Detail Letting Schedule for El Paso County (FY 2001)
![]() |
![]() |
![]() |
![]() |
![]() |
Detail Letting Schedule for El Paso County (FY 2001) | ||||
Last Update: Friday, August 31, 2001 | ||||
Updated from Design & Construction Information System (DCIS) on: August 31, 2001 |
El Paso County (FY 2001) |
CCSJ: 0001-04-077 | |||
District: | El Paso | Let Date: | APR 2001 |
Highway: | US 62 | Let Status: | Actual |
Project ID: | CPM 1-4-77 | CSJ: | 0001-04-077 |
Description: | OVERLAY | Handling Code: |
|
Limits From: | RM 18+0.704 | Fund Cat: | 7 |
Limits To: | RM 23+0.931 | Estimate: | $665,420 |
Length: | 5.2 Miles | Actual: | $762,135 |
District: | El Paso | Let Date: | APR 2001 |
Highway: | US 85 | Let Status: | Actual |
Project ID: | CPM 1-4-78 | CSJ: | 0001-04-078 |
Description: | MILL /OVERLAY | Handling Code: |
|
Limits From: | 326+1.160 | Fund Cat: | 7 |
Limits To: | 326=1.216 | Estimate: | $13,185 |
Length: | 0.1 Miles | Actual: | $14,536 |
District: | El Paso | Let Date: | APR 2001 |
Highway: | SH 20 | Let Status: | Actual |
Project ID: | CPM 2-1-64 | CSJ: | 0002-01-064 |
Description: | MILL /OVERLAY | Handling Code: |
|
Limits From: | 332-0.036 | Fund Cat: | 7 |
Limits To: | 338+1.952 | Estimate: | $1,781,659 |
Length: | 6.1 Miles | Actual: | $1,899,146 |
District: | El Paso | Let Date: | APR 2001 |
Highway: | IH 10 | Let Status: | Actual |
Project ID: | CPM 2-11-49 | CSJ: | 0002-11-049 |
Description: | MILL /OVERLAY IH 10 & US 90 INTERSECTION | Handling Code: |
|
Limits From: | IH 10 & US 90 INTERSECTION | Fund Cat: | 7 |
Limits To: | . | Estimate: | $39,829 |
Length: | 0.1 Miles | Actual: | $42,234 |
District: | El Paso | Let Date: | APR 2001 |
Highway: | US 62 | Let Status: | Actual |
Project ID: | CPM 2-12-18 | CSJ: | 0002-12-018 |
Description: | MILL /OVERLAY | Handling Code: |
|
Limits From: | RM 228+1.314 | Fund Cat: | 7 |
Limits To: | RM 230+0.608 | Estimate: | $316,314 |
Length: | 1.3 Miles | Actual: | $336,235 |
District: | El Paso | Let Date: | APR 2001 |
Highway: | FM 1505 | Let Status: | Actual |
Project ID: | CPM 2-16-14 | CSJ: | 0002-16-014 |
Description: | MILL /OVERLAY | Handling Code: |
|
Limits From: | 324+0.416 | Fund Cat: | 7 |
Limits To: | 324+0.745 | Estimate: | $293,222 |
Length: | 0.3 Miles | Actual: | $314,951 |
District: | El Paso | Let Date: | APR 2001 |
Highway: | BI 10-C | Let Status: | Actual |
Project ID: | CPM 2-19-7 | CSJ: | 0002-19-007 |
Description: | MILL /OVERLAY | Handling Code: |
|
Limits From: | RM 80-0.088 | Fund Cat: | 7 |
Limits To: | RM 84+0.987 | Estimate: | $330,164 |
Length: | 2.9 Miles | Actual: | $351,812 |
District: | El Paso | Let Date: | APR 2001 |
Highway: | US 54 | Let Status: | Actual |
Project ID: | CPM 167-1-88 | CSJ: | 0167-01-088 |
Description: | MILL /OVERLAY INTERSECTION AT US 54 & FRED WILSON | Handling Code: |
|
Limits From: | 22-0.181 | Fund Cat: | 7 |
Limits To: | 22+0.677 | Estimate: | $255,921 |
Length: | 0.8 Miles | Actual: | $289,845 |
District: | El Paso | Let Date: | APR 2001 |
Highway: | SH 54 | Let Status: | Actual |
Project ID: | CPM 233-5-31 | CSJ: | 0233-05-031 |
Description: | MILL & OVERLAY INTERSECTION | Handling Code: |
