Letting Schedule for November, 2012 (FY 2013)
November, 2012 (FY 2013) | (see Links) |
SEP 2012 | OCT 2012 | NOV 2012 | DEC 2012 | JAN 2013 | FEB 2013 | MAR 2013 | APR 2013 | MAY 2013 | JUN 2013 | JUL 2013 | AUG 2013 | ||||||
CCSJ | County/ District |
Highway | Let Status | Contract Cost |
Fund Cat |
Description |
---|---|---|---|---|---|---|
0911-38-066 | Angelina/ Lufkin |
VA | Actual | $1,334,264 | 3 | CONSTRUCT SIDEWALKS AND RAMPS TO IMPROVE PEDESTRIAN ELEMENTS |
1066-01-022 | Bandera/ San Antonio |
PR 37 | Actual | $792,516 | 8 | WIDEN NARROW ROADWAY TO ADD SHOULDERS |
0218-01-088 | Bowie/ Atlanta |
US 59 | Actual | $3,719,264 | 12 | RECONSTRUCT INTERSECTION WITH CONCRETE PAVING |
0128-01-102 | Brown/ Brownwood |
US 377 | Actual | $6,328,264 | 1 | SEAL COAT |
0275-02-069 | Carson/ Amarillo |
IH 40 | Actual | $5,177,809 | 12 | REHAB EXISTING ROADWAY |
0816-04-048 | Collin/ Dallas |
FM 455 | Actual | $2,971,235 | 1 | SHOULDER WIDENING, BASE REPAIR, UNDERSEAL AND LEVEL - UP |
0035-03-045 | Concho/ San Angelo |
US 83 | Actual | $4,368,338 | 1 | SEAL COAT |
0140-10-031 | Crockett/ San Angelo |
IH 10 | Actual | $1,115,425 | 1 | MICROSURFACING |
0081-03-052 | Denton/ Dallas |
US 377 | Actual | $4,479,767 | 1 | BASE REPAIR AND OVERLAY |
0134-09-034 | Denton/ Dallas |
US 380 | Actual | $15,088,446 | 12 | RECONSTRUCT AND WIDEN FROM FOUR LANES DIVIDED TO SIX LANES |
0924-00-078 | El Paso/ El Paso |
VA | Actual | $536,822 | 1 | BRIDGE MAINTENANCE PROGRAM |
0924-06-240 | El Paso/ El Paso |
CS | Actual | $1,400,472 | 3 | CONSTRUCT BICYCLE PATHS |
0924-06-389 | El Paso/ El Paso |
VA | Actual | $2,069,631 | 8 | CONSTRUCT SIDEWALKS, INSTALL CROSSWALKS, INSTALL SCHOOL ZONE |
3048-01-014 | Fort Bend/ Houston |
FM 2977 | Actual | $1,473,222 | 1 | INSTALL LEFT TURN LANES |
0017-15-021 | Frio/ San Antonio |
BI 35-E | Actual | $161,457 | 1 | SEAL COAT AND PAVEMENT MARKINGS |
1911-01-021 | Galveston/ Houston |
FM 2004 | Actual | $189,987 | 1 | INSTALL TURN LANES |
0315-02-044 | Grimes/ Bryan |
SH 90 | Actual | $4,287,391 | 1 | REHABILITATE EXISTING ROAD CONSISTING OF SUBGRADE WIDENING, |
0025-03-095 | Guadalupe/ San Antonio |
IH 10 | Actual | $685,062 | 1 | SEAL COAT AND PAVEMENT MARKINGS (EB FRONTAGE RDS) |
0027-13-190 | Harris/ Houston |
US 59 | Actual | $18,777,770 | 1 | RECONSTRUCT FRONTAGE ROADS AND INTERSECTIONS |
0389-13-056 | Harris/ Houston |
SH 146 | Actual | $6,585,238 | 12 | CONSTRUCT DIRECT CONNECTOR (RAMP C DC EB TO NB) |
0500-03-042 | Harris/ Houston |
IH 45 | Actual | $93,288,285 | ROW | WIDEN AND RECONSTRUCT TO 10 MAIN LANES, TWO 3 - LANE FRONTAGE |
0912-71-001 | Harris/ Houston |
VA | Actual | $6,250,000 | 12 | PRELIMINARY ENGINEERING / ENVIRONMENTAL ANALYSIS FOR URBAN |
0912-71-895 | Harris/ Houston |
CR | Actual | $7,785,991 | ROW | CONSTRUCT 4 LANE CONCRETE DIVIDED SECTION WITH CURB AND |
