Letting Schedule for March, 2013 (FY 2013)
March, 2013 (FY 2013) | (see Links) |
SEP 2012 | OCT 2012 | NOV 2012 | DEC 2012 | JAN 2013 | FEB 2013 | MAR 2013 | APR 2013 | MAY 2013 | JUN 2013 | JUL 2013 | AUG 2013 | ||||||
CCSJ | County/ District |
Highway | Let Status | Contract Cost |
Fund Cat |
Description |
---|---|---|---|---|---|---|
0228-04-040 | Andrews/ Odessa |
US 385 | Actual | $1,147,567 | 3 | INSTALLING TRAFFIC SIGNALS, ILLUMINATION, SUBGRADE WIDENING, |
0911-38-067 | Angelina/ Lufkin |
CS | Actual | $394,508 | 6 | REPLACE BRIDGE AND APPROACHES |
0913-20-076 | Austin/ Yoakum |
CR | Actual | $273,616 | 6 | REPLACE BRIDGE AND APPROACHES |
0231-03-103 | Bell/ Waco |
US 190 | Actual | $9,587,761 | 11 | WIDEN FROM FOUR TO SIX LANES AND RESURFACE |
0179-02-083 | Brazoria/ Houston |
SH 35 | Actual | $4,815,959 | 1 | SEAL COAT, ACP OVERLAY & PAVEMENT MARKINGS |
0029-03-054 | Caldwell/ Austin |
US 90 | Actual | $3,543,869 | 1 | FULL DEPTH REPAIR, MILL, SEAL & THIN OVERLAY MIXTURE |
0115-02-017 | Caldwell/ Austin |
FM 20 | Actual | $1,097,372 | 1 | FULL DEPTH REPAIR, LEVEL - UP & SEAL |
0047-05-051 | Collin/ Dallas |
SH 5 | Actual | $1,311,304 | 1 | BASE REPAIR AND OVERLAY |
0091-03-024 | Collin/ Dallas |
SH 289 | Actual | $771,988 | 1 | BASE REPAIR, UNDERSEAL AND 2" OVERLAY |
0816-04-044 | Collin/ Dallas |
FM 455 | Actual | $12,399,737 | 3 | WIDEN FACILITY TO 4 LANE URBAN DIVIDED, ULTIMATE 6 LANE |
1973-01-012 | Collin/ Dallas |
FM 1461 | Actual | $1,313,430 | 1 | BASE REPAIR AND LEVEL - UP |
0312-01-072 | Cooke/ Wichita Falls |
FM 51 | Actual | $2,224,040 | 1 | HOT MIX OVERLAY |
0581-01-135 | Dallas/ Dallas |
LP 12 | Actual | $655,042 | 1 | REPAIR SLOPE WITH RETAINING WALL |
0918-00-162 | Dallas/ Dallas |
VA | Actual | $336,140 | 1 | NON - SITE SPECIFIC INSTALLATION OF GUIDE SIGNS (ON - SYSTEM) |
0918-00-165 | Dallas/ Dallas |
VA | Actual | $300,000 | 1 | UPGRADE AND REPAIR ITS EQUIPMENT |
0918-45-843 | Dallas/ Dallas |
CS | Actual | $917,943 | 3 | STREET CLOSURES AT MACON & SUNDAY STREETS; INSTALL FENCING |
1068-04-116 | Dallas/ Dallas |
IH 30 | Actual | 715,273,351 | 10 | WIDEN AND RECONSTRUCT 10 MAINLANES WITH 1 REVERSIBLE HOV / |
1311-01-034 | Denton/ Dallas |
FM 1171 | Actual | $45,721,253 | 3 | WIDEN TWO LANE RURAL TO SIX LANE DIVIDED URBAN HIGHWAY |
0913-17-033 | Dewitt/ Yoakum |
CR | Actual | $487,910 | 6 | REPLACE BRIDGE AND APPROACHES |
0906-00-138 | Ector/ Odessa |
VA | Actual | $269,987 | 11 | PAVEMENT MAKKINGS |
0906-00-139 | Ector/ Odessa |
VA | Actual | $228,116 | 11 | SIGN REPLACEMENTS |