|
Limits From: | SH 54 & US 90 INTERSECTION | Fund Cat: | 7 |
Limits To: | . | Estimate: | $29,258 |
Length: | 0.1 Miles | Actual: | $30,142 |
District: | El Paso | Let Date: | APR 2001 |
Highway: | US 62 | Let Status: | Actual |
Project ID: | CPM 374-8-17 | CSJ: | 0374-08-017 |
Description: | OVERLAY | Handling Code: |
|
Limits From: | RM 116+0.000 | Fund Cat: | 7 |
Limits To: | RM 128+1.495 | Estimate: | $2,595,447 |
Length: | 15.9 Miles | Actual: | $2,797,064 |
District: | El Paso | Let Date: | APR 2001 |
Highway: | IH 10 | Let Status: | Actual |
Project ID: | CPM 2121-2-111 | CSJ: | 2121-02-111 |
Description: | MILL /OVERLAY IH 10 & SUNLAND PARK OFF RAMP | Handling Code: |
|
Limits From: | RM 13+0.606 | Fund Cat: | 7 |
Limits To: | RM 14+0.000 | Estimate: | $46,615 |
Length: | 0.5 Miles | Actual: | $50,822 |
District: | El Paso | Let Date: | APR 2001 |
Highway: | IH 10 | Let Status: | Actual |
Project ID: | CPM 2121-3-123 | CSJ: | 2121-03-123 |
Description: | MILL /OVERLAY | Handling Code: |
|
Limits From: | 30+0.475 | Fund Cat: | 7 |
Limits To: | 34+0.006 | Estimate: | $825,707 |
Length: | 3.5 Miles | Actual: | $878,148 |
Back... |
Totals for 0001-04-077 | ||
---|---|---|---|
Length: | 36.8 Miles | ||
Estimate: | $7,192,741 | ||
Actual: | $7,767,070 | ||
CCSJ: 0167-01-084 | |||
District: | El Paso | Let Date: | JAN 2001 |
Highway: | US 54 | Let Status: | Actual |
Project ID: | MG 2001(299) | CSJ: | 0167-01-084 |
Description: | WIDEN TO 4 LANE CONNECTION AT NEW MEXICO STATE LINE | Handling Code: |
|
Limits From: | NEW MEXICO STATE LINE | Fund Cat: | 13C |
Limits To: | 0.5 MI SOUTH OF NEW MEXICO STATE LINE | Estimate: | $790,736 |
Length: | 0.5 Miles | Actual: | $729,328 |
Back... |
Totals for 0167-01-084 | ||
Length: | 0.5 Miles | ||
Estimate: | $790,736 | ||
Actual: | $729,328 | ||
CCSJ: 0674-01-047 | |||
District: | El Paso | Let Date: | MAR 2001 |
Highway: | FM 76 | Let Status: | Actual |
Project ID: | STP 2000(972)MM | CSJ: | 0674-01-047 |
Description: | WIDEN 4 LANE TO 6 LANE DIVIDED URBAN | Handling Code: |
|
Limits From: | 0.32 KM WEST OF CAROLINA DR | Fund Cat: | 4C |
Limits To: | 0.63 KM EAST OF YARBROUGH DR | Estimate: | $8,686,157 |
Length: | 1.5 Miles | Actual: | $8,736,405 |
Back... |
Totals for 0674-01-047 | ||
Length: | 1.5 Miles | ||
Estimate: | $8,686,157 | ||
Actual: | $8,736,405 | ||
CCSJ: 0924-00-035 | |||
District: | El Paso | Let Date: | OCT 2000 |
Highway: | VA | Let Status: | Actual |
Project ID: | ITS 2000(992) | CSJ: | 0924-00-035 |
Description: | DEVELOP AN ITS REGIONAL ARCHITECTURE & DEPLOYMENT PLAN | Handling Code: |
XX |
Limits From: | VARIOUS LOCATION IN EL PASO DISTRICT | Fund Cat: | 15 |
Limits To: | . | Estimate: | $100,000 |
Length: | 0.0 Miles | Actual: | $100,000 |
Back... |
Totals for 0924-00-035 | ||
Length: | 0.0 Miles | ||
Estimate: | $100,000 | ||
Actual: | $100,000 | ||
CCSJ: 0924-00-040 | |||
District: | El Paso | Let Date: | MAY 2001 |
Highway: | VA | Let Status: | Actual |
Project ID: | BOR 2001(593) | CSJ: | 0924-00-040 |
Description: | IMPROVEMENT PLAN AND RELATED WORK FOR SIX PORT OF ENTRIES | Handling Code: |
XX |
