1 Miles | ||
Estimate: | $1,861,995 | ||
Actual: | $809,298 | ||
CCSJ: 0918-45-640 | |||
District: | Dallas | Let Date: | FEB 2010 |
Highway: | VA | Let Status: | Actual |
Project ID: | STP 2002(126)ESTE | CSJ: | 0918-45-640 |
Description: | CONSTRUCT PEDESTRIAN BRIDGE OVER IH635 (LBJ) TO DART STATION | Handling Code: |
|
Limits From: | DART LINE FROM AUDELIA RD NORTHEAST | Fund Cat: | 9 |
Limits To: | 626 FT BRIDGE TO SKILLMAN DART STAT | Estimate: | $2,227,449 |
Length: | 0.3 Miles | Actual: | $1,549,413 |
Back... |
Totals for 0918-45-640 | ||
Length: | 0.3 Miles | ||
Estimate: | $2,227,449 | ||
Actual: | $1,549,413 | ||
CCSJ: 0918-45-642 | |||
District: | Dallas | Let Date: | MAY 2010 |
Highway: | VA | Let Status: | Actual |
Project ID: | STP 2002(128)ESTE | CSJ: | 0918-45-642 |
Description: | PEDESTRIAN / BICYCLE LINK BETWEEN 2 TRAILS | Handling Code: |
LC |
Limits From: | E SIDE OF COIT RD @ HAYMEADOW, S | Fund Cat: | 9 |
Limits To: | SPRING VALLEY, E ON N SIDE TO MAHAM | Estimate: | $585,422 |
Length: | 0.8 Miles | Actual: | $429,037 |
Back... |
Totals for 0918-45-642 | ||
Length: | 0.8 Miles | ||
Estimate: | $585,422 | ||
Actual: | $429,037 | ||
CCSJ: 0918-45-758 | |||
District: | Dallas | Let Date: | DEC 2009 |
Highway: | CS | Let Status: | Actual |
Project ID: | BR 2007(302) | CSJ: | 0918-45-758 |
Description: | REPLACE BRIDGE AND APPROACHES | Handling Code: |
|
Limits From: | PARK LANE AT BACHMAN BRANCH | Fund Cat: | 6 |
Limits To: | IN CITY OF DALLAS | Estimate: | $795,645 |
Length: | 0.1 Miles | Actual: | $739,138 |
District: | Dallas | Let Date: | DEC 2009 |
Highway: | CS | Let Status: | Actual |
Project ID: | RW 918-45-879 | CSJ: | 0918-45-879 |
Description: | RIGHT OF WAY UTILITY ADJUSTMENTS | Handling Code: |
NC |
Limits From: | PARK LANE AT BACHMAN CREEK | Fund Cat: | 6 |
Limits To: | . | Estimate: | |
Length: | 0.1 Miles | Actual: | $156,201 |
Back... |
Totals for 0918-45-758 | ||
Length: | 0.2 Miles | ||
Estimate: | $795,645 | ||
Actual: | $895,339 | ||
CCSJ: 0918-45-760 | |||
District: | Dallas | Let Date: | AUG 2010 |
Highway: | CS | Let Status: | Actual |
Project ID: | BR 2007(305) | CSJ: | 0918-45-760 |
Description: | REPLACE BRIDGE AND APPROACHES | Handling Code: |
|
Limits From: | WEST LAWTHER DRIVE | Fund Cat: | 6 |
Limits To: | WHITE ROCK CREEK | Estimate: | $616,396 |
Length: | 0.1 Miles | Actual: | $681,031 |
Bid Tabulations Back... |
Totals for 0918-45-760 | ||
Length: | 0.1 Miles | ||
Estimate: | $616,396 | ||
Actual: | $681,031 | ||
CCSJ: 0918-45-763 | |||
District: | Dallas | Let Date: | FEB 2010 |
Highway: | VA | Let Status: | Actual |
Project ID: | STP 2007(832)MM | CSJ: | 0918-45-763 |
Description: | INTERSECTION IMPROVEMENTS | Handling Code: |
|
Limits From: | ON GALLOWAY AVE AT US 80 | Fund Cat: | 7 |
Limits To: | . | Estimate: | $279,517 |
Length: | 0.2 Miles | Actual: | $268,100 |
Back... |
