Letting Schedule for April, 2020 County (FY 2021)
Bid Tabulations Dashboard
This report will no longer be updated, please access links on the Contract Letting page. The Electronic State Business Daily (ESBD), the Electronic Bidding System, and the project proposal are the official sources of advertisement and bidding information for the State and Local Lettings. Bidders should bid the project using the information found therein, including any addenda. These sources take precedence over information from other sources, including TxDOT webpages, which are unofficial and intended for informational purposes only. |
|
April, 2020 (FY 2021) | (see Links) |
SEP 2019 | OCT 2019 | NOV 2019 | DEC 2019 | JAN 2020 | FEB 2020 | MAR 2020 | APR 2020 | MAY 2020 | JUN 2020 | JUL 2020 | AUG 2020 | | |||||||
CCSJ | County/ District | Highway | Let Status | Contract Cost | Fund Cat | Description | DBE Goal |
---|---|---|---|---|---|---|---|
0322-01-051 | Bastrop/ Austin | SH 95 | Tentative | $840,823 | 8 | SAFETY TREAT FIXED OBJECTS AND ADD LEFT TURN LANE AT LAKE | 0.0 |
0330-02-018 | Bowie/ Atlanta | FM 44 | Tentative | $964,435 | 8 | PROFILE EDGELINE & CENTERLINE MARKINGS | 0.0 |
0111-04-035 | Brazoria/ Houston | FM 521 | Tentative | $1,842,000 | 1 | PAVEMENT REPAIR, SEAL COAT AND 1.5 IN PFC OVERLAY | 0.0 |
1004-02-017 | Brazoria/ Houston | FM 524 | Tentative | $1,774,000 | 1 | PAVEMENT REPAIR, SEAL COAT AND 1.5 IN ACP OVERLAY | 0.0 |
1004-01-060 | Brazoria/ Houston | FM 521 | Tentative | $953,000 | 1 | PAVEMENT REPAIR, SEAL COAT AND 1.5 IN ACP OVERLAY | 0.0 |
0914-22-072 | Caldwell/ Austin | VA | Tentative | $2,156,250 | 3 | FEASIBILITY STUDY FOR 7-MILE EXTENTION OF FM 150 AND 10-MILE | 0.0 |
0921-06-312 | Cameron/ Pharr | CS | Tentative | $455,927 | 3 | CONSTRUCT PEDESTRIAN INFRASTRUCTURE | 0.0 |
0275-02-070 | Carson/ Amarillo | IH 40 | Tentative | $1,771,340 | 8 | INSTALL MEDIAN BARRIER | 0.0 |
0389-02-052 | Chambers/ Beaumont | SH 146 | Tentative | $2,778,020 | 8 | HAZARD ELIMINATION & SAFETY | 0.0 |
0054-02-035 | Coleman/ Brownwood | US 84 | Tentative | $2,598,583 | 8 | IMPROVE GUARDRAIL | 0.0 |
1013-01-034 | Collin/ Dallas | FM 546 | Tentative | $4,531,756 | 8 | PROVIDE ADDITIONAL PAVED SURFACE WIDTH, SAFETY TREATED FIXED | 0.0 |
2247-01-011 | Collin/ Dallas | FM 2194 | Tentative | $2,612,952 | 8 | PROVIDE ADDITIONAL PAVED SURFACE WIDTH, SAFETY TREATED FIXED | 0.0 |
0257-05-049 | Comanche/ Brownwood | SH 6 | Tentative | $73,011 | 8 | MILLED EDGELINE AND CENTERLINE STRIPS | 0.0 |
0918-00-218 | Dallas/ Dallas | VA | Tentative | $892,819 | 3 | SUSTAINABLE DEVELOPMENT INITIATIVES; SAFETY AUDIT AND | 0.0 |
