Letting Schedule for Houston District (FY 2001)
![]() |
![]() |
![]() |
![]() |
![]() |
Letting Schedule for Houston District (FY 2001) | ||||
Last Update: Friday, August 31, 2001 | ||||
Updated from Design & Construction Information System (DCIS) on: August 31, 2001 |
Houston District (FY 2001) |
Brazoria | Fort Bend | Galveston | Harris | Montgomery | Waller | ||||||
Brazoria County | ||||||
CCSJ | Highway | Let Status | Letting Date |
Contract Cost |
Fund Cat |
Description |
---|---|---|---|---|---|---|
0111-04-032 | FM 521 | Actual | MAY 2001 | $1,769,178 | 14 | SHOULDER REPAIR AND CRACK SEAL |
0111-07-043 | BS 288B | Actual | SEP 2000 | $1,149,769 | 14 | INSTALL CONTINUOUS TURN LANE |
0111-08-101 | BS 288B | Actual | MAY 2001 | $965,952 | 6A | REPLACE BRIDGE |
0111-08-109 | SH 288 | Actual | MAR 2001 | $528,030 | 7 | REHABILITATE BRIDGE |
0111-08-112 | SH 288 | Actual | MAR 2001 | $177,265 | 10A | INSTALLATION OF A FLASHING BEACON TRAFFIC SIGNAL WITH SAFETY |
0587-01-049 | FM 1495 | Actual | NOV 2000 | $10,741,702 | 6A | REPLACE BRIDGE |
0598-02-035 | SH 288 | Actual | MAY 2001 | $1,762,901 | 7 | FULL DEPTH CONCRETE REPAIR |
0598-03-017 | SH 288 | Actual | OCT 2000 | $309,189 | 10A | INSTALL ADVANCED WARNING SIGNALS /SIGNS |
0912-31-081 | CS | Actual | APR 2001 | $3,787,513 | 6B | REPLACE BRIDGE |
0912-31-090 | CR | Actual | SEP 2000 | $233,939 | 6B | REPLACE BRIDGE |
0912-31-112 | VA | Actual | SEP 2000 | $1,327,004 | 14 | REHAB SIGNS |
0912-31-125 | VA | Actual | DEC 2000 | $331,955 | 11 | RAISE MBGF TO MEET STANDARDS |
1414-04-014 | FM 1462 | Actual | MAR 2001 | $1,551,292 | 14 | ACP OVERLAY |
2938-02-019 | FM 2917 | Actual | FEB 2001 | $2,755,165 | 14 | ACP OVERLAY, WIDEN SHOULDERS, WIDEN BRIDGES AND REPLACE CMP |
Fort Bend County | ||||||
CCSJ | Highway | Let Status | Letting Date |
Contract Cost |
Fund Cat |
Description |
0027-07-036 | US 90A | Actual | MAY 2001 | $155,000 | 11 | OUTFALL DRAINAGE IMPROVEMENTS |
0027-08-150 | US 90A | Actual | MAY 2001 | $200,197 | 5 | INSTALL ARTERIAL TRAFFIC MANAGEMENT SYSTEM |
0027-12-104 | US 59 | Actual | SEP 2000 | $1,302,805 | 16F | INSTALL SHEET PILING, TIMBER JETTY PANELS, SLOPE |
0027-12-108 | US 59 | Actual | AUG 2001 | $1,262,841 | 14 | IMPROVE GUARDRAIL TO DESIGN STANDARDS |
0111-03-043 | FM 521 | Actual | SEP 2000 | $1,830,349 | 14 | BASE REPAIR, CRACK SEAL, ACP OVERLAY WITH 3 LEFT TURN LANES |
0188-09-027 | FM 723 | Actual | FEB 2001 | $3,182,299 | 4G | RAILROAD GRADE SEPARATION AND APPROACHES |
0188-09-035 | FM 723 | Actual | MAY 2001 | $3,897,802 | 11 | BASE REPAIR, WIDEN SUBGRADE AND ACP OVERLAY |
