Letting Schedule for Dallas District (FY 2010)
Letting Schedule for Dallas District (FY 2010) | ||||
Last Update: Tuesday, November 2, 2010 |
Dallas District (FY 2010) |
Collin | Dallas | Denton | Ellis | Kaufman | Navarro | Rockwall | ||||||
Collin County | ||||||
CCSJ | Highway | Let Status | Letting Date |
Contract Cost |
Fund Cat |
Description |
---|---|---|---|---|---|---|
0047-04-021 | SH 5 | Actual | NOV 2009 | $180,942 | 8 | ADD NB AND SB LEFT TURN LANES |
0047-05-043 | SH 5 | Actual | AUG 2010 | $6,209,528 | 1 | REPLACE BRIDGE AND APPROACHES |
0047-06-144 | US 75 | Actual | JUL 2010 | $508,606 | 10 | EXTEND EXISTING ITS NETWORK |
0047-14-065 | US 75 | Actual | MAY 2010 | $24,888,311 | 10 | RECONSTRUCT AND WIDEN FROM 4 TO 8 LANES WITH 3 LANE |
0091-05-058 | SH 289 | Actual | APR 2010 | $134,403 | 10 | LANDSCAPE DEVELOPMENT TO INCLUDE TREE PLANTING |
0135-04-028 | US 380 | Actual | SEP 2009 | $19,981,329 | 10 | WIDEN EXISTING RURAL 2 LANE HIGHWAY TO 4 LANE DIVIDED |
0135-05-023 | US 380 | Actual | JUL 2010 | $16,564,930 | 10 | RECONSTRUCT EXISTING 2 LANES TO 4 LANES DIVIDED |
0387-05-019 | FM 982 | Actual | SEP 2009 | $4,887,963 | 1 | RECONSTRUCT RURAL 2 LANE HIGHWAY TO 2 LANE URBAN WITH |
0619-03-048 | FM 544 | Actual | APR 2010 | $858,870 | 11 | INTERSECTION IMPROVEMENTS |
0918-24-040 | VA | Actual | NOV 2009 | $2,099,994 | 9 | CONSTRUCT 10 FOOT WIDE CONCRETE WALKWAY |
0918-24-119 | VA | Actual | DEC 2009 | $2,132,269 | 7 | OHIO TO RASOR PKWY: WIDEN 2 TO 4 LN DIVIDED URBAN; |
0918-24-151 | VA | Actual | SEP 2009 | $1,481,250 | 5 | CONSTRUCT 709 SPACE PARK - AND - RIDE STATION IN THE RICHARDSON / |
0918-24-163 | VA | Actual | AUG 2010 | $196,000 | 7 | CITYWIDE SIGNAL DATA COLLECTION FOR SIGNAL RETIMING |
0918-24-164 | VA | Actual | MAR 2010 | $515,276 | 1 | FULL DEPTH REPAIR OF CONCRETE PAVEMENT |
1012-02-023 | FM 545 | Actual | AUG 2010 | $1,874,000 | 1 | REPLACE BRIDGE |
1013-01-024 | FM 546 | Actual | MAY 2010 | $2,609,837 | 10 | CONSTRUCT 2 LANE ROADWAY ON NEW ALIGNMENT |
1013-01-025 | FM 546 | Actual | AUG 2010 | $3,276,548 | 1 | RECONSTRUCT EXISTING 6 LANE UNDIVIDED URBAN TO 4 LANE |
1013-01-029 | FM 546 | Actual | JUL 2010 | $623,555 | 8 | INSTALL CENTERLINE RUMBLE STRIPS |
Dallas County | ||||||
CCSJ | Highway | Let Status | Letting Date |
Contract Cost |
Fund Cat |
Description |
0008-08-068 | SH 180 | Actual | OCT 2009 | $24,996 | 1 | REPLACE DAMAGED SAFETY BARRIER AND REPLACE HEADWALL |
