Letting Schedule for June, 2016 (FY 2016)

Last Update: Wednesday, May 25, 2016
June, 2016 (FY 2016) (see Links)
SEP 2015 | OCT 2015 | NOV 2015 | DEC 2015 | JAN 2016 | FEB 2016 | MAR 2016 | APR 2016 | MAY 2016 | JUN 2016 | JUL 2016 | AUG 2016
CCSJ County/
District
Highway Let Status Contract
Cost
Fund
Cat
Description
0156-05-058 Archer/
Wichita Falls
US 82 Approved $1,861,233 11 MILL AND INLAY
0472-01-041 Bastrop/
Austin
SH 21 Approved $399,761 1 CONVERT 4 - LANE UNDIVIDED TO A MODIFIED SUPER 2 WITH SHOULDER
0025-02-198 Bexar/
San Antonio
IH 10 Approved $62,884,487 ROW CONSTRUCT GRADE SEPARATION AT WOODLAKE PARKWAY; INTERSECTION
0072-07-068 Bexar/
San Antonio
IH 10 Approved $7,691,467 1 REPLACE EXISTING 2 LANE BRIDGE WITH 4 LANE BRIDGE, SIDEWALK,
2452-01-056 Bexar/
San Antonio
SL 1604 Approved $73,843,578 ROW EXPAND TO 4 LANE EXPRESSWAY - 4 NON - TOLL LANES
0700-01-040 Burnet/
Austin
SH 71 Approved $105,150 8 INSTALL INTERSECTION FLASHING BEACON
0199-03-028 Cherokee/
Tyler
US 69 Approved $16,091,811 1 WIDEN 2 LANE ROADWAY TO 4 LANE DIVIDED CURB & GUTTER ROADWAY
1357-02-012 Cooke/
Wichita Falls
FM 678 Approved $1,414,595 11 WIDEN PAVEMENT AND OVERLAY
0076-03-019 Crockett/
Odessa
US 67 Approved $2,921,925 6 REPL BRIDGE & APPR, RAIL, MBGF, FLBS, SEAL COAT, SIGNS & PAV
0092-02-122 Dallas/
Dallas
SH 310 Approved $1,463,984 1 IMPROVE GUARDRAIL TO DESIGN STANDARDS
0442-02-158 Dallas/
Dallas
IH 35E Approved $1,075,911 8 IMPROVE TRAFFIC SIGNALS
0353-02-075 Denton/
Dallas
SH 114 Approved $666,384 1 FLEXIBLE PAVEMENT REPAIR, MILL, OVERLAY AND PAVEMENT
0924-06-512 El Paso/
El Paso
CS Approved $458,517 3 CONSTRUCT SIDEWALKS AND ADA ACCESSIBLE RAMPS ON NONAP RD, BR
0924-06-520 El Paso/
El Paso
CS Approved $445,216 3 SOCORRO SAFE ROUTES TO SCHOOL, PHASE 2 (BUILD SIDEWALKS / CROS
0909-38-052 Falls/
Waco
CR Approved $241,532 6 REPLACE BRIDGE AND APPROACHES
0051-08-017 Galveston/
Houston
SS 342 Approved $1,632,254 1 4" MILLING, BASE REPAIR, 1.5" ACP OVERLAY AND PROFILE
0628-01-022 Galveston/
Houston
FM 519 Approved $4,509,399 1 1.5" MILLING, BASE REPAIR, 318 AR, 1.5" ACP OVERLAY AND
0047-18-074 Grayson/
Paris
US 75 Approved $4,428,140 1 CONSTRUCT U - TURN BRIDGE
0901-19-182 Grayson/
Paris
CR Approved $971,409 6 REPLACE BRIDGE AND APPROACHES
2455-01-032 Grayson/
Paris
FM 1417 Approved $18,085,223 1 INSTALL CONTINUOUS TURN LANE, WIDEN PAVED
0909-29-020 Hamilton/
Waco
CR Approved $695,031 6 REPLACE BRIDGE AND APPROACHES
0271-06-121 Harris/
Houston
IH 10 Approved $2,266,072 3 INTERSECTION ENHANCEMENTS AT 6 LOCATIONS (PED RAMPS,
0502-01-212 Harris/
Houston
SH 225 Approved $1,144,894 1 DRAINAGE IMPROVEMENTS ON EB FRONTAGE ROAD IN SECTIONS
0508-01-351 Harris/
Houston
IH 10 Approved $41,949,296 3 REPLACE BRIDGE AND APPROACHES
0912-70-103 Harris/
Houston
CS Approved $3,953,128 3 CONSTRUCT PEDESTRIAN AND BIKE BRIDGE OVER BRAYS BAYOU AND
0063-09-015 Harrison/
Atlanta
US 59 Approved $5,748,000 1 RESURFACE EXISTING 4 - LANE RURAL HIGHWAY
0921-02-325 Hidalgo/
Pharr
CS Approved $1,020,265 3 CONSTRUCT BENSTSEN ROAD HIKE & BIKE TRAIL
1662-01-015 Hill/
Waco
FM 339 Approved $597,013 6 REPLACE BRIDGE AND APPROACHES