0001-02-058 | El Paso/ El Paso |
SH 20 | Actual | $2,686,629 | 2M | RAPID TRANSIT SYSTEM (RTS) FTR TRANSFER CSJ |
0924-06-398 | El Paso/ El Paso |
VA | Actual | $1,870,766 | 3 | INSTALL SCHOOL ZONE FLASHERS |
0924-06-402 | El Paso/ El Paso |
VA | Actual | $1,416,137 | 3 | INSTALL SCHOOL ZONE FLASHERS |
0596-02-041 | Ellis/ Dallas |
FM 66 | Actual | $2,429,911 | 1 | BASE REPAIR, HMAC OVERLAY, OVERFLOW SLAB RECONSTRUCTION |
0815-08-027 | Ellis/ Dallas |
FM 663 | Actual | $4,728,944 | 3 | WIDEN EXISTING OVERPASS AND APPROACHES |
0918-22-142 | Ellis/ Dallas |
CS | Actual | $804,599 | 6 | REPLACE BRIDGE AND APPROACHES |
0909-38-055 | Falls/ Waco |
CR | Actual | $899,573 | 6 | REPLACE BRIDGE AND APPROACHES |
0912-34-147 | Fort Bend/ Houston |
VA | Actual | $3,130,219 | 5 | WESTPARK TOLLROAD PARK & RIDE |
1258-02-033 | Fort Bend/ Houston |
FM 1093 | Actual | $535,317 | 1 | BASE REPAIR & OVERLAY |
2948-02-011 | Freestone/ Bryan |
FM 1848 | Actual | $687,586 | 6 | REPLACEMENT OF AN EXISTING BRIDGE FACILITY CONSISTING OF |
0728-02-028 | Grayson/ Paris |
FM 120 | Actual | $908,157 | 1 | OVERLAY EXISTING PAVEMENT |
0050-08-086 | Harris/ Houston |
US 290 | Actual | $57,979,155 | 3 | WIDEN TO 8 MAIN LANES WITH 3 REVERSIBLE MANAGED LANES, |
0912-00-381 | Harris/ Houston |
VA | Actual | $1,787,200 | 1 | UPGRADE / RECONSTRUCT TRAFFIC SIGNALS |
0912-72-288 | Harris/ Houston |
VA | Actual | $1,189,354 | 10 | CONSTRUCT ADA CURB RAMPS ALONG IH 45 AND SH 288 IN HARRIS |
0495-10-083 | Harrison/ Atlanta |
IH 20 | Actual | $1,247,096 | 1 | RESURFACE EXISTING INTERSTATE FACILITY |
0805-01-019 | Hays/ Austin |
RM 150 | Actual | $814,226 | 1 | REPAIR & THIN OVERLAY |
0121-02-056 | Hill/ Waco |
SH 22 | Actual | $6,401,417 | 1 | REHABILITATE ROADWAY AND ADD PASSING LANES |
0401-01-022 | Hopkins/ Paris |
SH 154 | Actual | $6,591,502 | 1 | RECONSTRUCT FROM 2 - LANE WITHOUT SHOULDERS TO 2 - LANE WITH |
1092-01-018 | Kaufman/ Dallas |
FM 741 | Actual | $298,103 | 10 | LANDSCAPE DEVELOPMENT TO INCLUDE TREE AND SHRUB PLANTING |
0073-07-059 | Live Oak/ Corpus Christi |
IH 37 | Actual | $713,437 | 1 | MILL AND OVERLAY ENTRANCE / EXIT RAMPS |
0166-07-057 | Madison/ Bryan |
SH 75 | Actual | $1,757,771 | 8 | SAFETY WORK CONSISTING OF STRUCTURES, SUBGRADE WIDENING, |
1188-01-024 | Midland/ Odessa |
FM 868 | Actual | $1,955,093 | 1 | ROADWAY REHABILITION |
0617-01-180 | Nueces/ Corpus Christi |
SH 358 | Actual | $2,878,357 | 1 | MILL AND OVERLAY ROADWAY |
0617-02-063 | Nueces/ Corpus Christi |
PR 22 | Actual | $2,212,952 | 1 | MILL AND OVERLAY ROADWAY |
