Letting Schedule for Dallas District (FY 2010)

 
 
Last Update: Tuesday, November 2, 2010
Dallas District (FY 2010)
Collin | Dallas | Denton | Ellis | Kaufman | Navarro | Rockwall

Collin County

CCSJ Highway Let Status Letting
Date
Contract
Cost
Fund
Cat
Description
0047-04-021 SH 5 Actual NOV 2009 $180,942 8 ADD NB AND SB LEFT TURN LANES
0047-05-043 SH 5 Actual AUG 2010 $6,209,528 1 REPLACE BRIDGE AND APPROACHES
0047-06-144 US 75 Actual JUL 2010 $508,606 10 EXTEND EXISTING ITS NETWORK
0047-14-065 US 75 Actual MAY 2010 $24,888,311 10 RECONSTRUCT AND WIDEN FROM 4 TO 8 LANES WITH 3 LANE
0091-05-058 SH 289 Actual APR 2010 $134,403 10 LANDSCAPE DEVELOPMENT TO INCLUDE TREE PLANTING
0135-04-028 US 380 Actual SEP 2009 $19,981,329 10 WIDEN EXISTING RURAL 2 LANE HIGHWAY TO 4 LANE DIVIDED
0135-05-023 US 380 Actual JUL 2010 $16,564,930 10 RECONSTRUCT EXISTING 2 LANES TO 4 LANES DIVIDED
0387-05-019 FM 982 Actual SEP 2009 $4,887,963 1 RECONSTRUCT RURAL 2 LANE HIGHWAY TO 2 LANE URBAN WITH
0619-03-048 FM 544 Actual APR 2010 $858,870 11 INTERSECTION IMPROVEMENTS
0918-24-040 VA Actual NOV 2009 $2,099,994 9 CONSTRUCT 10 FOOT WIDE CONCRETE WALKWAY
0918-24-119 VA Actual DEC 2009 $2,132,269 7 OHIO TO RASOR PKWY: WIDEN 2 TO 4 LN DIVIDED URBAN;
0918-24-151 VA Actual SEP 2009 $1,481,250 5 CONSTRUCT 709 SPACE PARK - AND - RIDE STATION IN THE RICHARDSON /
0918-24-163 VA Actual AUG 2010 $196,000 7 CITYWIDE SIGNAL DATA COLLECTION FOR SIGNAL RETIMING
0918-24-164 VA Actual MAR 2010 $515,276 1 FULL DEPTH REPAIR OF CONCRETE PAVEMENT
1012-02-023 FM 545 Actual AUG 2010 $1,874,000 1 REPLACE BRIDGE
1013-01-024 FM 546 Actual MAY 2010 $2,609,837 10 CONSTRUCT 2 LANE ROADWAY ON NEW ALIGNMENT
1013-01-025 FM 546 Actual AUG 2010 $3,276,548 1 RECONSTRUCT EXISTING 6 LANE UNDIVIDED URBAN TO 4 LANE
1013-01-029 FM 546 Actual JUL 2010 $623,555 8 INSTALL CENTERLINE RUMBLE STRIPS