0543-03-051 | FM 762 | Actual | NOV 2000 | $501,302 | 14 | INTERSECTION MODIFICATION |
0912-34-087 | CR | Actual | MAR 2001 | $577,923 | 6B | REPLACE BRIDGES |
0912-34-089 | CR | Actual | AUG 2001 | $265,081 | 6B | REPLACE BRIDGE |
0912-34-098 | VA | Actual | NOV 2000 | $936,475 | 11 | SMALL SIGN UPGRADE |
0912-34-099 | VA | Actual | JAN 2001 | $611,234 | 7 | REHABILITATE ROADS ON VARIOUS HIGHWAYS |
0912-34-100 | CR | Actual | AUG 2001 | $343,613 | 4C | PRELIMINARY ENGINEERING /ENVIRONMENTAL ANALYSIS |
1415-02-031 | FM 1464 | Actual | JUN 2001 | $774,207 | 14 | WIDEN SUBGRADE, ACP OVERLAY, PAVEMENT MARKINGS AND TRAFFIC |
3510-04-017 | SH 99 | Actual | JAN 2001 | $1,010,744 | 14 | INSTALL DRAINAGE BLANKET, PIPE LINER & REPAIR RCP |
Galveston County | ||||||
CCSJ | Highway | Let Status | Letting Date |
Contract Cost |
Fund Cat |
Description |
0051-03-087 | SH 3 | Actual | MAY 2001 | $981,745 | 7 | BASE REPAIR, SEAL COAT WITH OVERLAY |
0192-04-084 | SH 6 | Actual | AUG 2001 | $209,433 | 4A | IMPROVE GUARDRAIL TO DESIGN STANDARDS |
0192-04-092 | SH 6 | Actual | APR 2001 | $203,760 | 7 | JOINT CRACK SEAL AND SPOT BASE REPAIR |
0367-03-031 | SH 87 | Actual | SEP 2000 | $375,854 | 10A | INSTALLATION OF SPECIAL ADVANCE WARNING SIGNS WITH |
0367-04-069 | SH 87 | Actual | APR 2001 | $705,497 | 11 | INSTALL LIGHTING |
0367-06-053 | SH 87 | Actual | FEB 2001 | $213,585 | 11 | PROVIDE CCTV SURVEILLANCE |
0389-06-086 | SH 146 | Actual | APR 2001 | $583,951 | 11 | INSTALL MARINE FENDER SYSTEM |
0500-01-124 | IH 45 | Actual | JAN 2001 | $169,878 | 14 | REPLACE LIGHTING CONDUIT, CONDUCTORS AND ELECTRICAL SERVICES |
0500-04-107 | IH 45 | Actual | JUN 2001 | $1,388,493 | 7 | SHOULDER EDGE REPAIRS, CRACK SEALING AND VEHICLE IMPACT |
0500-04-108 | IH 45 | Actual | MAY 2001 | $1,343,298 | 7 | BASE REPAIR, AND SEAL COAT OVERLAY |
0912-73-062 | CS | Actual | FEB 2001 | $320,997 | 13D | RECONSTRUCT ROADWAY |
0912-73-068 | VA | Actual | FEB 2001 | $500,000 | 5 | PURCHASE 5 MID-SIZE LOW EMMISSION DIESEL TRANSIT VEHICLES |
0912-73-069 | VA | Actual | AUG 2001 | $125,000 | 5 | CONDUCT PE TO INSTALL COMPUTERIZED TRAFFIC CONTROL SYSTEM IN |
0912-73-072 | VA | Actual | DEC 2000 | $523,948 | 7 | REHAB OF A BRIDGE FACILITY CONSISTING OF JOINT & CRACK |
0912-73-073 | VA | Actual | DEC 2000 | $965,119 | 14 | REHAB SIGNS |
0912-73-075 | VA | Actual | FEB 2001 | $486,757 | 14 | REPLACE LIGHTING SYSTEM |
0912-73-095 | VA | Actual | FEB 2001 | $187,500 | 5 | FY 2000 - ELECTRIC BUS DEMO: OPERATING ASSISTANCE FOR 2 BUSES |
