Letting Schedule for June, 2001 (FY 2001)

Texas Department of Transportation Logo (Registered Trademark)
 
 
Last Update: Friday, August 31, 2001
 
Updated from Design & Construction Information System (DCIS) on: August 31, 2001
June, 2001 (FY 2001) (see Links)
SEP 2000 | OCT 2000 | NOV 2000 | DEC 2000 | JAN 2001 | FEB 2001 | MAR 2001 | APR 2001 | MAY 2001 | JUN 2001 | JUL 2001 | AUG 2001
CCSJ County/
District
Highway Let Status Contract
Cost
Fund
Cat
Description
0910-08-043 Anderson/
Tyler
VA Actual $383,742 9 CONSTRUCT ROAD & PARKING AREA FOR PROPOSED EDUCATION CENTER
0200-03-026 Angelina/
Lufkin
US 69 Actual $1,063,437 4F RECONSTRUCT SHOULDERS, MILL & INLAY LANES, AND SURFACE TREAT
0911-38-051 Angelina/
Lufkin
VA Actual $198,979 16B LANDSCAPE DEVELOPMENT
1406-01-022 Angelina/
Lufkin
FM 1271 Actual $359,402 4A REALIGN INTERSECTION
0180-04-105 Aransas/
Corpus Christi
SH 35 Actual $1,195,668 7 ONE COURSE SURFACE TREATMENT AND OVERLAY
0115-04-035 Bastrop/
Austin
FM 20 Actual $1,118,292 6A REPLACE BRIDGE & APPROACHES
0521-04-210 Bexar/
San Antonio
IH 410 Actual $13,115,210 3A RECONSTRUCT AND WIDEN BRIDGES AT MC CULLOUGH AND US 281
0915-00-087 Bexar/
San Antonio
VA Actual $194,118 2 RAISED REFL PAVEMENT MARKERS REPLACEMENT (FY 2001) -CAT 2
2452-03-090 Bexar/
San Antonio
LP 1604 Actual $4,782,914 7 ACP OVERLAY & PAVEMENT MARKINGS
0295-02-024 Borden/
Abilene
US 180 Actual $3,801,425 11 FLY ASH TREAT EXISTING BASE, FLEX BASE, UNDERSEAL, AND
1378-04-033 Burnet/
Austin
RM 1431 Actual $1,125,767 4F ADD LEFT TURN LANE
0535-03-017 Caldwell/
Austin
IH 10 Actual $208,477 16C WIDEN RAMP FOR FRT RD STUBOUT & CONST LEFT TURN LANE
0222-04-047 Cass/
Atlanta
SH 49 Actual $2,953,093 4F STRENGTHEN BASE AND RESURFACE EXISTING 2-LANE RURAL HIGHWAY
0206-04-031 Cherokee/
Tyler
US 79 Actual $3,059,215 3B WIDEN TO 4 LANE DIVIDED URBAN HIGHWAY WITH FLUSH MEDIAN
0224-01-051 Clay/
Wichita Falls
US 287 Actual $3,614,636 7 OVERLAY
0619-03-046 Collin/
Dallas
FM 544 Actual $5,665,446 15 WIDEN TO 6 LANE DIVIDED URBAN
0903-15-034 Cooke/
Wichita Falls
CR Actual $658,942 6B REPLACE BRIDGE AND APPROACHES
0903-15-038 Cooke/
Wichita Falls
CR Actual $192,153 6B REPLACE BRIDGE AND APPROACHES
0866-03-013 Crane/
Odessa
FM 1053 Actual $807,959 11 REHABILITATION OF EXISTING ROAD
0047-07-193 Dallas/
Dallas
US 75 Actual $333,120 16B LANDSCAPE ESTABLISHMENT
0048-01-043 Dallas/
Dallas
SH 342 Actual $3,312,987 4G REPLACE RAILROAD UNDERPASS
0196-03-224 Dallas/
Dallas
IH 35E Actual $197,360 5 RIGHT OF WAY ACQUISITION AND UTILITY ADJUSTMENTS
0196-06-024 Dallas/
Dallas
LP 354 Actual $42,720 5 RIGHT OF WAY ACQUISITION AND UTILITY ADJUSTMENTS
0196-06-025 Dallas/
Dallas
LP 354 Actual $60,000 5 RIGHT OF WAY ACQUISITION AND UTILITY ADJUSTMENTS
0918-00-055 Dallas/
Dallas
VA Actual $500,000 5 ALTERNATIVE FUELS