Totals for 0918-45-763 | ||
Length: | 0.2 Miles | ||
Estimate: | $279,517 | ||
Actual: | $268,100 | ||
CCSJ: 0918-45-772 | |||
District: | Dallas | Let Date: | FEB 2010 |
Highway: | VA | Let Status: | Actual |
Project ID: | CM 2010(671) | CSJ: | 0918-45-772 |
Description: | ITS ARCHITECTURE DEVELOPMENT | Handling Code: |
XX |
Limits From: | DALLAS AREA INTER-CITY COMMUNICAT'N | Fund Cat: | 5 |
Limits To: | EXCHANGE - PHASE II | Estimate: | $85,000 |
Length: | 0.0 Miles | Actual: | $85,000 |
Back... |
Totals for 0918-45-772 | ||
Length: | 0.0 Miles | ||
Estimate: | $85,000 | ||
Actual: | $85,000 | ||
CCSJ: 0918-45-774 | |||
District: | Dallas | Let Date: | DEC 2009 |
Highway: | VA | Let Status: | Actual |
Project ID: | HP 2006(867) | CSJ: | 0918-45-774 |
Description: | PEDESTRIAN / BICYCLE LINK FOR TRAIL ALONG COTTONWOOD CREEK | Handling Code: |
LC |
Limits From: | HAMILTON PARK | Fund Cat: | 10 |
Limits To: | WHITE ROCK CREEK TRAIL IN DALLAS | Estimate: | $2,453,995 |
Length: | 0.0 Miles | Actual: | $1,125,715 |
District: | Dallas | Let Date: | DEC 2009 |
Highway: | VA | Let Status: | Actual |
Project ID: | HP 2009(053) | CSJ: | 0918-45-852 |
Description: | PEDESTRAIAN / BICYCLE LINK FOR TRAIL ALONG COTTONWOOD CREEK_ - | Handling Code: |
FC |
Limits From: | HAMILTON PARK | Fund Cat: | 10 |
Limits To: | WHITE ROCK CREEK TRAIL IN DALLAS | Estimate: | $1,251,844 |
Length: | 0.0 Miles | Actual: | $1,251,844 |
Back... |
Totals for 0918-45-774 | ||
Length: | 0.0 Miles | ||
Estimate: | $3,705,839 | ||
Actual: | $2,377,559 | ||
CCSJ: 0918-45-799 | |||
District: | Dallas | Let Date: | MAR 2010 |
Highway: | VA | Let Status: | Actual |
Project ID: | STP 2010(583)MM | CSJ: | 0918-45-799 |
Description: | CBD SIGNAGE & WAYFINDING | Handling Code: |
LC |
Limits From: | DALLAS-VARIOUS LOCATIONS | Fund Cat: | 7 |
Limits To: | PHASE II, ON-SYSTEM | Estimate: | $41,000 |
Length: | 0.0 Miles | Actual: | $55,787 |
District: | Dallas | Let Date: | MAR 2010 |
Highway: | VA | Let Status: | Actual |
Project ID: | STP 2010(584)MM | CSJ: | 0918-45-800 |
Description: | CBD SIGNAGE & WAYFINDING | Handling Code: |
LC |
Limits From: | DALLAS-VARIOUS LOCATIONS | Fund Cat: | 7 |
Limits To: | PHASE II, OFF-SYSTEM | Estimate: | $690,375 |
Length: | 0.0 Miles | Actual: | $520,104 |
Back... |
Totals for 0918-45-799 | ||
Length: | 0.0 Miles | ||
Estimate: | $731,375 | ||
Actual: | $575,891 | ||
CCSJ: 0918-45-849 | |||
District: | Dallas | Let Date: | FEB 2010 |
Highway: | CS | Let Status: | Actual |
Project ID: | STP 2010(692)MM | CSJ: | 0918-45-849 |
Description: | INSTALL ITS / TRAIN DETECTION | Handling Code: |
XX |
Limits From: | KINGLSEY RD, LEON RD, & SHILOH ROAD | Fund Cat: | 7 |
Limits To: | AT KCS RR, IN GARLAND | Estimate: | $145,000 |
Length: | 0.0 Miles | Actual: | $145,000 |
Back... |
Totals for 0918-45-849 | ||
Length: | 0.0 Miles | ||
Estimate: | $145,000 | ||