Dallas County

CCSJ Highway Let Status Letting
Date
Contract
Cost
Fund
Cat
Description
0008-08-068 SH 180 Actual OCT 2009 $24,996 1 REPLACE DAMAGED SAFETY BARRIER AND REPLACE HEADWALL
0009-11-219 IH 30 Actual MAY 2010 $828,000 1 UPGRADE TRAFFIC SIGNAL HARDWARE AT 2 INTERSECTIONS ON IH 30
0009-11-220 IH 30 Actual AUG 2010 $2,559,068 10 CONSTRUCT PERMANENT CONTRAFLOW HOV LANES
0047-07-213 US 75 Actual OCT 2009 $112,294 7 INTERSECTION IMPROVEMENTS - DUAL RIGHTS NB TO EB_AND
0047-07-217 US 75 Actual JUL 2010 $821,488 10 LANDSCAPE DEVELOPMENT INCLUDING SOIL AMENDMENTS
0092-02-116 IH 45 Actual AUG 2010 $3,832,239 10 UPGRADE INTERCHANGE FOR EXPANDED MULTIMODAL TRAFFIC
0094-03-105 SH 183 Actual AUG 2010 $7,111,157 10 CONSTRUCT EASTBOUND FRONTAGE ROAD
0095-13-029 IH 20 Actual JUL 2010 $1,250,269 1 FULL DEPTH PAVEMENT REPAIR
0196-07-021 SP 366 Actual SEP 2009 $618,646 7 INTERSECTION IMPROVEMENTS
0261-02-065 US 67 Actual SEP 2009 $3,894,738 10 PROVIDE AUXILIARY LANE NB AND SB
0261-03-053 US 67 Actual AUG 2010 $3,685,288 1 CONSTRUCT NB AUXILIARY LANE, WIDEN NBML BRIDGE, CHANNEL WORK
0261-03-059 US 67 Actual MAY 2010 $773,000 1 UPGRADE TRAFFIC SINGAL HARDWARE AT 2 INTERSECTIONS ON US 67
0261-03-060 US 67 Actual JUL 2010 $126,344 10 LANDSCAPE DEVELOPMENT TO INCLUDE TREE PLANTING
0353-04-088 SP 348 Actual APR 2010 $7,883,747 10 PROVIDE CONSTRUCTION OF GRADE SEPARATION
0918-00-152 VA Actual APR 2010 $1,040,000 7 NCTCOG - - REGIONAL BICYCLE AND PEDESTRIAN /
0918-00-154 VA Actual MAY 2010 $549,207 1 INSTALL UNINTERRUPTED POWER SUPPLY AT SIGNALIZED
0918-00-155 VA Actual OCT 2009 $225,700 7 TRUCK LANE RESETRICTION SIGNING WITHIN MPA BOUNDARY
0918-00-156 VA Actual SEP 2009 $690,175 1 ASBESTOS ABATEMENT ON BRIDGES IN ADVANCE OF OTHER
0918-00-157 VA Actual OCT 2009 $1,208,758 1 NON - SITE SPECIFIC TRAFFIC SIGNAL INSTALLATION
0918-00-158 VA Actual MAR 2010 $765,741 1 NON - SITE SPECIFIC SIGN REPLACEMENT AND REFURBISHING
0918-00-159 VA Actual AUG 2010 $1,986,666 7 TRAVEL SURVEY AND DATA COLLECTION EFFORT FOR PROJECTS IN MPO
0918-00-167 VA Actual AUG 2010 $3,369,962 7 PROVIDE ASSISTANCE TO STRANDED MOTORISTS OR NON INJURY
0918-45-354 VA Actual MAY 2010 $5,575,149 9 SANTA FE TRESTLE HIKE AND BIKE TRAIL
0918-45-366 CS Actual SEP 2009 $3,268,012 7 WIDEN 2 - LANE FACILITY TO 4 - LANE DIVIDED FACILITY
0918-45-368 CS Actual APR 2010 $737,213 7 WIDEN 4 - LANE FACILITY TO 5 - LANE FACILITY
0918-45-533 VA Actual NOV 2009 $635,540 9 SCENIC BEAUTIFICATION PROJECT TO PROVIDE STREET FURNITURE
0918-45-541 CS Actual JUL 2010 $866,143 5 ONE OFF SYSTEM INTERSECTION IMPROVEMENT
0918-45-587 VA Actual FEB 2010 $809,298 5 CONSTRUCT TRAIL EXTENSION TO EXISTING KATY TRAIL WITH
0918-45-640 VA Actual FEB 2010 $1,549,413 9 CONSTRUCT PEDESTRIAN BRIDGE OVER IH635 (LBJ) TO DART STATION
0918-45-642 VA Actual MAY 2010 $429,037 9 PEDESTRIAN / BICYCLE LINK BETWEEN 2 TRAILS
0918-45-758 CS Actual DEC 2009 $895,339 6 REPLACE BRIDGE AND APPROACHES
0918-45-760 CS Actual AUG 2010 $681,031 6 REPLACE BRIDGE AND APPROACHES
0918-45-763 VA Actual FEB 2010 $268,100 7 INTERSECTION IMPROVEMENTS
0918-45-772 VA Actual FEB 2010 $85,000 5 ITS ARCHITECTURE DEVELOPMENT
0918-45-774 VA Actual DEC 2009 $2,377,559 10 PEDESTRIAN / BICYCLE LINK FOR TRAIL ALONG COTTONWOOD CREEK
0918-45-799 VA Actual MAR 2010 $575,891 7 CBD SIGNAGE & WAYFINDING
0918-45-849 CS Actual FEB 2010 $145,000 7 INSTALL ITS / TRAIN DETECTION
0918-45-857 VA Actual AUG 2010 $714,000 7 UPGRADE TRINITY RAILWAY EXPRESS (TRE) CROSSINGS; INSTALL
0918-45-859 VA Actual MAY 2010 $18,468,139 5 NORTHWEST CORRIDOR SEGMENT FROM BACHMAN STATION IN DALLAS
0918-45-860 VA Actual APR 2010 $5,200,000 5 DART - TRE TRAIN SET - PHASE 2; PURCHASE 1 ADDITIONAL
0918-45-861 VA Actual JUL 2010 $8,403,345 9 MCKINNEY TROLLEY PHASE 2 - CONSTRUCT EXTENTION OF TROLLEY
0918-45-881 VA Actual AUG 2010 $609,208 1 REFURBISH BRIDGE PROTECTION ASSEMBLY SIGNS
0918-45-891 VA Actual MAY 2010 $5,000,000 7 EXPEDITE 408 PERMITS
0918-45-894 VA Actual AUG 2010 $19,276,725 5 TRINITY RAILWAY EXPRESS DOUBLE TRACK AND GRADE SEPARATIONS;
1047-02-046 FM 1382 Actual DEC 2009 $86,000 7 TRAFFIC SIGNAL IMPROVEMENT
1047-02-047 FM 1382 Actual JUN 2010 $321,973 1 REFURBISH EXISTING AND INSTALL NEW CONTINUOUS ILLUMINATION
1068-04-140 IH 30 Actual AUG 2010 $138,137 5 INSTALLATION OF 2 DYNAMIC MESSAGE SIGNS
1068-04-150 IH 30 Actual NOV 2009 $76,542 5 INSTALL COMMUNICATIONS EQUIPMENT AT MAJOR INTERSECTIONS ON
1068-04-151 IH 30 Actual FEB 2010 $592,144 1 ACP OVERLAY OF EXISTING HIGHWAY AND LANDSCAPING
2374-02-124 IH 635 Actual SEP 2009 $7,718,650 10 CONSTRUCT NB FRONTAGE ROAD IN CITY OF GARLAND
2374-02-131 IH 635 Actual MAR 2010 $209,951 1 REMOVE AND SEAL PAVEMENT MARKINGS ON SOUTHBOUND MAINLANES
2374-02-132 IH 635 Actual AUG 2010 $60,998 5 UPGRADE EXISTING ISDN TO A WIRELESS ITS SYSTEM
2374-03-075 IH 20 Actual JUL 2010 $195,000 1 INSTALL CTB IN THE MEDIAN
2374-04-064 IH 20 Actual JUN 2010 $2,051,798 10 INTERSECTION IMPROVEMENTS ADD RIGHT AND LEFT TURN LANES
2374-04-068 IH 20 Actual DEC 2009 $278,380 10 LANDSCAPE DEVELOPMENT TO INCLUDE TREES, SHRUBS, IRRIGATION
2964-01-041 SH 161 Actual SEP 2009 $597,056 1 BRIDGE REPAIR
2964-01-042 SH 161 Actual JUN 2010 $71,713 1 REFURBISH SMALL SIGNS
2964-01-043 SH 161 Actual AUG 2010 $1,241,668 7 COG CORRIDOR PEAK PRICING BEFORE AND AFTER SURVEY; ANALYZE