0918-47-227 | Dallas/ Dallas | CS | Tentative | $1,880,106 | 3 | IMPROVE TRAFFIC SIGNAL, INSTALL SIDEWALKS | 0.0 |
0269-06-059 | Dewitt/ Yoakum | US 183 | Tentative | $4,500,000 | 11 | ADD 3 LANES FOR A 4-LANE UNDIVIDED HIGHWAY WITH CONTINUOUS | 0.0 |
0126-03-034 | Eastland/ Brownwood | SH 6 | Tentative | $3,035,807 | 1 | BASE OVERLAY AND 2 COURSE SURFACE TREATMENT | 0.0 |
0257-04-030 | Eastland/ Brownwood | SH 6 | Tentative | $73,011 | 8 | MILLED EDGELINE/CENTERLINE RUMBLE STRIPS | 0.0 |
0257-03-035 | Eastland/ Brownwood | SH 6 | Tentative | $73,012 | 8 | MILLED EDGELINE/CENTERLINE RUMBLE STRIPS | 0.0 |
0228-06-089 | Ector/ Odessa | US 385 | Tentative | $320,502 | 8 | SAFETY LIGHTING AT INTERSECTION, ADD LEFT TURN | 0.0 |
0001-05-018 | El Paso/ El Paso | FM 259 | Tentative | $278,530 | 6 | REPLACE BRIDGE AND APPROACHES | 0.0 |
0343-04-044 | Erath/ Ft Worth | SH 108 | Tentative | $2,850,000 | 1 | REPAIR BASE FAILURES, REMOVE BRICK, MILL, HMAC OVERLAY, | 0.0 |
1154-01-020 | Fannin/ Paris | FM 824 | Tentative | $4,840,000 | 1 | 2R REHABILITATION | 0.0 |
0917-20-039 | Freestone/ Bryan | CR | Tentative | $430,000 | 6 | RPLACE EXISTING BRIDGE CONSISTING OF GRADING, STRUCTURES, | 0.0 |
0459-01-079 | Freestone/ Bryan | FM 488 | Tentative | $1,772,089 | 8 | SAFETY TREAT FIXED OBJECTS | 0.0 |
0976-03-104 | Galveston/ Houston | FM 518 | Tentative | $2,321,368 | 1 | CONSTRUCT 10 FT WIDE SHARED USE PATH ADJACENT TO HOT WATER | 0.0 |
0071-06-060 | Gillespie/ Austin | US 87 | Tentative | $356,032 | 8 | PROFILE EDGELINE MARKINGS AND PROFILE CENTERLINE MARKINGS | 0.0 |
0913-22-049 | Gonzales/ Yoakum | CR | Tentative | $675,000 | 6 | REPLACE BRIDGE AND APPROACHES | 0.0 |
2072-01-016 | Gregg/ Tyler | FM 2204 | Tentative | $5,181,154 | 8 | Install/Upgrade Drainage Structure(S) | 0.0 |
2827-01-011 | Grimes/ Bryan | FM 2 | Tentative | $9,079 | 10 | REPAIR FRONT SLOPE EROSION | 0.0 |
0050-03-106 | Grimes/ Bryan | SH 6 | Tentative | $135,355 | 10 | Emergency Relief | 0.0 |
0050-03-105 | Grimes/ Bryan | SH 6 | Tentative | $157,643 | 10 | Emergency Relief | 0.0 |
2827-01-012 | Grimes/ Bryan | FM 2 | Tentative | $23,405 | 10 | CULVERT AND SCOUR REPAIR | 0.0 |
0065-05-153 | Hardin/ Beaumont | US 96 | Tentative | $0 | 8 | HIGH FRICTION SURFACE TREATMENT (CURVE) | 0.0 |
0065-05-152 | Hardin/ Beaumont | US 96 | Tentative | $973,708 | 8 | INSTALL RAISED MEDIAN | 0.0 |
0028-01-099 | Harris/ Houston | US 90A | Tentative | $3,726,000 | 1 | Surfacing/Roadway Restoration | 0.0 |