Actual: | $145,000 | ||
CCSJ: 0918-45-857 | |||
District: | Dallas | Let Date: | AUG 2010 |
Highway: | VA | Let Status: | Actual |
Project ID: | STP 2011(284)MM | CSJ: | 0918-45-857 |
Description: | UPGRADE TRINITY RAILWAY EXPRESS (TRE) CROSSINGS; INSTALL | Handling Code: |
TR |
Limits From: | TRE GRADE CROSSINGS AT IRVING YARD | Fund Cat: | 7 |
Limits To: | WAY AND VALLEY VIEW LANE | Estimate: | $714,000 |
Length: | 0.0 Miles | Actual: | $714,000 |
Back... |
Totals for 0918-45-857 | ||
Length: | 0.0 Miles | ||
Estimate: | $714,000 | ||
Actual: | $714,000 | ||
CCSJ: 0918-45-859 | |||
District: | Dallas | Let Date: | MAY 2010 |
Highway: | VA | Let Status: | Actual |
Project ID: | CM 2009(754) | CSJ: | 0918-45-859 |
Description: | NORTHWEST CORRIDOR SEGMENT FROM BACHMAN STATION IN DALLAS | Handling Code: |
TR |
Limits From: | NORTHWEST LIGHT RAIL CORRIDOR | Fund Cat: | 5 |
Limits To: | IN CITIES OF DALLAS AND IRVING | Estimate: | $18,468,138 |
Length: | 0.0 Miles | Actual: | $18,468,139 |
Back... |
Totals for 0918-45-859 | ||
Length: | 0.0 Miles | ||
Estimate: | $18,468,138 | ||
Actual: | $18,468,139 | ||
CCSJ: 0918-45-860 | |||
District: | Dallas | Let Date: | APR 2010 |
Highway: | VA | Let Status: | Actual |
Project ID: | CM 2010(697) | CSJ: | 0918-45-860 |
Description: | DART - TRE TRAIN SET - PHASE 2; PURCHASE 1 ADDITIONAL | Handling Code: |
TR |
Limits From: | TRINITY RAILWAY EXPRESS (TRE) | Fund Cat: | 5 |
Limits To: | IN DALLAS AND TARRANTY COUNTIES | Estimate: | $5,200,000 |
Length: | 0.0 Miles | Actual: | $5,200,000 |
Back... |
Totals for 0918-45-860 | ||
Length: | 0.0 Miles | ||
Estimate: | $5,200,000 | ||
Actual: | $5,200,000 | ||
CCSJ: 0918-45-861 | |||
District: | Dallas | Let Date: | JUL 2010 |
Highway: | VA | Let Status: | Actual |
Project ID: | STP 94(187)TE | CSJ: | 0918-45-861 |
Description: | MCKINNEY TROLLEY PHASE 2 - CONSTRUCT EXTENTION OF TROLLEY | Handling Code: |
LC |
Limits From: | VARIOUS LOCATIONS DOWNTOWN DALLAS | Fund Cat: | 9 |
Limits To: | . | Estimate: | $6,792,173 |
Length: | 0.5 Miles | Actual: | $5,903,345 |
District: | Dallas | Let Date: | JUL 2010 |
Highway: | VA | Let Status: | Actual |
Project ID: | RW 918-47-7 | CSJ: | 0918-47-007 |
Description: | RIGHT OF WAY UTILITY ADJUSTMENTS | Handling Code: |
LC |
Limits From: | VARIOUS LOCATIONS DOWNTOWN DALLAS | Fund Cat: | 9 |
Limits To: | . | Estimate: | |
Length: | 0.0 Miles | Actual: | $2,500,000 |
Back... |
Totals for 0918-45-861 | ||
Length: | 0.5 Miles | ||
Estimate: | $6,792,173 | ||
Actual: | $8,403,345 | ||
CCSJ: 0918-45-881 | |||
District: | Dallas | Let Date: | AUG 2010 |
Highway: | VA | Let Status: | Actual |
Project ID: | NH 2011(318) | CSJ: | 0918-45-881 |
Description: | REFURBISH BRIDGE PROTECTION ASSEMBLY SIGNS | Handling Code: |
|
Limits From: | VARIOUS ON SYSTEM LOCATIONS | Fund Cat: | 1 |
Limits To: | . | Estimate: | $532,266 |