0912-72-004 | Harris/ Houston |
CS | Actual | $2,483,337 | 10 | LANDSCAPE (CITY OF HOUSTON SECTION 115 EARMARK) |
0100-05-073 | Karnes/ Corpus Christi |
US 181 | Actual | $1,783,537 | 11 | INTERSECTION IMPROVEMENTS |
0142-08-006 | Kerr/ San Antonio |
FM 394 | Actual | $727,371 | 1 | REHAB & WIDEN NARROW ROADWAY TO ADD SHOULDERS |
0052-13-004 | Lamb/ Lubbock |
LP 430 | Actual | $10,295,049 | 11 | FY 2013 SEAL COAT |
0116-01-028 | Lee/ Austin |
SH 21 | Actual | $7,525,070 | 1 | ADD SHLDRS., PAV REPAIR, SEAL COAT |
0762-01-029 | Liberty/ Beaumont |
FM 686 | Actual | $824,500 | 1 | RESTORE EXISTING ROADWAY |
0762-01-031 | Liberty/ Beaumont |
FM 1960 | Actual | $2,805,410 | 12 | ADD CONTINUOUS LEFT TURN LANE AND INSTALL PASSING LANES |
0905-00-070 | Lubbock/ Lubbock |
VA | Actual | $1,488,393 | 10 | CONSTRUCTION OF ADA CURB RAMPS IN COCHRAN, HOCKLEY, LAMB AND |
0915-51-009 | McMullen/ San Antonio |
PW | Actual | $308,546 | 10 | SURFACE ENTRANCE EXISTING ROAD AND CONSTRUCT PARKING LOTS |
1352-01-019 | Montague/ Wichita Falls |
FM 677 | Actual | $3,104,661 | 1 | PROVIDE ADDITIONAL PAVED SURFACE WIDTH |
0912-37-206 | Montgomery/ Houston |
CR | Actual | $561,551 | 6 | REPLACE BRIDGE AND APPROACHES (NBI# 12170AA1352055) |
0911-08-043 | Nacogdoches/ Lufkin |
VA | Actual | $201,935 | 3 | ADDITION OF TWO LEFT TURN LANES |
0006-02-108 | Nolan/ Abilene |
IH 20 | Actual | $3,445,320 | 1 | SEAL COAT |
0904-11-053 | Randall/ Amarillo |
CS | Actual | $1,400,000 | 3 | REHAB EXISTING ROADWAY |
0304-02-038 | Sabine/ Lufkin |
SH 87 | Actual | $3,199,991 | 1 | PROVIDE ADDITIONAL PAVED SURFACE WIDTH & TURN LANE AT FM 276 |
0911-29-035 | Sabine/ Lufkin |
CR | Actual | $379,352 | 6 | REPLACE BRIDGE AND APPROACHES |
0064-01-065 | Shelby/ Lufkin |
SH 87 | Actual | $9,165,321 | 1 | RESURFACE WITH SEAL COAT |
0902-48-557 | Tarrant/ Fort Worth |
VA | Actual | $267,997 | 3 | TRINITY RIVER VISIONS CORRIDOR IMPROVEMENTS - TCSP FUNDS |
1603-03-034 | Tarrant/ Fort Worth |
FM 1709 | Actual | $1,320,757 | 3 | SOUTHLAKE BOULEVARD SIDEWALK INSTALLATION AND IMPROVEMENTS, |
0095-06-066 | Van Zandt/ Tyler |
US 80 | Actual | $8,515,841 | 1 | SEAL COAT & PAVEMENT MARKINGS |
3445-01-007 | Waller/ Houston |
FM 3346 | Actual | $798,979 | 1 | ACP OVERLAY |
0004-03-047 | Ward/ Odessa |
BI 20-D | Actual | $7,719,463 | 1 | SEAL COAT |
0761-05-012 | Wheeler/ Childress |
FM 592 | Actual | $4,784,483 | 1 | WIDENING OF NON - FREEWAY FACILITY |
0903-00-070 | Wichita/ Wichita Falls |
VA | Actual | $107,756 | 1 | BRIDGE MAINTENANCE AND REPAIR |
2621-03-009 | Willacy/ Pharr |
FM 2629 | Actual | $4,095,376 | 1 | SEAL COAT |
1606-02-018 | Wise/ Fort Worth |
FM 2123 | Actual | $4,939,000 | 8 | PROVIDE ADDITIONAL PAVED SURFACE WIDTH, PROPOSED 2 - 12'LANES |
0038-02-031 | Zapata/ Pharr |
US 83 | Actual | $18,535,903 | 1 | REHAB & WIDEN PAVEMENT (SUPER 2) |
|