0918-45-176 Dallas/
Dallas
CR Actual $353,984 6B REPLACE OFF SYSTEM BRIDGE
0918-45-560 Dallas/
Dallas
CS Actual $7,155 5 RIGHT OF WAY ACQUISITION AND UTILITY ADJUSTMENTS
0918-45-561 Dallas/
Dallas
CS Actual $73,880 5 RIGHT OF WAY ACQUISITION_AND UTILITY ADJUSTMENTS
0918-45-562 Dallas/
Dallas
CS Actual $87,240 5 RIGHT OF WAY ACQUISITION AND UTILITY ADJUSTMENTS
0918-45-563 Dallas/
Dallas
CS Actual $79,500 5 RIGHT OF WAY ACQUISITION AND UTILITY ADJUSTMENTS
0918-45-564 Dallas/
Dallas
CS Actual $17,100 5 RIGHT OF WAY ACQUISITION AND UTILITY ADJUSTMENTS
0918-45-565 Dallas/
Dallas
CS Actual $32,764 5 RIGHT OF WAY ACQUISITION AND UTILITY ADJUSTMENTS
0918-45-566 Dallas/
Dallas
CS Actual $29,616 5 RIGHT OF WAY ACQUISITION AND UTILITY ADJUSTMENTS
0918-45-567 Dallas/
Dallas
CS Actual $25,180 5 RIGHT OF WAY ACQUISITION AND UTILITY ADJUSTMENTS
0918-45-568 Dallas/
Dallas
CS Actual $192,510 5 RIGHT OF WAY ACQUISITION AND UTILITY ADJUSTMENTS
0918-45-569 Dallas/
Dallas
CS Actual $46,675 5 RIGHT OF WAY ACQUISITION AND UTILITY ADJUSTMENTS
0918-45-570 Dallas/
Dallas
CS Actual $93,775 5 RIGHT OF WAY ACQUISITION AND UTILITY ADJUSTMENTS
0918-45-571 Dallas/
Dallas
CS Actual $89,100 5 RIGHT OF WAY ACQUISITION AND UTILITY ADJUSTMENTS
0918-45-572 Dallas/
Dallas
CS Actual $42,855 5 RIGHT OF WAY ACQUISITION AND UTILITY ADJUSTMENTS
0918-45-573 Dallas/
Dallas
CS Actual $473,098 5 RIGHT OF WAY ACQUISITION AND UTILITY ADJUSTMENTS
0918-45-574 Dallas/
Dallas
CS Actual $45,068 5 RIGHT OF WAY ACQUISITION AND UTILITIES ADJUSTMENTS
0918-45-575 Dallas/
Dallas
CS Actual $3,497 5 RIGHT OF WAY ACQUISITION AND UTILITIES ADJUSTMENTS
1068-04-124 Dallas/
Dallas
IH 30 Actual $3,315,953 2 REPAIR OF EXISTING BRIDGE DECK AND OVERLAY
0380-05-017 Dawson/
Lubbock
SH 137 Actual $5,497,142 14 OVERLAY
0196-01-086 Denton/
Dallas
US 77 Actual $699,756 7 PLANING PAVEMENT, BASE REPAIR, ACP SURFACE AND PAVEMENT
0269-06-045 Dewitt/
Yoakum
US 183 Actual $3,839,101 13B CONSTRUCT NEW OVERPASS
0359-01-028 Dewitt/
Yoakum
SH 119 Actual $506,682 11 SAFETY TREAT STRUCTURES
0086-10-037 Duval/
Laredo
SH 359 Actual $177,941 4A FOR THE CONSTRUCTION OF IMPROVING GUARDRAIL
0005-01-091 Ector/
Odessa
BI 20-E Actual $284,413 7 PLANING, CONCRETE REPAIR MARKERS /MARKINGS
0375-05-055 Edwards/
San Angelo
RM 674 Actual $7,037,040 8A RESTORATION OF EXISTING ROADWAY
0924-06-157 El Paso/
El Paso
CS Actual $1,002,165 4A INSTALLATION OF CONTINUOUS LIGHTING
0323-02-027 Fayette/
Yoakum
SH 95 Actual $2,547,701 14 REHABILITATE ROADWAY
1415-02-031 Fort Bend/
Houston
FM 1464 Actual $774,207 14 WIDEN SUBGRADE, ACP OVERLAY, PAVEMENT MARKINGS AND TRAFFIC
0057-02-024 Freestone/
Bryan
US 84 Actual $2,739,972 14 OVERLAY CONSISTING OF ONE COURSE SURFACE TREATMENT, HMA
0500-04-107 Galveston/
Houston