0912-73-097 | VA | Actual | AUG 2001 | $187,500 | 5 | FY 2001 - ELECTRIC BUS DEMO: OPERATING ASSISTANCE FOR 2 BUSES |
0978-01-031 | FM 646 | Actual | AUG 2001 | $267,675 | 10A | ADD TURN BAY AND SIGNAL |
0978-02-045 | FM 517 | Actual | FEB 2001 | $5,718,760 | 15 | WIDEN FROM TWO LANES TO 4-LANE DIVIDED, CURB & GUTTER |
1607-01-043 | FM 1764 | Actual | SEP 2000 | $3,854,251 | 14 | THIN BOND OVERLAY |
1844-02-016 | FM 2351 | Actual | JAN 2001 | $220,765 | 14 | CONSTRUCT ADDITIONAL WESTBOUND LANE |
2523-03-005 | FM 646 | Actual | APR 2001 | $88,860 | 7 | JOINT CRACK SEAL AND SPOT REPAIR |
Harris County | ||||||
CCSJ | Highway | Let Status | Letting Date |
Contract Cost |
Fund Cat |
Description |
0027-09-066 | US 90A | Actual | JUN 2001 | $42,170,018 | 12 | WIDEN TO 8-LN DIVIDED C & G W / GR SEPARATIONS & ACCESS ROADS |
0028-02-073 | US 90 | Actual | APR 2001 | $9,147,140 | 4E | GRADE SEPARATION |
0050-06-058 | US 290 | Actual | FEB 2001 | $8,721,051 | 11 | CONSTRUCT INTERIM GRADE SEPARATION |
0110-05-103 | IH 45 | Actual | MAY 2001 | $117,700 | 11 | UPGRADE GUARDRAIL TO STANDARD |
0177-11-136 | US 59 | Actual | DEC 2000 | $317,095 | 7 | REPAIR BRIDGE AND EXPANSION JOINTS |
0177-11-139 | US 59 | Actual | MAY 2001 | $676,945 | 14 | REPLACE RETAINING WALL AND REPAIR RIPRAP EMBANKMENT FAILURE |
0178-01-028 | SH 35 | Actual | FEB 2001 | $650,871 | 11 | JOINT AND CRACK SEAL FULL DEPTH PVMT REPAIR |
0271-07-221 | IH 10 | Actual | JAN 2001 | $289,876 | 11 | REHABILITATE FRONTAGE ROAD BRIDGE DECK (EB & WB) AND RAMP |
0271-07-253 | IH 10 | Actual | SEP 2000 | $1,989,362 | 7 | REPAIR AND REHAB APPROACH SLAB, ARMOUR JOINT AND RETROFIT |
0271-14-194 | IH 610 | Actual | SEP 2000 | $2,749,116 | 16S | MISCELLANEOUS WORK (NOISE WALLS) |
0271-14-199 | IH 610 | Actual | FEB 2001 | $255,689 | 10A | INSTALLATION OF A TRAFFIC SIGNAL AT EACH FRONTAGE ROAD |
0271-17-124 | IH 610 | Actual | JUN 2001 | $34,210,053 | 2 | TSM, RECONSTRUCT 8-LANE FREEWAY |
0271-17-137 | IH 610 | Actual | DEC 2000 | $684,274 | 11 | SHOULDER RECONSTRUCTION, RAMP REHABILITATION, SIGNING AND |
0271-17-138 | IH 610 | Actual | AUG 2001 | $32,692,153 | 6A | EXTEND FRONTAGE ROADS UNDER US 59 AND CONNECT WESTPARK |
0271-17-139 | IH 610 | Actual | FEB 2001 | $475,986 | 12 | INSTALL HIGH MAST LIGHTING |
0389-05-082 | SH 146 | Actual | SEP 2000 | 16S | LANDSCAPE DEVELOPMENT | |
0389-05-083 | SH 146 | Actual | MAY 2001 | $2,277,676 | 5 | INSTALL COMPUTERIZED TRANSPORTATION MANAGEMENT SYSTEM |
0500-03-477 | IH 45 | Actual | JUN 2001 | $3,146,212 | 14 | REPLACE BRIDGE AND APPROACHES |
0500-03-497 | IH 45 | Actual | APR 2001 | $218,487 | 7 | JOINT SEPARATION REPAIR |