Denton County

CCSJ Highway Let Status Letting
Date
Contract
Cost
Fund
Cat
Description
0195-03-073 IH 35E Actual JUN 2010 $195,605 1 REFURBISHING SAFETY LIGHTING
0364-03-092 BS 121H Actual DEC 2009 $216,186 5 INTERSECTION IMPROVEMENTS TO PROVIDE LONGER NB LEFT TURN BAY
0364-03-093 BS 121H Actual DEC 2009 $193,465 5 INSTALL VEHICLE DETECTORS AT KEY INTERSECTION AND RETIME
0718-01-049 FM 156 Actual JUL 2010 $3,156,596 1 ADD 10' SHOULDERS AND REHAB
0816-02-066 FM 455 Actual APR 2010 $3,057,791 8 BASE REPAIR
0918-46-054 CR Actual OCT 2009 $715,915 6 REPLACE EXISTING BRIDGE AND APPROACHES
0918-46-201 CR Actual JUL 2010 $1,329,151 6 REPLACE BRIDGE AND APPROACHES
0918-46-202 CR Actual JUL 2010 $539,035 6 REPLACE BRIDGE AND APPROACHES
0918-46-218 CR Actual JUL 2010 $186,459 6 REPLACE BRIDGE AND APPROACHES
0918-46-223 CS Actual JUL 2010 $318,858 8 CONSTRUCT SIDEWALKS AND CROSSWALKS AT VARIOUS SCHOOLS
0918-46-242 CS Actual AUG 2010 $190,000 7 INSTALL DUAL GATES AND ADD PAVEMENT MARKINGS
1567-01-029 FM 720 Actual JUL 2010 $54,321,264 ROW WIDEN TWO LANE RURAL ROADWAY TO SIX LANE DIVIDED URBAN
1950-01-026 FM 407 Actual JAN 2010 $5,419,912 10 WIDEN 2 LANE RURAL TO 4 LANE DIVIDED URBAN
2980-01-011 FM 2934 Actual AUG 2010 $277,725 10 LANDSCAPE DEVELOPMENT INCLUDING TREES AND SHRUBS