IH 45 Actual $1,388,493 7 SHOULDER EDGE REPAIRS, CRACK SEALING AND VEHICLE IMPACT
0113-01-031 Gillespie/
Austin
US 290 Actual $2,979,549 4D ADD LEFT TURN LANE
0088-03-036 Goliad/
Corpus Christi
US 59 Actual $510,063 11 ADD PASSING LANE
0366-02-067 Guadalupe/
San Antonio
SH 123 Actual $629,476 7 SURFACING, SEAL COATING, OVERLAYING & PAVEMENT MARKINGS
0067-06-043 Hale/
Lubbock
IH 27 Actual $5,494,000 4B RECONSTRUCT SAFETY REST AREA
0027-09-066 Harris/
Houston
US 90A Actual $42,170,018 12 WIDEN TO 8-LN DIVIDED C & G W / GR SEPARATIONS & ACCESS ROADS
0271-17-124 Harris/
Houston
IH 610 Actual $34,210,053 2 TSM, RECONSTRUCT 8-LANE FREEWAY
0500-03-477 Harris/
Houston
IH 45 Actual $3,146,212 14 REPLACE BRIDGE AND APPROACHES
0912-00-180 Harris/
Houston
VA Actual $909,296 11 INSTALL OVERHEAD STREET NAME SIGNS AT SIGNALIZED
0912-71-746 Harris/
Houston
VA Actual $897,398 11 STRIPING
8041-12-008 Harris/
Houston
MH Actual $4,260,207 17 CONSTRUCT 4-LN DIVIDED (RAISED MEDIAN) URBAN STREET FACILITY
8041-12-010 Harris/
Houston
MH Actual $8,307,204 4C CONSTRUCT 6-LN DIVIDED (RAISED MEDIAN) URBAN STREET FACILITY
0863-03-025 Hidalgo/
Pharr
FM 493 Actual $3,063,433 14 RECONSTRUCT AND ADD SHOULDERS
0921-00-048 Hidalgo/
Pharr
VA Actual $549,412 10A THERMOPLASTIC STRIPING
0080-04-076 Hood/
Fort Worth
US 377 Actual $428,800 11 INSTALL TRAFFIC SIGNAL
0009-09-082 Hopkins/
Paris
IH 30 Actual $1,835,000 14 SPOT BS REPAIR, HMAC LEVEL-UP & OVERLAY
0940-01-011 Houston/
Lufkin
FM 357 Actual $3,528,341 14 REPLACE BRIDGE AND APPROACHES
0095-04-057 Kaufman/
Dallas
US 80 Actual $104,036 11 ADD LEFT TURN LANE
0157-02-033 Knox/
Childress
US 277 Actual $4,578,250 3B WIDEN & RECONSTRUCT TO 4 LANE DIVIDED RURAL
0018-01-063 La Salle/
Laredo
IH 35 Actual $13,152,065 2 EXCAVATION, LIME TREAT SUBGRADE, FLEX BASE AND ACP BASE, AND
0675-03-050 Leon/
Bryan
IH 45 Actual $242,811 2 MISCELLANEOUS CONSTRUCTION CONSISTING OF REPLACING EXISTING
0475-03-055 Madison/
Bryan
OSR Actual $89,998 4A MISCELLANEOUS WORK CONSISTING OF THE INSTALLATION OF A
0179-04-080 Matagorda/
Yoakum
SH 35 Actual $1,487,300 15 ADD 2 LANES FOR 4 LANE DIVIDED WITH FLUSH MEDIAN
0605-01-053 Matagorda/
Yoakum
FM 457 Actual $3,365,533 4F ADD SHOULDERS AND UPGRADE ROADWAY
0005-02-093 Midland/
Odessa
BI 20-E Actual $1,215,947 4A SAFETY TREAT DRAINAGE STRUCTURES AND WIDEN DRAINAGE
1718-08-010 Midland/
Odessa
LP 40 Actual $86,480 16B LANDSCAPE
0675-08-054 Montgomery/
Houston
IH 45 Actual $4,521,339 3E CONSTRUCT 3-LANE SOUTHBOUND FRONTAGE ROAD GRADE SEPARATION
3050-02-015 Montgomery/
Houston
FM 2978 Actual $1,673,198 14 BASE AND ASPHALT REPAIR, O.C.S.T., MILLING AND OVERLAY
2808-02-005 Nacogdoches/
Lufkin
FM 2782 Actual $1,949,996 8B CONSTRUCT NEW FARM TO MARKET ROAD / EXTEND FARM TO MARKET
0092-06-092 Navarro/
Dallas
IH 45 Actual $944,390 2 REPLACE BRIDGE AND APPROACHES