0500-03-500 | IH 45 | Actual | DEC 2000 | $1,828,027 | 7 | REPAIR AND REHAB APPROACH SLAB, ARMOR JOINT AND REPLACE |
0500-03-503 | IH 45 | Actual | JUL 2001 | $1,486,639 | 7 | JOINT AND CRACK SEAL CONCRETE ON FRONTAGE ROADS AND CRACK |
0508-01-297 | IH 10 | Actual | JAN 2001 | $157,750 | 7 | REMOVE AND REPLACE BEARING PADS |
0720-03-111 | SH 249 | Actual | MAY 2001 | $655,387 | 7 | IMPROVE INTERSECTIONS TURNING RADIUS |
0912-00-051 | VA | Actual | JUL 2001 | $750,000 | 5 | INSTALL HIGHWAY ADVISORY RADIO |
0912-00-123 | VA | Actual | AUG 2001 | $2,400,000 | 5 | ENHANCEMENTS AND EXPANSION OF COMPUTER SYSTEMS, BUILDING |
0912-00-124 | VA | Actual | AUG 2001 | $2,500,000 | 5 | ENHANCEMENTS AND EXPANSION OF COMPUTER SYSTEMS, BUILDING |
0912-00-177 | VA | Actual | NOV 2000 | $79,804 | 14 | ELECTRICAL SERVICES POLE REPLACEMENT |
0912-00-180 | VA | Actual | JUN 2001 | $909,296 | 11 | INSTALL OVERHEAD STREET NAME SIGNS AT SIGNALIZED |
0912-00-194 | VA | Actual | OCT 2000 | $1,552,128 | 11 | STRIPING |
0912-00-195 | VA | Actual | DEC 2000 | $1,522,891 | 11 | STRIPING |
0912-00-196 | VA | Actual | FEB 2001 | $1,514,634 | 11 | STRIPING |
0912-00-198 | VA | Actual | MAR 2001 | $463,272 | 10A | TRAFFIC SIGNALS (NON-SITE SPECIFIC) |
0912-00-201 | VA | Actual | DEC 2000 | $812,500 | 5 | FY 2001 CLEAN AIR COALITION (CAC) OUTREACH PROGRAM |
0912-00-216 | VA | Actual | JUL 2001 | $3,250,000 | 5 | FY 2001 CLEAN AIR ACTION TRANSIT PROGRAM |
0912-00-217 | VA | Actual | JUL 2001 | $2,187,500 | 5 | FY 2001 ALTERNATIVE FUEL PRGRAM |
0912-00-220 | VA | Actual | JUL 2001 | $2,187,500 | 5 | FY 2002 ALTERNATIVE FUEL PROGRAM |
0912-71-536 | CS | Actual | APR 2001 | $1,999,994 | 6B | REPLACE BRIDGE |
0912-71-585 | VA | Actual | FEB 2001 | $75,000 | 10B | INVENTORY OF EXISTING COMMUNICATIONS CABLE |
0912-71-616 | VA | Actual | MAY 2001 | $177,000 | 11 | NATIONAL POLLUTION DISCHARGE ELIMINATION STUDY PERMIT WITH |
0912-71-660 | VA | Actual | JUL 2001 | $3,165,878 | 5 | PROVIDE INTEGRATION FOR ONGOING HOUSTON ITS PRIORITY |
0912-71-671 | VA | Actual | JAN 2001 | $6,135,574 | 15 | DYNAMIC MESSAGE SIGNS FOR INCIDENT MANAGEMENT |
0912-71-683 | VA | Actual | NOV 2000 | $2,830,043 | 5 | HARRIS COUNTY RCTSS PROGRAM |
0912-71-693 | CS | Actual | AUG 2001 | $3,570,375 | 13D | RECONSTRUCT EXISTING ROAD |
0912-71-719 | VA | Actual | NOV 2000 | $567,779 | 16B | LANDSCAPE DEVELOPMENT |
0912-71-723 | VA | Actual | JAN 2001 | $1,326,250 | 11 | STRIPING |
0912-71-725 | VA | Actual | DEC 2000 | $654,914 | 11 | STRIPING |