0355-03-028 | Ochiltree/ Amarillo |
SH 15 | Actual | $5,281,728 | 1 | OVERLAY EXISTING ROADWAY |
0250-01-034 | Palo Pinto/ Fort Worth |
US 281 | Actual | $581,144 | 1 | MILL, BASE REPAIR AND HMAC OVERLAY |
0008-03-104 | Parker/ Fort Worth |
IH 20 | Actual | $2,425,866 | 1 | OVERLAY WB & EB FR |
0957-09-017 | Presidio/ El Paso |
FM 170 | Actual | $3,149,303 | 8 | PROVIDE ADDITIONAL PAVED SURFACE WIDTH |
0304-04-042 | Sabine/ Lufkin |
SH 87 | Actual | $1,937,299 | 8 | PROVIDE ADDITIONAL PAVED SURFACE WIDTH |
0911-29-038 | Sabine/ Lufkin |
CR | Actual | $437,819 | 6 | REPLACE BRIDGE AND APPROACHES |
0053-09-069 | Scurry/ Abilene |
US 84 | Actual | $2,338,232 | 1 | DEEP MILL FILL DR LN, SEAL, OVERLAY |
0910-16-066 | Smith/ Tyler |
CR | Actual | $1,048,289 | 6 | REPLACE BRIDGES AND APPROACHES |
0910-16-112 | Smith/ Tyler |
CR | Actual | $422,633 | 6 | REPLACE BRIDGE AND APPROACHES |
2075-01-053 | Smith/ Tyler |
LP 323 | Actual | $3,794,106 | 1 | RESURFACE ROADWAY |
0902-00-133 | Tarrant/ Fort Worth |
VA | Actual | $815,000 | 1 | NON - SPECIFIC SITE INSTALLATION OF TRAFFIC SIGNALS |
0902-48-759 | Tarrant/ Fort Worth |
VA | Actual | $594,086 | 12 | DESIGN AND CONSTRUCT ITS FIELD DEVICES FOR ARLINGTON |
1978-01-053 | Tarrant/ Fort Worth |
FM 1938 | Actual | $2,154,441 | 1 | WEDGEMILL 6' FROM OUTSIDE LANES, BASE REPAIR, 2" HMAC |
0015-11-062 | Travis/ Austin |
LP 275 | Actual | $1,249,602 | 1 | MILL, SEAL & THIN OVERLAY |
0914-00-322 | Travis/ Austin |
VA | Actual | $865,508 | 1 | FY 2013 NON - SITE SPECIFIC SIGNALS |
0914-00-328 | Travis/ Austin |
VA | Actual | $792,010 | 3 | CONSTRUCT SIDEWALKS |
1200-05-017 | Travis/ Austin |
FM 973 | Actual | $742,733 | 1 | PVMT REPAIR, SEAL & THIN OVERLAY |
1376-02-039 | Travis/ Austin |
FM 1325 | Actual | $2,027,037 | 1 | MILL, SEAL & THIN OVERLAY |
3417-03-019 | Travis/ Austin |
FM 734 | Actual | $118,692 | 3 | ADD EASTBOUND LEFT TURN LANE |
0240-02-030 | Wharton/ Yoakum |
SH 60 | Actual | $2,921,572 | 1 | RESTORE ROADWAY |
1303-01-017 | Wharton/ Yoakum |
FM 1161 | Actual | $2,257,895 | 8 | WIDEN ROADWAY |
0043-09-120 | Wichita/ Wichita Falls |
IH 44 | Actual | $145,604 | 1 | UPGRADE EXISTING DYNAMIC MESSAGE SIGN |
0903-03-096 | Wichita/ Wichita Falls |
CS | Actual | $781,216 | 3 | CONSTRUCT SIDEWALKS, INSTALL SPEED FEEDBACK SIGNS, INSTALL |
0151-04-067 | Williamson/ Austin |
US 183 | Actual | $867,875 | 1 | PAVEMENT REPAIR, UNDERSEAL & OVERLAY |
2690-01-033 | Williamson/ Austin |
FM 971 | Actual | $1,487,610 | 1 | SPOT PAVEMENT REPAIRS AND ONE COURSE SURFACE TREATMENT |
|