0911-28-036 Houston/
Lufkin
CR Approved $730,403 6 REPLACE BRIDGE AND APPROACHES
0913-18-028 Jackson/
Yoakum
CR Approved $819,834 6 REPLACE BRIDGE AND APPROACHES
0003-04-051 Jeff Davis/
El Paso
IH 10 Approved $775,158 1 BRIDGE RAIL REPLACEMENT AT ADOBE DRAW BRIDGE (ON FRONTAGE
0200-14-079 Jefferson/
Beaumont
US 69 Approved $2,982,063 1 RELOCATE RAMPS ENTRANCE AND EXIT
0653-01-014 Jefferson/
Beaumont
SS 136 Approved $391,503 6 REPLACE BRIDGE AND APPROACHES
0920-00-118 Jefferson/
Beaumont
VA Approved $799,458 10 INSTALL LANDSCAPING
0095-03-087 Kaufman/
Dallas
US 80 Approved $4,691,277 1 RELOCATION OF EB US 80 ENTRANCE & EXIT RAMPS BETWEEN FM 460
1008-02-018 Lavaca/
Yoakum
FM 958 Approved $4,127,016 1 RESTORE ROADWAY
0593-01-117 Liberty/
Beaumont
SH 105 Approved $1,117,738 1 INSTALL CONTINUOUS TURN LANE, TEXTURIZE SHOULDERS (ROLLED - IN
0355-01-048 Lipscomb/
Amarillo
SH 15 Approved $8,364,368 1 OVERLAY
0578-01-029 Madison/
Bryan
FM 247 Approved $5,462,154 1 REHABILITATE EXISTING ROAD CONSISTING OF GRADING, STRUCTURES
0300-01-091 Maverick/
Laredo
US 277 Approved $423,983 8 TEXTURIZE SHOULDERS (ROLLED OR MILLED IN) CENTERLINE TEXTURE
0258-08-032 McLennan/
Waco
SH 6 Approved $5,243,272 1 REHABILITATE ROADWAY AND ADD PASSING LANES
0013-05-058 Montague/
Wichita Falls
US 81 Approved $4,460,482 11 HEAVY HOT MIX OVERLAY
1407-02-022 Nacogdoches/
Lufkin
FM 1638 Approved $1,208,750 8 SAFETY TREAT FIXED OBJECTS
0305-05-044 Newton/
Beaumont
SH 87 Approved $2,235,425 11 OVERLAY EXISTING ROADWAY
0916-00-081 Nueces/
Corpus Christi
VA Approved $1,278,973 1 DISTRICT WIDE PAVEMENT MARKINGS AND MARKERS
0314-07-065 Parker/
Fort Worth
IH 20 Approved $350,000 3 LANDSCAPING ENHANCEMENTS
0911-04-067 Polk/
Lufkin
CR Approved $1,078,548 6 REPLACE BRIDGE AND APPROACHES
0090-06-039 Potter/
Amarillo
BI 40-D Approved $958,216 1 REHAB TRAFFIC SIGNALS
0275-01-177 Potter/
Amarillo
IH 40 Approved $30,242,795 1 REHAB, CONCRETE PAV, RAMP IMPROVEMENTS, AND MISC CONSTRUCTION
0139-03-040 Reeves/
Odessa
US 285 Approved $11,411,082 1 HMAC, FLBS, SEAL COAT, SIGN & PAV MRK
0911-39-051 Shelby/
Lufkin
CR Approved $860,611 6 REPLACE BRIDGE AND APPROACHES
0259-02-050 Somervell/
Fort Worth
US 67 Approved $9,490,070 1 MILL, PRIME, SEAL COAT, HMAC OVERLAY, GUARDRAIL, PAVEMENT
0008-12-090 Tarrant/
Fort Worth
IH 20 Approved $108,580 10 INSTALL PLANTS AND IRRIGATION
0902-00-138 Tarrant/
Fort Worth
VA Approved $823,110 3 WRONG WAY DRIVING, TECHNOLOGY AND ITS TECHNOLOGY TO WRONG
0015-13-380 Travis/
Austin
IH 35 Approved $16,613,722 ROW ADD SHOULDERS, AUXILIARY LNS, RAMP IMPROVEMENTS, PAVEMENT
0914-04-273 Travis/
Austin
VA Approved $2,760,500 3 CONSTRUCT BLAKE - MANOR SHARED USE PATH FOR USE BY BICYCLES &
0315-08-037 Washington/
Bryan
FM 389 Approved $4,044,619 1 REHABILITATE EXISTING ROADWAY CONSISTING OF GRADING,
0015-09-180 Williamson/
Austin
IH 35 Approved $10,408,345 ROW RAMPS REVERSALS
1279-01-036 Zavala/
Laredo
FM 1025 Approved $9,629,344 1 REHABILITATION OF AN EXISTING ROAD


Let Status Definition
Tentative Estimated letting date for this project
Approved Project has administrative approval to be let
Actual Project was let to contract