Limits From: | VARIOUS LOCATIONS IN EL PASO DISTRICT | Fund Cat: | 15 |
Limits To: | . | Estimate: | $562,500 |
Length: | 0.0 Miles | Actual: | $561,899 |
Back... |
Totals for 0924-00-040 | ||
Length: | 0.0 Miles | ||
Estimate: | $562,500 | ||
Actual: | $561,899 | ||
CCSJ: 0924-06-157 | |||
District: | El Paso | Let Date: | JUN 2001 |
Highway: | CS | Let Status: | Actual |
Project ID: | STP 2001(84)HES | CSJ: | 0924-06-157 |
Description: | INSTALLATION OF CONTINUOUS LIGHTING | Handling Code: |
|
Limits From: | ON LEE TREVINO | Fund Cat: | 4A |
Limits To: | FROM GATEWAY EAST TO NORTH LOOP | Estimate: | $429,394 |
Length: | 1.3 Miles | Actual: | $325,715 |
District: | El Paso | Let Date: | JUN 2001 |
Highway: | CS | Let Status: | Actual |
Project ID: | STP 2001(84)HES | CSJ: | 0924-06-159 |
Description: | INSTALLATION OF CONTINUOUS LIGHTING | Handling Code: |
|
Limits From: | ON LEE TREVINO | Fund Cat: | 4A |
Limits To: | FROM GATEWAY WEST TO MONTANA | Estimate: | $833,782 |
Length: | 4.2 Miles | Actual: | $676,450 |
Bid Tabulations Back... |
Totals for 0924-06-157 | ||
Length: | 5.5 Miles | ||
Estimate: | $1,263,176 | ||
Actual: | $1,002,165 | ||
CCSJ: 0924-06-158 | |||
District: | El Paso | Let Date: | SEP 2000 |
Highway: | VA | Let Status: | Actual |
Project ID: | STP 2000(966)HES | CSJ: | 0924-06-158 |
Description: | INSTALLATION OF CONTINUOUS LIGHTING | Handling Code: |
|
Limits From: | ON GEORGE DIETER | Fund Cat: | 4A |
Limits To: | FROM ZARAGOZA TO VISTA DEL SOL | Estimate: | $271,182 |
Length: | 0.1 Miles | Actual: | $267,955 |
District: | El Paso | Let Date: | SEP 2000 |
Highway: | CS | Let Status: | Actual |
Project ID: | STP 2000(968)MM | CSJ: | 0924-06-174 |
Description: | RECONSTRUCTION | Handling Code: |
|
Limits From: | GEORGE DIETER | Fund Cat: | 4C |
Limits To: | . | Estimate: | $3,656,765 |
Length: | 2.2 Miles | Actual: | $4,469,997 |
District: | El Paso | Let Date: | SEP 2000 |
Highway: | CS | Let Status: | Actual |
Project ID: | CM 2000(967) | CSJ: | 0924-06-175 |
Description: | TRAFFIC SIGNAL SYSTEM INTERCONNECT PROJECT | Handling Code: |
|
Limits From: | GEORGE DIETER | Fund Cat: | 5 |
Limits To: | @ ZARAGOSA, ROJAS, PELICANO, ETC. | Estimate: | $344,020 |
Length: | 0.1 Miles | Actual: | $423,996 |
Back... |
Totals for 0924-06-158 | ||
Length: | 2.4 Miles | ||
Estimate: | $4,271,967 | ||
Actual: | $5,161,948 | ||
CCSJ: 0924-06-173 | |||
District: | El Paso | Let Date: | OCT 2000 |
Highway: | CS | Let Status: | Actual |
Project ID: | STP 2000(948)MM | CSJ: | 0924-06-173 |
Description: | VEHICLE DETECTOR REPLACEMENT PROGRAM (PHASES I, II & III) | Handling Code: |
|
Limits From: | CITYWIDE (EL PASO) | Fund Cat: | 5 |
Limits To: | . | Estimate: | $753,368 |
Length: | 0.1 Miles | Actual: | $752,537 |
Back... |
Totals for 0924-06-173 | ||
Length: | 0.1 Miles | ||
Estimate: | $753,368 | ||
Actual: | $752,537 | ||
CCSJ: 0924-06-178 | |||
District: | El Paso | Let Date: | JUL 2001 |
Highway: | CS | Let Status: | Actual |
Project ID: | STP 2001(75)MM | CSJ: | 0924-06-178 |
Description: | RECONSTRUCT LEE TREVINO | Handling Code: |
|
Limits From: | GATEWAY WEST | Fund Cat: | 4C |
Limits To: | ROJAS AVENUE | Estimate: | $1,476,090 |