Length: | 0.0 Miles | Actual: | $609,208 |
Bid Tabulations Back... |
Totals for 0918-45-881 | ||
Length: | 0.0 Miles | ||
Estimate: | $532,266 | ||
Actual: | $609,208 | ||
CCSJ: 0918-45-891 | |||
District: | Dallas | Let Date: | MAY 2010 |
Highway: | VA | Let Status: | Actual |
Project ID: | NH 2010(587) | CSJ: | 0918-45-891 |
Description: | EXPEDITE 408 PERMITS | Handling Code: |
XX |
Limits From: | PRE ENG FOR NEW LOC IH35E/SH 183 | Fund Cat: | 7 |
Limits To: | US 175/SH 310 (TRINITY PARKWAY) | Estimate: | $5,000,000 |
Length: | 0.0 Miles | Actual: | $5,000,000 |
Back... |
Totals for 0918-45-891 | ||
Length: | 0.0 Miles | ||
Estimate: | $5,000,000 | ||
Actual: | $5,000,000 | ||
CCSJ: 0918-45-894 | |||
District: | Dallas | Let Date: | AUG 2010 |
Highway: | VA | Let Status: | Actual |
Project ID: | CM 2011(442) | CSJ: | 0918-45-894 |
Description: | TRINITY RAILWAY EXPRESS DOUBLE TRACK AND GRADE SEPARATIONS; | Handling Code: |
TR |
Limits From: | ON TRE RR IN IRVING | Fund Cat: | 5 |
Limits To: | GILBERT RD TO WEST OF IRBY- PHASE 2 | Estimate: | $19,276,725 |
Length: | 0.0 Miles | Actual: | $19,276,725 |
Back... |
Totals for 0918-45-894 | ||
Length: | 0.0 Miles | ||
Estimate: | $19,276,725 | ||
Actual: | $19,276,725 | ||
CCSJ: 1047-02-046 | |||
District: | Dallas | Let Date: | DEC 2009 |
Highway: | FM 1382 | Let Status: | Actual |
Project ID: | STP 2010(431)MM | CSJ: | 1047-02-046 |
Description: | TRAFFIC SIGNAL IMPROVEMENT | Handling Code: |
|
Limits From: | AT NORTH CLARK ROAD | Fund Cat: | 7 |
Limits To: | IN CEDAR HILL | Estimate: | $121,219 |
Length: | 0.0 Miles | Actual: | $86,000 |
Back... |
Totals for 1047-02-046 | ||
Length: | 0.0 Miles | ||
Estimate: | $121,219 | ||
Actual: | $86,000 | ||
CCSJ: 1047-02-047 | |||
District: | Dallas | Let Date: | JUN 2010 |
Highway: | FM 1382 | Let Status: | Actual |
Project ID: | NH 2010(890) | CSJ: | 1047-02-047 |
Description: | REFURBISH EXISTING AND INSTALL NEW CONTINUOUS ILLUMINATION | Handling Code: |
|
Limits From: | US 67 | Fund Cat: | 1 |
Limits To: | IH 35E | Estimate: | $391,653 |
Length: | 7.1 Miles | Actual: | $321,973 |
Back... |
Totals for 1047-02-047 | ||
Length: | 7.1 Miles | ||
Estimate: | $391,653 | ||
Actual: | $321,973 | ||
CCSJ: 1068-04-140 | |||
District: | Dallas | Let Date: | AUG 2010 |
Highway: | IH 30 | Let Status: | Actual |
Project ID: | CM 2011(319) | CSJ: | 1068-04-140 |
Description: | INSTALLATION OF 2 DYNAMIC MESSAGE SIGNS | Handling Code: |
|
Limits From: | DALLAS/TARRANT COUNTY LINE | Fund Cat: | 5 |
Limits To: | IH 35E | Estimate: | $369,420 |
Length: | 13.1 Miles | Actual: | $138,137 |
Bid Tabulations Back... |
Totals for 1068-04-140 | ||
Length: | 13.1 Miles | ||
Estimate: | $369,420 | ||
Actual: | $138,137 | ||
CCSJ: 1068-04-150 | |||
District: | Dallas | Let Date: | NOV 2009 |
Highway: | IH 30 | Let Status: | Actual |
Project ID: | CM 2010(486) | CSJ: | 1068-04-150 |