0009-11-219 | IH 30 | Actual | MAY 2010 | $828,000 | 1 | UPGRADE TRAFFIC SIGNAL HARDWARE AT 2 INTERSECTIONS ON IH 30 |
0009-11-220 | IH 30 | Actual | AUG 2010 | $2,559,068 | 10 | CONSTRUCT PERMANENT CONTRAFLOW HOV LANES |
0047-07-213 | US 75 | Actual | OCT 2009 | $112,294 | 7 | INTERSECTION IMPROVEMENTS - DUAL RIGHTS NB TO EB_AND |
0047-07-217 | US 75 | Actual | JUL 2010 | $821,488 | 10 | LANDSCAPE DEVELOPMENT INCLUDING SOIL AMENDMENTS |
0092-02-116 | IH 45 | Actual | AUG 2010 | $3,832,239 | 10 | UPGRADE INTERCHANGE FOR EXPANDED MULTIMODAL TRAFFIC |
0094-03-105 | SH 183 | Actual | AUG 2010 | $7,111,157 | 10 | CONSTRUCT EASTBOUND FRONTAGE ROAD |
0095-13-029 | IH 20 | Actual | JUL 2010 | $1,250,269 | 1 | FULL DEPTH PAVEMENT REPAIR |
0196-07-021 | SP 366 | Actual | SEP 2009 | $618,646 | 7 | INTERSECTION IMPROVEMENTS |
0261-02-065 | US 67 | Actual | SEP 2009 | $3,894,738 | 10 | PROVIDE AUXILIARY LANE NB AND SB |
0261-03-053 | US 67 | Actual | AUG 2010 | $3,685,288 | 1 | CONSTRUCT NB AUXILIARY LANE, WIDEN NBML BRIDGE, CHANNEL WORK |
0261-03-059 | US 67 | Actual | MAY 2010 | $773,000 | 1 | UPGRADE TRAFFIC SINGAL HARDWARE AT 2 INTERSECTIONS ON US 67 |
0261-03-060 | US 67 | Actual | JUL 2010 | $126,344 | 10 | LANDSCAPE DEVELOPMENT TO INCLUDE TREE PLANTING |
0353-04-088 | SP 348 | Actual | APR 2010 | $7,883,747 | 10 | PROVIDE CONSTRUCTION OF GRADE SEPARATION |
0918-00-152 | VA | Actual | APR 2010 | $1,040,000 | 7 | NCTCOG - - REGIONAL BICYCLE AND PEDESTRIAN / |
0918-00-154 | VA | Actual | MAY 2010 | $549,207 | 1 | INSTALL UNINTERRUPTED POWER SUPPLY AT SIGNALIZED |
0918-00-155 | VA | Actual | OCT 2009 | $225,700 | 7 | TRUCK LANE RESETRICTION SIGNING WITHIN MPA BOUNDARY |
0918-00-156 | VA | Actual | SEP 2009 | $690,175 | 1 | ASBESTOS ABATEMENT ON BRIDGES IN ADVANCE OF OTHER |
0918-00-157 | VA | Actual | OCT 2009 | $1,208,758 | 1 | NON - SITE SPECIFIC TRAFFIC SIGNAL INSTALLATION |
0918-00-158 | VA | Actual | MAR 2010 | $765,741 | 1 | NON - SITE SPECIFIC SIGN REPLACEMENT AND REFURBISHING |
0918-00-159 | VA | Actual | AUG 2010 | $1,986,666 | 7 | TRAVEL SURVEY AND DATA COLLECTION EFFORT FOR PROJECTS IN MPO |
0918-00-167 | VA | Actual | AUG 2010 | $3,369,962 | 7 | PROVIDE ASSISTANCE TO STRANDED MOTORISTS OR NON INJURY |
0918-45-354 | VA | Actual | MAY 2010 | $5,575,149 | 9 | SANTA FE TRESTLE HIKE AND BIKE TRAIL |
0918-45-366 | CS | Actual | SEP 2009 | $3,268,012 | 7 | WIDEN 2 - LANE FACILITY TO 4 - LANE DIVIDED FACILITY |