Length: | 0.1 Miles | Actual: | $1,806,808 |
District: | El Paso | Let Date: | JUL 2001 |
Highway: | IH 10 | Let Status: | Actual |
Project ID: | CM 99(66) | CSJ: | 2121-03-114 |
Description: | CONSTRUCT 2 TURNAROUNDS AND BRIDGE WIDENING AT LEE TREVINO | Handling Code: |
|
Limits From: | LOMALAND DRIVE | Fund Cat: | 4C |
Limits To: | 0.20 MI EAST OF LEE TREVINO | Estimate: | $4,452,106 |
Length: | 0.6 Miles | Actual: | $5,520,378 |
District: | El Paso | Let Date: | JUL 2001 |
Highway: | IH 10 | Let Status: | Actual |
Project ID: | CM 2001(530) | CSJ: | 2121-03-124 |
Description: | RIGHT-OF-WAY UTILITIES | Handling Code: |
|
Limits From: | 0.675 MI W OF LEE TREVINO | Fund Cat: | 5 |
Limits To: | 0.155 MI E OF LEE TREVINO | Estimate: | $345,061 |
Length: | 0.1 Miles | Actual: | $297,476 |
Bid Tabulations Back... |
Totals for 0924-06-178 | ||
Length: | 0.8 Miles | ||
Estimate: | $6,273,257 | ||
Actual: | $7,624,662 | ||
CCSJ: 0924-06-182 | |||
District: | El Paso | Let Date: | AUG 2001 |
Highway: | CS | Let Status: | Actual |
Project ID: | CM 2001(85) | CSJ: | 0924-06-182 |
Description: | MISCELLANEOUS WORK;TRAFFIC LIGHT SYNCHRONIZATION (PHASE 1) | Handling Code: |
|
Limits From: | CITY OF EL PASO | Fund Cat: | 5 |
Limits To: | . | Estimate: | $1,953,628 |
Length: | 0.0 Miles | Actual: | $2,063,870 |
Award Status Bid Tabulations Back... |
Totals for 0924-06-182 | ||
Length: | 0.0 Miles | ||
Estimate: | $1,953,628 | ||
Actual: | $2,063,870 | ||
CCSJ: 0924-06-202 | |||
District: | El Paso | Let Date: | AUG 2001 |
Highway: | CS | Let Status: | Actual |
Project ID: | CM 2001(803) | CSJ: | 0924-06-202 |
Description: | CONSTRUCT TRANSIT TERMINAL ON LEE TREVINO DRIVE | Handling Code: |
TR |
Limits From: | TRANSIT TERMINAL - LEE TREVINO | Fund Cat: | 5 |
Limits To: | . | Estimate: | $1,800,000 |
Length: | 0.0 Miles | Actual: | $1,800,000 |
Back... |
Totals for 0924-06-202 | ||
Length: | 0.0 Miles | ||
Estimate: | $1,800,000 | ||
Actual: | $1,800,000 | ||
CCSJ: 0924-06-203 | |||
District: | El Paso | Let Date: | AUG 2001 |
Highway: | CS | Let Status: | Actual |
Project ID: | CM 2001(804) | CSJ: | 0924-06-203 |
Description: | CONSTRUCTION OF AN INTERNATIONAL MULTIMODAL FACILITY | Handling Code: |
TR |
Limits From: | CITY OF EL PASO | Fund Cat: | 5 |
Limits To: | . | Estimate: | $5,725,000 |
Length: | 0.0 Miles | Actual: | $5,725,000 |
Back... |
Totals for 0924-06-203 | ||
Length: | 0.0 Miles | ||
Estimate: | $5,725,000 | ||
Actual: | $5,725,000 | ||
CCSJ: 0924-06-204 | |||
District: | El Paso | Let Date: | AUG 2001 |
Highway: | CS | Let Status: | Actual |
Project ID: | CM 2001(805) | CSJ: | 0924-06-204 |
Description: | CONSTRUCTION OF THE WESTSIDE TRANSIT TERMINAL | Handling Code: |
TR |
Limits From: | TRANSIT TERMINAL - WESTSIDE | Fund Cat: | 5 |
Limits To: | . | Estimate: | $1,800,000 |
Length: | 0.0 Miles | Actual: | $1,800,000 |
Back... |
Totals for 0924-06-204 | ||
Length: | 0.0 Miles | ||
Estimate: | $1,800,000 | ||
Actual: | $1,800,000 | ||
CCSJ: 2121-01-064 | |||
District: | El Paso | Let Date: | AUG 2001 |
Highway: | IH 10 | Let Status: | Actual |
Project ID: | CM 2001(646) | CSJ: | 2121-01-064 |