Description: | INSTALL COMMUNICATIONS EQUIPMENT AT MAJOR INTERSECTIONS ON | Handling Code: |
XX |
Limits From: | SH 161 | Fund Cat: | 5 |
Limits To: | MACARTHUR BLVD IN GRAND PRAIRIE | Estimate: | $76,542 |
Length: | 4.1 Miles | Actual: | $76,542 |
Back... |
Totals for 1068-04-150 | ||
Length: | 4.1 Miles | ||
Estimate: | $76,542 | ||
Actual: | $76,542 | ||
CCSJ: 1068-04-151 | |||
District: | Dallas | Let Date: | FEB 2010 |
Highway: | IH 30 | Let Status: | Actual |
Project ID: | IM 0301(055) | CSJ: | 1068-04-151 |
Description: | ACP OVERLAY OF EXISTING HIGHWAY AND LANDSCAPING | Handling Code: |
|
Limits From: | WEST OF FORT WORTH AVE | Fund Cat: | 1 |
Limits To: | EAST OF SYLVAN AVE | Estimate: | $625,111 |
Length: | 1.1 Miles | Actual: | $592,144 |
Back... |
Totals for 1068-04-151 | ||
Length: | 1.1 Miles | ||
Estimate: | $625,111 | ||
Actual: | $592,144 | ||
CCSJ: 2374-02-124 | |||
District: | Dallas | Let Date: | SEP 2009 |
Highway: | IH 635 | Let Status: | Actual |
Project ID: | C 2374-2-124 | CSJ: | 2374-02-124 |
Description: | CONSTRUCT NB FRONTAGE ROAD IN CITY OF GARLAND | Handling Code: |
|
Limits From: | EAST OF CENTERVILLE RD. | Fund Cat: | 10 |
Limits To: | NORTHWEST HIGHWAY | Estimate: | $8,277,643 |
Length: | 1.3 Miles | Actual: | $7,718,650 |
Back... |
Totals for 2374-02-124 | ||
Length: | 1.3 Miles | ||
Estimate: | $8,277,643 | ||
Actual: | $7,718,650 | ||
CCSJ: 2374-02-131 | |||
District: | Dallas | Let Date: | MAR 2010 |
Highway: | IH 635 | Let Status: | Actual |
Project ID: | IM 0635(419) | CSJ: | 2374-02-131 |
Description: | REMOVE AND SEAL PAVEMENT MARKINGS ON SOUTHBOUND MAINLANES | Handling Code: |
|
Limits From: | ELAM ROAD IN BALCH SPRINGS | Fund Cat: | 1 |
Limits To: | US 80 | Estimate: | $298,133 |
Length: | 5.2 Miles | Actual: | $209,951 |
Back... |
Totals for 2374-02-131 | ||
Length: | 5.2 Miles | ||
Estimate: | $298,133 | ||
Actual: | $209,951 | ||
CCSJ: 2374-02-132 | |||
District: | Dallas | Let Date: | AUG 2010 |
Highway: | IH 635 | Let Status: | Actual |
Project ID: | CM 2011(320) | CSJ: | 2374-02-132 |
Description: | UPGRADE EXISTING ISDN TO A WIRELESS ITS SYSTEM | Handling Code: |
|
Limits From: | TOWNE CENTRE BLVD | Fund Cat: | 5 |
Limits To: | IH 30 IN MESQUITE | Estimate: | $87,633 |
Length: | 1.4 Miles | Actual: | $60,998 |
Bid Tabulations Back... |
Totals for 2374-02-132 | ||
Length: | 1.4 Miles | ||
Estimate: | $87,633 | ||
Actual: | $60,998 | ||
CCSJ: 2374-03-075 | |||
District: | Dallas | Let Date: | JUL 2010 |
Highway: | IH 20 | Let Status: | Actual |
Project ID: | STP 2010(984)HES | CSJ: | 0095-13-032 |
Description: | INSTALL CONCRETE TRAFFIC BARRIER IN MEDIAN; | Handling Code: |
|
Limits From: | RYLIE CREST OVERPASS | Fund Cat: | 1 |
Limits To: | IH 635 INTERCHANGE | Estimate: | $113,200 |
Length: | 0.1 Miles | Actual: | $48,297 |
District: | Dallas | Let Date: | JUL 2010 |