0918-45-368 | CS | Actual | APR 2010 | $737,213 | 7 | WIDEN 4 - LANE FACILITY TO 5 - LANE FACILITY |
0918-45-533 | VA | Actual | NOV 2009 | $635,540 | 9 | SCENIC BEAUTIFICATION PROJECT TO PROVIDE STREET FURNITURE |
0918-45-541 | CS | Actual | JUL 2010 | $866,143 | 5 | ONE OFF SYSTEM INTERSECTION IMPROVEMENT |
0918-45-587 | VA | Actual | FEB 2010 | $809,298 | 5 | CONSTRUCT TRAIL EXTENSION TO EXISTING KATY TRAIL WITH |
0918-45-640 | VA | Actual | FEB 2010 | $1,549,413 | 9 | CONSTRUCT PEDESTRIAN BRIDGE OVER IH635 (LBJ) TO DART STATION |
0918-45-642 | VA | Actual | MAY 2010 | $429,037 | 9 | PEDESTRIAN / BICYCLE LINK BETWEEN 2 TRAILS |
0918-45-758 | CS | Actual | DEC 2009 | $895,339 | 6 | REPLACE BRIDGE AND APPROACHES |
0918-45-760 | CS | Actual | AUG 2010 | $681,031 | 6 | REPLACE BRIDGE AND APPROACHES |
0918-45-763 | VA | Actual | FEB 2010 | $268,100 | 7 | INTERSECTION IMPROVEMENTS |
0918-45-772 | VA | Actual | FEB 2010 | $85,000 | 5 | ITS ARCHITECTURE DEVELOPMENT |
0918-45-774 | VA | Actual | DEC 2009 | $2,377,559 | 10 | PEDESTRIAN / BICYCLE LINK FOR TRAIL ALONG COTTONWOOD CREEK |
0918-45-799 | VA | Actual | MAR 2010 | $575,891 | 7 | CBD SIGNAGE & WAYFINDING |
0918-45-849 | CS | Actual | FEB 2010 | $145,000 | 7 | INSTALL ITS / TRAIN DETECTION |
0918-45-857 | VA | Actual | AUG 2010 | $714,000 | 7 | UPGRADE TRINITY RAILWAY EXPRESS (TRE) CROSSINGS; INSTALL |
0918-45-859 | VA | Actual | MAY 2010 | $18,468,139 | 5 | NORTHWEST CORRIDOR SEGMENT FROM BACHMAN STATION IN DALLAS |
0918-45-860 | VA | Actual | APR 2010 | $5,200,000 | 5 | DART - TRE TRAIN SET - PHASE 2; PURCHASE 1 ADDITIONAL |
0918-45-861 | VA | Actual | JUL 2010 | $8,403,345 | 9 | MCKINNEY TROLLEY PHASE 2 - CONSTRUCT EXTENTION OF TROLLEY |
0918-45-881 | VA | Actual | AUG 2010 | $609,208 | 1 | REFURBISH BRIDGE PROTECTION ASSEMBLY SIGNS |
0918-45-891 | VA | Actual | MAY 2010 | $5,000,000 | 7 | EXPEDITE 408 PERMITS |
0918-45-894 | VA | Actual | AUG 2010 | $19,276,725 | 5 | TRINITY RAILWAY EXPRESS DOUBLE TRACK AND GRADE SEPARATIONS; |
1047-02-046 | FM 1382 | Actual | DEC 2009 | $86,000 | 7 | TRAFFIC SIGNAL IMPROVEMENT |
1047-02-047 | FM 1382 | Actual | JUN 2010 | $321,973 | 1 | REFURBISH EXISTING AND INSTALL NEW CONTINUOUS ILLUMINATION |
1068-04-140 | IH 30 | Actual | AUG 2010 | $138,137 | 5 | INSTALLATION OF 2 DYNAMIC MESSAGE SIGNS |
1068-04-150 | IH 30 | Actual | NOV 2009 | $76,542 | 5 | INSTALL COMMUNICATIONS EQUIPMENT AT MAJOR INTERSECTIONS ON |