0912-71-726 | VA | Actual | DEC 2000 | $283,483 | 11 | SMALL SIGN UPGRADE |
0912-71-727 | VA | Actual | JAN 2001 | $313,680 | 11 | SMALL SIGN UPGRADE |
0912-71-728 | VA | Actual | DEC 2000 | $274,537 | 11 | SMALL SIGN UPGRADE |
0912-71-729 | VA | Actual | FEB 2001 | $669,330 | 11 | SMALL SIGN UPGRADE |
0912-71-730 | VA | Actual | FEB 2001 | $1,548,459 | 11 | STRIPING |
0912-71-733 | VA | Actual | APR 2001 | $2,168,835 | 11 | CR /PM-FULL DEPTH REPAIR OF LONGITUDINAL JOINT SEPARATION, |
0912-71-734 | VA | Actual | JAN 2001 | $146,518 | 14 | UPGRADE GUARDRAIL TO STANDARD |
0912-71-742 | VA | Actual | MAY 2001 | $18,200 | 16S | LANDSCAPE DEVELOPMENT |
0912-71-743 | VA | Actual | NOV 2000 | $3,045,000 | 15 | ITS VALUE PRICING ON HOV LANES FOR METRO |
0912-71-746 | VA | Actual | JUN 2001 | $897,398 | 11 | STRIPING |
0912-71-748 | VA | Actual | AUG 2001 | $12,500,000 | 5 | NEW BUS SERVICE FOR METRO |
0912-71-749 | VA | Actual | AUG 2001 | $2,122,125 | 5 | FY 2001: TROLLEY /ACTIVITY CENTER SHUTTLES |
0912-71-754 | VA | Actual | AUG 2001 | $700,000 | 5 | AUTOMATED INCIDENT MANAGEMENT |
0912-71-755 | VA | Actual | AUG 2001 | $575,000 | 5 | ITS IN HIGH WATER AREAS |
0912-71-759 | VA | Actual | AUG 2001 | $6,390,804 | 5 | FY 2001: FUNDING FOR OPERATING ASSISTANCE OF 11 NEW SERVICE |
0912-71-760 | VA | Actual | AUG 2001 | $3,125,000 | 5 | FY 2001-2002: METRO RCTSS PROJECTS-OUTSIDE BW 8 ON BUS ROUTES |
0980-02-016 | FM 526 | Actual | FEB 2001 | $1,048,386 | 7 | SPOT BASE REPAIR, ACP O /L & PAVEMENT MARKINGS |
0981-01-092 | NASA 1 | Actual | SEP 2000 | $75,000 | 16S | LANDSCAPE DEVELOPMENT |
0981-01-095 | NASA 1 | Actual | JUL 2001 | $350,000 | 16S | LANDSCAPE DEVELOPMENT |
1062-02-019 | FM 2100 | Actual | SEP 2000 | $219,250 | 10A | CONSTRUCTION OF MISCELLANEOUS WORK |
1062-04-048 | FM 2100 | Actual | FEB 2001 | $2,106,042 | 7 | BASE REPAIR, MILLING, ACP OVERLAY AND PAVEMENT MARKS |
1685-01-079 | FM 1960 | Actual | FEB 2001 | $75,000 | 14 | INSTALLATION OF CHANGEABLE LANE ASSIGNMENT SYSTEM |
1685-05-077 | SH 6 | Actual | JUL 2001 | $1,145,228 | 3C | ULTRA THIN SURFACE WEARING COURSE |
1685-05-080 | SH 6 | Actual | APR 2001 | $192,343 | 7 | 2" PLANING, 2" ACP OVERLAY AND PAVEMENT MARKINGS |
3256-01-073 | BW 8 | Actual | DEC 2000 | $202,240 | 5 | FOR THE CONSTRUCTION OF ADDITIONAL RT TURN LANES CONSISTING |
3256-01-078 | BW 8 | Actual | JAN 2001 | $933,903 | 4F | THIN BOND CONCRETE OVERLAY OF FRONTAGE ROADS |
8041-12-008 | MH | Actual | JUN 2001 | $4,260,207 | 17 | CONSTRUCT 4-LN DIVIDED (RAISED MEDIAN) URBAN STREET FACILITY |