2343-01-026 Nueces/
Corpus Christi
FM 2444 Actual $625,025 11 REHABILITATE ROADWAY AND WIDEN
0902-38-026 Parker/
Fort Worth
CR Actual $747,232 6B REPLACE BRIDGE AND APPROACHES
0902-38-028 Parker/
Fort Worth
CR Actual $684,639 6B REPLACE BRIDGE
0140-04-039 Pecos/
Odessa
IH 10 Actual $59,500 4B RIGHT OF WAY ACQUISITION AND UTILITIES ADJUSTMENT
0441-07-063 Pecos/
Odessa
IH 10 Actual $55,500 4B RIGHT OF WAY ACQUISITION AND UTILITIES ADJUSTMENTS
1877-02-012 Polk/
Lufkin
FM 942 Actual $5,347,270 14 REHAB EXISTING ROADWAY
0020-08-036 Presidio/
El Paso
US 67 Actual $719,811 4B CONSTRUCTION OF THE MARFA LIGHTS VIEWING CENTER
0594-02-021 Rusk/
Tyler
SH 322 Actual $1,930,913 16C UPGRADE 2-LN HIGHWAY & CONSTRUCT MINING HAUL ROAD OVERPASS
0923-25-017 San Saba/
Brownwood
VA Actual $615,652 7 CLEAN AND RESEAL BRIDGE JOINTS, HMAC, MILLING
1195-01-024 Shelby/
Lufkin
FM 947 Actual $248,641 4A REVOVE TREES (4: 1) AND (6: 1)
0172-01-041 Tarrant/
Fort Worth
BU 287P Actual $6,467,158 4G WIDEN FOUR LANE TO SIX LANE DIVIDED WITH RR GR SEPR STRS
0363-01-116 Tarrant/
Fort Worth
SH 26 Actual $93,856 10A TRAFFIC SIGNAL UPGRADE TO MAST ARM INSTALLATION
0363-03-041 Tarrant/
Fort Worth
SH 121 Actual $1,874,852 11 ADDITION OF CENTER TRAFFIC BARRIER
0902-00-082 Tarrant/
Fort Worth
VA Actual $129,472 10A SCHOOL FLASHERS
0902-00-085 Tarrant/
Fort Worth
VA Actual $125,276 10A SCHOOL FLASHERS
0902-48-185 Tarrant/
Fort Worth
CS Actual $332,702 6B REPLACE BRIDGE AND APPROACHES
1068-01-158 Tarrant/
Fort Worth
IH 30 Actual $15,327,621 16B CONSTRUCT DOWNTOWN AND LANCASTER AVE CONNECTION & TMS
2266-02-106 Tarrant/
Fort Worth
SH 360 Actual $2,491,187 15 INSTALL DETECTION, DYNAMIC MESSAGE SIGNS, LANE CONTROL SIGNS
0907-00-050 Tom Green/
San Angelo
VA Actual $622,323 11 UPGRADE EXISTING SIGNS
0907-00-053 Tom Green/
San Angelo
VA Actual $763,856 11 UPGRADE FLASHING BEACON ASSEMBLIES
0113-13-126 Travis/
Austin
SH 71 Actual $393,000 4A SAFETY TREAT DRAINAGE STRUCTURES
0527-02-014 Waller/
Houston
FM 1458 Actual $1,057,858 7 BASE REPAIR, PLANING, ASPHALTIC SURFACE REHABILITATION,
0114-09-060 Washington/
Bryan
US 290 Actual $6,581,427 14 OVERLAY CONSISTING OF A ONE COURSE SURFACE TREATMENT, HMA
0151-04-039 Williamson/
Austin
SH 29 Actual $1,287,420 14 EXTEND 14' LTL FROM LIBERTY HILL HIGH SCHOOL EAST TO SEWARD
0273-04-023 Williamson/
Austin
US 183 Actual $3,176,134 7 FULL DEPTH REPAIR, LEVELUP, UNDERSEAL & OV
0914-05-102 Williamson/
Austin
CR Actual $263,487 6B REPLACE BRIDGE & APPROACHES
3417-02-014 Williamson/
Austin
FM 734 Actual $117,027 16C CONST MEDIAN OPENING
0366-05-015 Wilson/
San Antonio
SH 123 Actual $297,301 7 MICRO SEAL


Let Status Definition
Tentative Estimated letting date for this project
Approved Project has administrative approval to be let
Actual Project was let to contract