1068-04-151 | IH 30 | Actual | FEB 2010 | $592,144 | 1 | ACP OVERLAY OF EXISTING HIGHWAY AND LANDSCAPING |
2374-02-124 | IH 635 | Actual | SEP 2009 | $7,718,650 | 10 | CONSTRUCT NB FRONTAGE ROAD IN CITY OF GARLAND |
2374-02-131 | IH 635 | Actual | MAR 2010 | $209,951 | 1 | REMOVE AND SEAL PAVEMENT MARKINGS ON SOUTHBOUND MAINLANES |
2374-02-132 | IH 635 | Actual | AUG 2010 | $60,998 | 5 | UPGRADE EXISTING ISDN TO A WIRELESS ITS SYSTEM |
2374-03-075 | IH 20 | Actual | JUL 2010 | $195,000 | 1 | INSTALL CTB IN THE MEDIAN |
2374-04-064 | IH 20 | Actual | JUN 2010 | $2,051,798 | 10 | INTERSECTION IMPROVEMENTS ADD RIGHT AND LEFT TURN LANES |
2374-04-068 | IH 20 | Actual | DEC 2009 | $278,380 | 10 | LANDSCAPE DEVELOPMENT TO INCLUDE TREES, SHRUBS, IRRIGATION |
2964-01-041 | SH 161 | Actual | SEP 2009 | $597,056 | 1 | BRIDGE REPAIR |
2964-01-042 | SH 161 | Actual | JUN 2010 | $71,713 | 1 | REFURBISH SMALL SIGNS |
2964-01-043 | SH 161 | Actual | AUG 2010 | $1,241,668 | 7 | COG CORRIDOR PEAK PRICING BEFORE AND AFTER SURVEY; ANALYZE |
Denton County | ||||||
CCSJ | Highway | Let Status | Letting Date |
Contract Cost |
Fund Cat |
Description |
0195-03-073 | IH 35E | Actual | JUN 2010 | $195,605 | 1 | REFURBISHING SAFETY LIGHTING |
0364-03-092 | BS 121H | Actual | DEC 2009 | $216,186 | 5 | INTERSECTION IMPROVEMENTS TO PROVIDE LONGER NB LEFT TURN BAY |
0364-03-093 | BS 121H | Actual | DEC 2009 | $193,465 | 5 | INSTALL VEHICLE DETECTORS AT KEY INTERSECTION AND RETIME |
0718-01-049 | FM 156 | Actual | JUL 2010 | $3,156,596 | 1 | ADD 10' SHOULDERS AND REHAB |
0816-02-066 | FM 455 | Actual | APR 2010 | $3,057,791 | 8 | BASE REPAIR |
0918-46-054 | CR | Actual | OCT 2009 | $715,915 | 6 | REPLACE EXISTING BRIDGE AND APPROACHES |
0918-46-201 | CR | Actual | JUL 2010 | $1,329,151 | 6 | REPLACE BRIDGE AND APPROACHES |
0918-46-202 | CR | Actual | JUL 2010 | $539,035 | 6 | REPLACE BRIDGE AND APPROACHES |
0918-46-218 | CR | Actual | JUL 2010 | $186,459 | 6 | REPLACE BRIDGE AND APPROACHES |
0918-46-223 | CS | Actual | JUL 2010 | $318,858 | 8 | CONSTRUCT SIDEWALKS AND CROSSWALKS AT VARIOUS SCHOOLS |
0918-46-242 | CS | Actual | AUG 2010 | $190,000 | 7 | INSTALL DUAL GATES AND ADD PAVEMENT MARKINGS |
1567-01-029 | FM 720 | Actual | JUL 2010 | $54,321,264 | ROW | WIDEN TWO LANE RURAL ROADWAY TO SIX LANE DIVIDED URBAN |
1950-01-026 | FM 407 | Actual | JAN 2010 | $5,419,912 | 10 | WIDEN 2 LANE RURAL TO 4 LANE DIVIDED URBAN |
2980-01-011 | FM 2934 | Actual | AUG 2010 | $277,725 | 10 | LANDSCAPE DEVELOPMENT INCLUDING TREES AND SHRUBS |