8041-12-010 | MH | Actual | JUN 2001 | $8,307,204 | 4C | CONSTRUCT 6-LN DIVIDED (RAISED MEDIAN) URBAN STREET FACILITY |
Montgomery County | ||||||
CCSJ | Highway | Let Status | Letting Date |
Contract Cost |
Fund Cat |
Description |
0110-03-046 | SH 75 | Actual | APR 2001 | $735,161 | 14 | ADD LEFT TURN LANE AND TRAFFIC SIGNAL |
0177-14-022 | LP 494 | Actual | JAN 2001 | $229,429 | 10A | LEFT TURN CHANNELIZATION AND TRAFFIC SIGNAL |
0338-02-036 | SH 105 | Actual | MAR 2001 | $1,953,886 | 7 | BASE AND ASPHALT REPAIR, CRACK SEAL |
0338-03-082 | SH 105 | Actual | SEP 2000 | $161,885 | 10A | INSTALLATION OF FULL-ACTUATED TRAFFIC SIGNAL |
0338-03-083 | SH 105 | Actual | DEC 2000 | $170,815 | 10A | UPGRADE EXISTING FLASHING BEACON TO A FULL-ACTUATED TRAFFIC |
0338-03-084 | SH 105 | Actual | APR 2001 | $2,391,853 | 7 | BASE AND ASPHALT REPAIR, ONE COURSE SURFACE TREATMENT AND |
0523-10-024 | FM 1488 | Actual | APR 2001 | $455,160 | 10A | WIDEN PAVEMENT FOR LEFT AND RIGHT TURN CHANNELIZATION AND |
0675-08-054 | IH 45 | Actual | JUN 2001 | $4,521,339 | 3E | CONSTRUCT 3-LANE SOUTHBOUND FRONTAGE ROAD GRADE SEPARATION |
0912-37-106 | CR | Actual | FEB 2001 | $7,927,228 | 4D | CONSTRUCT 4 LANES DIVIDED AND PANTHER CREEK BRIDGE |
0912-37-126 | VA | Actual | JAN 2001 | $1,264,635 | 7 | SMALL SIGN UPGRADE |
1259-01-023 | FM 1097 | Actual | OCT 2000 | $738,656 | 10A | LEFT TURN CHANNELIZATION |
1259-02-013 | FM 1097 | Actual | SEP 2000 | $250,000 | 14 | RAILROAD SIGNAL INSTALLATION |
1912-02-010 | FM 2090 | Actual | SEP 2000 | $256,841 | 11 | LEFT TURN CHANNELIZATION AND TRAFFIC SIGNAL |
2325-01-011 | FM 2432 | Actual | SEP 2000 | $888,888 | 10A | LEFT TURN CHANNELIZATION AND TRAFFIC SIGNAL |
2897-01-008 | FM 830 | Actual | NOV 2000 | $93,625 | 10A | INSTALLATION OF A FLASHING BEACON SIGNAL WITH SAFETY |
3050-02-015 | FM 2978 | Actual | JUN 2001 | $1,673,198 | 14 | BASE AND ASPHALT REPAIR, O.C.S.T., MILLING AND OVERLAY |
Waller County | ||||||
CCSJ | Highway | Let Status | Letting Date |
Contract Cost |
Fund Cat |
Description |
0114-11-073 | US 290 | Actual | APR 2001 | $1,938,969 | 7 | BS RP, PLN, ASPH REHAB O /L, SHLDR TX, PM |
0271-04-075 | IH 10 | Actual | AUG 2001 | $272,233 | 11 | REHABILITATE LIGHTING |
0523-02-024 | FM 362 | Actual | APR 2001 | $1,089,239 | 4F | PAVE SHOULDER AND ACP OVERLAY |
0527-02-014 | FM 1458 | Actual | JUN 2001 | $1,057,858 | 7 | BASE REPAIR, PLANING, ASPHALTIC SURFACE REHABILITATION, |
0912-56-032 | VA | Actual | FEB 2001 | $924,450 | 11 | SMALL SIGN UPGRADE |
1687-01-013 | FM 1736 | Actual | FEB 2001 | $1,482,021 | 8A | BASE REPAIR, WIDEN SUBGRADE, PAVE SHOULDER AND ACP OVERLAY |