Description: | TRAFFIC MANAGEMENT EXTENSION | Handling Code: |
|
Limits From: | NEW MEXICO STATE LINE | Fund Cat: | 5 |
Limits To: | SH 20 (MESA STREET) | Estimate: | $2,854,817 |
Length: | 0.0 Miles | Actual: | $3,012,206 |
District: | El Paso | Let Date: | AUG 2001 |
Highway: | IH 10 | Let Status: | Actual |
Project ID: | CM 2001(646) | CSJ: | 2121-02-110 |
Description: | TRAFFIC MANAGEMENT EXTENSION | Handling Code: |
|
Limits From: | SH 20 (MESA STREET) | Fund Cat: | 5 |
Limits To: | 1/2 MI EAST OF RESLER | Estimate: | $404,531 |
Length: | 0.0 Miles | Actual: | $378,247 |
Award Status Bid Tabulations Back... |
Totals for 2121-01-064 | ||
Length: | 0.0 Miles | ||
Estimate: | $3,259,348 | ||
Actual: | $3,390,453 | ||
CCSJ: 2121-02-090 | |||
District: | El Paso | Let Date: | DEC 2000 |
Highway: | IH 10 | Let Status: | Actual |
Project ID: | NH 2001(102) | CSJ: | 2121-02-090 |
Description: | RELOCATE AND CONSTRUCT ENTRANCE RAMPS | Handling Code: |
|
Limits From: | COTTON STREET | Fund Cat: | 3E |
Limits To: | 0.9 MI EAST | Estimate: | $7,452,738 |
Length: | 0.8 Miles | Actual: | $5,658,524 |
District: | El Paso | Let Date: | DEC 2000 |
Highway: | MH | Let Status: | Actual |
Project ID: | BR 88(787)O | CSJ: | 8045-24-002 |
Description: | REPLACE OVERPASS AND APPROACHES | Handling Code: |
|
Limits From: | ON COTTON ST AT SPT RR O/P IN EL PASO | Fund Cat: | 6B |
Limits To: | . | Estimate: | $11,791,899 |
Length: | 0.3 Miles | Actual: | $8,019,464 |
Back... |
Totals for 2121-02-090 | ||
Length: | 1.1 Miles | ||
Estimate: | $19,244,637 | ||
Actual: | $13,677,988 | ||
CCSJ: 2121-03-122 | |||
District: | El Paso | Let Date: | MAY 2001 |
Highway: | IH 10 | Let Status: | Actual |
Project ID: | CSR 2121-3-122 | CSJ: | 2121-03-122 |
Description: | COPING WALL REHABILITATION | Handling Code: |
|
Limits From: | 2000 FT WEST OF ZARAGOZA RD (FM 659) | Fund Cat: | 14 |
Limits To: | 2000 FT EAST OF ZARAGOZA FD (FM 659) | Estimate: | $130,145 |
Length: | 0.1 Miles | Actual: | $158,532 |
Back... |
Totals for 2121-03-122 | ||
Length: | 0.1 Miles | ||
Estimate: | $130,145 | ||
Actual: | $158,532 | ||
CCSJ: 2121-04-059 | |||
District: | El Paso | Let Date: | JUL 2001 |
Highway: | IH 10 | Let Status: | Actual |
Project ID: | NH 2001(571) | CSJ: | 2121-04-059 |
Description: | CONSTURCTION OF IH 10 / EASTLAKE BLVD INTERCHANGE | Handling Code: |
|
Limits From: | 0.504 MI NW OF EASTLAKE BLVD | Fund Cat: | 4C |
Limits To: | 0.556 MI SE OF EASTLAKE BLVD | Estimate: | $13,246,166 |
Length: | 1.2 Miles | Actual: | $14,278,108 |
Bid Tabulations Back... |
Totals for 2121-04-059 | ||
Length: | 1.2 Miles | ||
Estimate: | $13,246,166 | ||
Actual: | $14,278,108 | ||
CCSJ: 2552-01-039 | |||
District: | El Paso | Let Date: | MAR 2001 |
Highway: | LP 375 | Let Status: | Actual |
Project ID: | CM 2001(333) | CSJ: | 2552-01-039 |
Description: | TRAFFIC SIGNAL EXPANSION | Handling Code: |
|
Limits From: | US 54, (PATRIOT FREEWAY) | Fund Cat: | 5 |
Limits To: | RAILROAD RD. | Estimate: | $625,310 |
Length: | 0.0 Miles | Actual: | $684,198 |
Back... |
Totals for 2552-01-039 | ||
Length: | 0.0 Miles | ||
Estimate: | $625,310 | ||
Actual: | $684,198 |