Ellis County | ||||||
CCSJ | Highway | Let Status | Letting Date |
Contract Cost |
Fund Cat |
Description |
0048-08-044 | IH 35E | Actual | JUL 2010 | $21,720,233 | 1 | REHABILITATE FREEWAY MAINLANES |
0092-03-018 | IH 45 | Actual | NOV 2009 | $5,812,694 | 1 | SEAL COAT FRONTAGE ROADS |
0172-08-050 | US 287 | Actual | OCT 2009 | $34,654,760 | 10 | WIDEN 2 - LANE UNDIVIDED HIGHWAY TO 4 - LANE DIVIDED HIGHWAY |
0596-04-040 | FM 878 | Actual | JUN 2010 | $6,169,000 | 8 | PROVIDE ADDITIONAL PAVED SURFACE WIDTH - ADD 3 FOOT PAVED |
1048-02-031 | FM 660 | Actual | DEC 2009 | $366,445 | 1 | REPLACE BRIDGE AND APPROACHES |
1159-01-024 | FM 875 | Actual | JUN 2010 | $5,134,957 | 8 | PROVIDE ADDITIONAL PAVED SURFACE WIDTH - ADD 3 FOOT PAVED |
1159-02-033 | FM 879 | Actual | AUG 2010 | $129,809 | 1 | INSTALL CENTERLINE RUMBLE STRIPS |
1317-03-022 | FM 1722 | Actual | JUN 2010 | $3,167,465 | 8 | PROVIDE ADDITIONAL PAVED SURFACE WIDTH - ADD 3 FOOT PAVED |
Kaufman County | ||||||
CCSJ | Highway | Let Status | Letting Date |
Contract Cost |
Fund Cat |
Description |
0095-03-079 | US 80 | Actual | JAN 2010 | $10,820,882 | 12 | RECONSTRUCT INTERCHANGE AND FRONTAGE ROADS |
0751-01-034 | FM 148 | Actual | AUG 2010 | $9,184,740 | 6 | REPLACE BRIDGE AND APPROACHES |
0751-01-039 | FM 148 | Actual | DEC 2009 | $1,967,978 | 1 | PROVIDE ADDITIONAL PAVED SURFACE WIDTH AND REHABILITATE |
1217-02-014 | FM 987 | Actual | APR 2010 | $4,219,330 | 1 | PROVIDE ADDITIONAL PAVED SURFACE WIDTH AND REHABILITATE |
Navarro County | ||||||
CCSJ | Highway | Let Status | Letting Date |
Contract Cost |
Fund Cat |
Description |
0162-04-047 | SH 31 | Actual | AUG 2010 | $9,138,953 | 1 | UPGRADE DRAINAGE, REPAIR PAVEMENT AND MEET ADA STANDARDS |
0162-04-051 | SH 31 | Actual | OCT 2009 | $856,467 | 6 | REPLACE BRIDGE |
0162-08-015 | FM 55 | Actual | JUL 2010 | $867,688 | 8 | PROVIDE ADDITIONAL PAVED SURFACE WIDTH |
0918-18-111 | CS | Actual | OCT 2009 | $241,096 | 8 | CONSTRUCT SIDEWALKS, CROSSWALKS, SCHOOL ZONE SIGNS WITH |
0995-01-023 | FM 637 | Actual | AUG 2010 | $776,254 | 8 | MODERNIZE BRIDGE RAIL & APPROACH GUARDRAIL; SAFETY TREAT |
Rockwall County | ||||||
CCSJ | Highway | Let Status | Letting Date |
Contract Cost |
Fund Cat |
Description |
0009-12-079 | IH 30 | Actual | NOV 2009 | $3,672,487 | 1 | SEAL COAT FRONTAGE ROADS |
3148-01-005 | FM 3097 | Actual | JUL 2010 | $688,710 | 1 | BASE REPAIR, LEVEL UP AND OVERLAY |
|
|