3510-06-007 | Harris/ Houston | SH 99 | Tentative | $63,000,000 | 3 | CONSTRUCT 4 DCS (TOLL) (SEGMENT F-1) | 0.0 |
0912-72-397 | Harris/ Houston | VA | Tentative | $1,552,000 | 3 | CONSTRUCT NEW 5 FT SIDEWALKS ALONG CITY OWNED ROADWAYS | 0.0 |
0914-33-064 | Hays/ Austin | CR | Tentative | $870,818 | 6 | REHABILITATE BRIDGE AND APPROACHES | 0.0 |
0914-33-077 | Hays/ Austin | VA | Tentative | $0 | 3 | Construct Pedestrian Infrastructure | 0.0 |
0016-02-166 | Hays/ Austin | IH 35 | Tentative | $2,033,810 | 8 | Hazard Elimination & Safety | 0.0 |
3370-01-008 | Hopkins/ Paris | FM 3389 | Tentative | $3,849,450 | 1 | 2R REHABILITATION | 0.0 |
0911-28-047 | Houston/ Lufkin | CR | Tentative | $3,180,000 | 6 | REPLACE BRIDGE AND APPROACHES | 0.0 |
1495-01-009 | Hunt/ Paris | FM 1566 | Tentative | $3,590,400 | 1 | 2R REHABILITATION | 0.0 |
0134-05-034 | Jack/ Ft Worth | SH 59 | Tentative | $2,727,091 | 1 | ADD TURN LANES | 0.0 |
0014-03-087 | Johnson/ Ft Worth | IH 35W | Tentative | $4,319,146 | 6 | REMOVE THRU LANE OVERPASS & REPLACE WITH AT GRADE THRU LANES | 0.0 |
1552-01-011 | Karnes/ Corpus Christi | FM 1020 | Tentative | $466,400 | 6 | REPLACE BRIDGE AND APPROACHES | 0.0 |
0133-03-038 | Knox/ Childress | US 82 | Tentative | $9,000,000 | 1 | SUPER 2 | 0.0 |
0251-05-060 | Lampasas/ Brownwood | US 281 | Tentative | $27,568 | 8 | PROFILE CENTERLINE MARKINGS | 0.0 |
0251-04-028 | Lampasas/ Brownwood | US 281 | Tentative | $27,568 | 8 | PROFILE CENTERLINE MARKINGS | 0.0 |
0593-01-122 | Liberty/ Beaumont | SH 321 | Tentative | $1,906,263 | 8 | SAFETY TREAT FIXED OBJECTS | 0.0 |
0909-40-075 | Limestone/ Waco | CR | Tentative | $1,282,000 | 6 | REPLACE BRIDGE AND APPROACHES | 0.0 |
1819-01-015 | Lipscomb/ Amarillo | FM 1920 | Tentative | $9,457,800 | 1 | HAZARD ELIMINATION & SAFETY | 0.0 |
0905-00-081 | Lubbock/ Lubbock | VA | Tentative | $2,500,000 | 1 | REHABILITATION OF EXISTING ROAD | 0.0 |
0055-01-029 | Mills/ Brownwood | US 84 | Tentative | $1,452,309 | 8 | PROFILE CENTER AND EDGELINE MARKINGS | 0.0 |
0920-06-035 | Newton/ Beaumont | CR | Tentative | $300,000 | 6 | REPLACE BRIDGE & APPROACHES | 0.0 |
0916-00-090 | Nueces/ Corpus Christi | VA | Tentative | $1,000,000 | 1 | DISTRICT WIDE PAVEMENT MARKINGS AND MARKERS-PLANNING CSJ | 0.0 |
0090-02-053 | Oldham/ Amarillo | IH 40 | Tentative | $1,622,305 | 8 | IMPROVE GUARDRAIL TO DESIGN STANDARDS | 0.0 |
1286-01-018 | Orange/ Beaumont | FM 1078 | Tentative | $0 | 8 | SAFETY TREAT FIXED OBJECTS, MILLED CENTERLINE RUMBLE STRIPS | 0.0 |
0249-08-043 | Palo Pinto/ Ft Worth | US 281 | Tentative | $1,224,496 | 1 | REPAIR BASE FAILURES, MILL, HMAC OVERLAY, PAVEMENT MARKINGS | 0.0 |