Ellis County

CCSJ Highway Let Status Letting
Date
Contract
Cost
Fund
Cat
Description
0048-08-044 IH 35E Actual JUL 2010 $21,720,233 1 REHABILITATE FREEWAY MAINLANES
0092-03-018 IH 45 Actual NOV 2009 $5,812,694 1 SEAL COAT FRONTAGE ROADS
0172-08-050 US 287 Actual OCT 2009 $34,654,760 10 WIDEN 2 - LANE UNDIVIDED HIGHWAY TO 4 - LANE DIVIDED HIGHWAY
0596-04-040 FM 878 Actual JUN 2010 $6,169,000 8 PROVIDE ADDITIONAL PAVED SURFACE WIDTH - ADD 3 FOOT PAVED
1048-02-031 FM 660 Actual DEC 2009 $366,445 1 REPLACE BRIDGE AND APPROACHES
1159-01-024 FM 875 Actual JUN 2010 $5,134,957 8 PROVIDE ADDITIONAL PAVED SURFACE WIDTH - ADD 3 FOOT PAVED
1159-02-033 FM 879 Actual AUG 2010 $129,809 1 INSTALL CENTERLINE RUMBLE STRIPS
1317-03-022 FM 1722 Actual JUN 2010 $3,167,465 8 PROVIDE ADDITIONAL PAVED SURFACE WIDTH - ADD 3 FOOT PAVED

Kaufman County

CCSJ Highway Let Status Letting
Date
Contract
Cost
Fund
Cat
Description
0095-03-079 US 80 Actual JAN 2010 $10,820,882 12 RECONSTRUCT INTERCHANGE AND FRONTAGE ROADS
0751-01-034 FM 148 Actual AUG 2010 $9,184,740 6 REPLACE BRIDGE AND APPROACHES
0751-01-039 FM 148 Actual DEC 2009 $1,967,978 1 PROVIDE ADDITIONAL PAVED SURFACE WIDTH AND REHABILITATE
1217-02-014 FM 987 Actual APR 2010 $4,219,330 1 PROVIDE ADDITIONAL PAVED SURFACE WIDTH AND REHABILITATE

Navarro County

CCSJ Highway Let Status Letting
Date
Contract
Cost
Fund
Cat
Description
0162-04-047 SH 31 Actual AUG 2010 $9,138,953 1 UPGRADE DRAINAGE, REPAIR PAVEMENT AND MEET ADA STANDARDS
0162-04-051 SH 31 Actual OCT 2009 $856,467 6 REPLACE BRIDGE
0162-08-015 FM 55 Actual JUL 2010 $867,688 8 PROVIDE ADDITIONAL PAVED SURFACE WIDTH
0918-18-111 CS Actual OCT 2009 $241,096 8 CONSTRUCT SIDEWALKS, CROSSWALKS, SCHOOL ZONE SIGNS WITH
0995-01-023 FM 637 Actual AUG 2010 $776,254 8 MODERNIZE BRIDGE RAIL & APPROACH GUARDRAIL; SAFETY TREAT

Rockwall County

CCSJ Highway Let Status Letting
Date
Contract
Cost
Fund
Cat
Description
0009-12-079 IH 30 Actual NOV 2009 $3,672,487 1 SEAL COAT FRONTAGE ROADS
3148-01-005 FM 3097 Actual JUL 2010 $688,710 1 BASE REPAIR, LEVEL UP AND OVERLAY


Let Status Definition
Tentative Estimated letting date for this project
Approved Project has administrative approval to be let
Actual Project was let to contract