Highway: | IH 20 | Let Status: | Actual |
Project ID: | STP 2010(984)HES | CSJ: | 2374-03-075 |
Description: | INSTALL CTB IN THE MEDIAN | Handling Code: |
|
Limits From: | US 175 INTERCHANGE | Fund Cat: | 1 |
Limits To: | RYLIE CREST OVERPASS | Estimate: | $345,309 |
Length: | 0.5 Miles | Actual: | $146,703 |
Back... |
Totals for 2374-03-075 | ||
Length: | 0.6 Miles | ||
Estimate: | $458,509 | ||
Actual: | $195,000 | ||
CCSJ: 2374-04-064 | |||
District: | Dallas | Let Date: | JUN 2010 |
Highway: | IH 20 | Let Status: | Actual |
Project ID: | CM 2010(893) | CSJ: | 2374-04-064 |
Description: | INTERSECTION IMPROVEMENTS ADD RIGHT AND LEFT TURN LANES | Handling Code: |
|
Limits From: | AT BELTLINE ROAD IN GRAND PRAIRIE | Fund Cat: | 10 |
Limits To: | . | Estimate: | $4,308,363 |
Length: | 0.8 Miles | Actual: | $2,051,798 |
Back... |
Totals for 2374-04-064 | ||
Length: | 0.8 Miles | ||
Estimate: | $4,308,363 | ||
Actual: | $2,051,798 | ||
CCSJ: 2374-04-068 | |||
District: | Dallas | Let Date: | DEC 2009 |
Highway: | IH 20 | Let Status: | Actual |
Project ID: | IM 0205(144) | CSJ: | 2374-04-068 |
Description: | LANDSCAPE DEVELOPMENT TO INCLUDE TREES, SHRUBS, IRRIGATION | Handling Code: |
|
Limits From: | HILL CITY DRIVE | Fund Cat: | 10 |
Limits To: | COCKRELL HILL ROAD | Estimate: | $307,879 |
Length: | 1.5 Miles | Actual: | $278,380 |
Back... |
Totals for 2374-04-068 | ||
Length: | 1.5 Miles | ||
Estimate: | $307,879 | ||
Actual: | $278,380 | ||
CCSJ: 2964-01-041 | |||
District: | Dallas | Let Date: | SEP 2009 |
Highway: | SH 161 | Let Status: | Actual |
Project ID: | NH 2010(039) | CSJ: | 2964-01-041 |
Description: | BRIDGE REPAIR | Handling Code: |
|
Limits From: | AT WALNUT HILL LANE | Fund Cat: | 1 |
Limits To: | . | Estimate: | $661,132 |
Length: | 0.9 Miles | Actual: | $597,056 |
Back... |
Totals for 2964-01-041 | ||
Length: | 0.9 Miles | ||
Estimate: | $661,132 | ||
Actual: | $597,056 | ||
CCSJ: 2964-01-042 | |||
District: | Dallas | Let Date: | JUN 2010 |
Highway: | SH 161 | Let Status: | Actual |
Project ID: | NH 2010(895) | CSJ: | 2964-01-042 |
Description: | REFURBISH SMALL SIGNS | Handling Code: |
|
Limits From: | SH 183 | Fund Cat: | 1 |
Limits To: | IH 635 | Estimate: | $112,392 |
Length: | 3.4 Miles | Actual: | $71,713 |
Back... |
Totals for 2964-01-042 | ||
Length: | 3.4 Miles | ||
Estimate: | $112,392 | ||
Actual: | $71,713 | ||
CCSJ: 2964-01-043 | |||
District: | Dallas | Let Date: | AUG 2010 |
Highway: | SH 161 | Let Status: | Actual |
Project ID: | STP 2010(499)MM | CSJ: | 2964-01-043 |
Description: | COG CORRIDOR PEAK PRICING BEFORE AND AFTER SURVEY; ANALYZE | Handling Code: |
XX |
Limits From: | IH 20 | Fund Cat: | 7 |
Limits To: | SH 183 | Estimate: | $1,241,668 |
Length: | 25.4 Miles | Actual: | $1,241,668 |
Back... |
Totals for 2964-01-043 | ||
Length: | 25.4 Miles | ||
Estimate: | $1,241,668 | ||
Actual: | $1,241,668 |
|
|