0365-01-049 | Parker/ Ft Worth | SH 171 | Tentative | $0 | 1 | Resurface Roadway | 0.0 |
2451-03-017 | Reeves/ Odessa | RM 652 | Tentative | $9,750,000 | 11 | ROADWAY REHABILITATION | 0.0 |
0262-06-032 | Robertson/ Bryan | FM 391 | Tentative | $600,000 | 6 | REPLACE EXISTING BRIDGE CONSISTING OF GRADING, STRUCTURES, | 0.0 |
0272-03-038 | San Saba/ Brownwood | US 190 | Tentative | $4,710,000 | 1 | REHABILITATE URBAN ROADWAY | 0.0 |
0747-04-076 | Tarrant/ Ft Worth | FM 157 | Tentative | $1,647,895 | 1 | REPAIR BASE FAILURES, MILL, SMA OVERLAY, PAVEMENT MARKINGS | 0.0 |
0747-03-081 | Tarrant/ Ft Worth | FM 157 | Tentative | $1,724,125 | 1 | REPAIR BASE FAILURES, OVERLAY, PAVEMENT MARKINGS | 0.0 |
0008-14-120 | Tarrant/ Ft Worth | IH 820 | Tentative | $590,399 | 8 | MILLED EDGELINE RUMBLE STRIPS | 0.0 |
0159-01-042 | Tom Green/ San Angelo | US 277 | Tentative | $277,844 | 8 | INSTALL TRAFFIC SIGNAL L | 0.0 |
0683-02-074 | Travis/ Austin | RM 620 | Tentative | $6,988,185 | 2M | INSTALL ITS SIGNS AND DEVICES | 0.0 |
0700-03-149 | Travis/ Austin | SH 71 | Tentative | $2,920,338 | 2M | INSTALL ITS SIGNS AND DEVICES | 0.0 |
0265-01-118 | Travis/ Austin | SH 71 | Tentative | $826,450 | 2M | INSTALL ITS SIGNS AND DEVICES | 0.0 |
0113-13-182 | Travis/ Austin | SL 360 | Tentative | $1,336,030 | 8 | INSTALL MEDIAN BARRIER | 0.0 |
0113-13-180 | Travis/ Austin | SL 360 | Tentative | $5,599,304 | 2M | Purchase And Install Signs & Equip | 0.0 |
2100-01-068 | Travis/ Austin | RM 2222 | Tentative | $3,934,903 | 2M | INSTALL ITS SIGNS AND DEVICES | 0.0 |
0914-04-319 | Travis/ Austin | VA | Tentative | $1,668,000 | 3 | CONSTRUCT 10 PEDESTRIAN HYBRID BEACONS | 0.0 |
0920-13-034 | Tyler/ Beaumont | CR | Tentative | $326,000 | 6 | REPLACE BRIDGE & APPROACHES | 0.0 |
0495-02-062 | Van Zandt/ Tyler | IH 20 | Tentative | $833,908 | 6 | REPLACE BRIDGE RAIL | 0.0 |
0543-01-066 | Waller/ Houston | FM 359 | Tentative | $150,800 | 8 | INSTALL LED FLASHING CHEVRONS (CURVE) | 0.0 |
0186-06-089 | Washington/ Bryan | US 290 | Tentative | $196,645 | 10 | Emergency Relief | 0.0 |
0683-01-098 | Williamson/ Austin | RM 620 | Tentative | $635,704 | 2M | INSTALL ITS SIGNS AND DEVICES | 0.0 |
0440-02-019 | Williamson/ Austin | SH 195 | Tentative | $827,868 | 8 | CLOSE CROSSOVER | 0.0 |
0204-02-033 | Williamson/ Austin | US 79 | Tentative | $783,892 | 8 | INSTALL INTERSECTION FLASHING BEACON | 0.0 |
0337-01-043 | Williamson/ Austin | SH 29 | Tentative | $5,292,309 | 2M | RECONSTRUCT RDWY FROM EXIST 4-LANE RDWY WITH CLTL TO 4-LANE | 0.0 |
|