0336-03-001 | Angelina/ Lufkin |
SH 103 | Actual | $55,491 | 10 | ABUTMENT REPAIRS |
2589-01-022 | Angelina/ Lufkin |
FM 2497 | Actual | $28,808 | 10 | GRADING AND STRUCTURE REPAIRS |
2750-01-003 | Angelina/ Lufkin |
FM 2680 | Actual | $108,747 | 10 | GRADING & STRUCTURE |
1739-03-010 | Atascosa/ San Antonio |
FM 791 | Actual | $179,836 | 8 | INSTALL RAILROAD SIGNAL WITH GATES AT DOT 435 728B |
0114-04-068 | Bastrop/ Austin |
US 290 | Actual | $2,027,917 | 3 | SAFETY LIGHTING |
0265-03-047 | Bastrop/ Austin |
SH 71 | Actual | $97,196 | 10 | REMOVE DAMAGE CONCRETE RIPRAP, REPLACE STONE PROTECTION |
0322-01-048 | Bastrop/ Austin |
SH 95 | Actual | $137,764 | 10 | REMOVE DAMAGED CONCRETE, FLOWABLE BACKFILL, TEMPORARY SHORING |
2686-01-013 | Bastrop/ Austin |
FM 2571 | Actual | $360,815 | 10 | EXCAVATION, TEMPORARY SHORING, SOIL NAIL ANCHORS AND SOIL |
0231-04-059 | Bell/ Waco |
US 190 | Actual | $5,400 | 10 | BRIDE REPLACEMENT (DEBRIS REMOVAL) |
0232-01-051 | Bell/ Waco |
SH 53 | Actual | $5,100 | 10 | BRIDGE REPLACEMENT (DEBRIS REMOVAL) |
0073-08-181 | Bexar/ San Antonio |
US 281 | Actual | $8,673,181 | 1 | MILL, SEAL COAT, OVERLAY AND PAVEMENT MARKINGS |
0521-01-050 | Bexar/ San Antonio |
SL 13 | Actual | $2,849,994 | 1 | OVERLAY & PAVEMENT MARKINGS |
0915-00-166 | Bexar/ San Antonio |
VA | Actual | $1,355,868 | 1 | DISTRICTWIDE NON - SITE SPECIFIC TRAFFIC SIGNALS - FY 2016 |
0915-00-193 | Bexar/ San Antonio |
VA | Actual | $865,000 | 1 | PURCHASE OF DYNAMIC MESSAGE SIGNS FOR EMERGENCY OPERATIONS |
0915-12-572 | Bexar/ San Antonio |
CS | Actual | $171,316 | 8 | INSTALL OVERHEAD CANTILEVERS, SIGNING, REPLACE CROSSING |
2104-02-027 | Bexar/ San Antonio |
FM 1957 | Actual | $46,305,602 | 3 | EXPAND FROM 2 LANES TO 4 LANE DIVIDED |
0954-02-018 | Blanco/ Austin |
RM 165 | Actual | $3,345,957 | 10 | REPLACE BRIDGE |
0954-02-019 | Blanco/ Austin |
RM 165 | Actual | $199,605 | 10 | STONE RIPRAP REPLACEMENT, REMOVE AND REPLACE MBGF, ONE WAY |
0258-04-034 | Bosque/ Waco |
SH 6 | Actual | $5,936,806 | 1 | UNDERSEAL / LEVELUP / OVERLAY |
0919-19-079 | Bowie/ Atlanta |
CR | Actual | $23,500 | 8 | INSTALL WARNING DEVICES |
0598-02-097 | Brazoria/ Houston |
SH 288 | Actual | $6,895,442 | 1 | PAVEMENT REPAIR, SEAL COAT, ACP OVERLAY AND PAVEMENT MARKING |
0847-02-015 | Brazoria/ Houston |
FM 521 | Actual | $1,597,258 | 1 | PAVEMENT REPAIR AND 1.5" ACP OVERLAY |
0054-07-069 | Brown/ Brownwood |
US 84 | Actual | $8,488,150 | 6 | RAILROAD BRIDGE REPLACEMENT AND ROADWAY WIDENING INCLUDING |
0181-02-029 | Callahan/ Abilene |
SH 36 | Actual | $5,388,974 | 1 | SPOT BASE REPAIR, ASPHALT CONCRETE PAVEMENT LEVEL UP & |
0921-06-270 | Cameron/ Pharr |
CS | Actual | $899,908 | 3 | EXPAND EXIST. HIKE & BIKE TRAIL (BROWNSVILLE HISTORIC TRAIL |
0921-06-295 | Cameron/ Pharr |
CS | Actual | $196,817 | 8 | INSTALLATION OF FLASHING LIGHT SIGNAL |
0921-06-297 | Cameron/ Pharr |
CS | Actual | $187,998 | 8 | INSTALLATION OF FLASHING LIGHT SIGNAL |
0921-06-298 | Cameron/ Pharr |
CS | Actual | $194,163 | 8 | INSTALLATION OF FLASHING SIGNAL BEACON |
0797-07-030 | Collingsworth/ Childress |
FM 1547 | Actual | $1,184,684 | 6 | BRIDGE REPLACEMENT |
0016-04-111 | Comal/ San Antonio |
IH 35 | Actual | $5,557,723 | 1 | SEAL COAT, PFC OVERLAY & PAVEMENT MARKINGS ON MAINLANES |
0915-17-064 | Comal/ San Antonio |
CS | Actual | $241,935 | 8 | INSTALL RAILROAD SIGNAL WITH GATES AT DOT 415 575V |
0044-08-067 | Cooke/ Wichita Falls |
US 82 | Actual | $4,684,274 | 1 | INTERSECTION IMPROVEMENTS (MID / LONG TERM) |
0197-02-122 | Dallas/ Dallas |
US 175 | Actual | 103,886,640 | ROW | EXTEND US 175; RECON SM WRIGHT / SH 310 INC; 2 LN DC W OF INC; |
0918-00-231 | Dallas/ Dallas |
VA | Actual | $1,500,000 | 3 | FREEWAY INCIDENT MANAGEMENT PROGRAM; FY 2015 FUNDING; |
0918-00-262 | Dallas/ Dallas |
VA | Actual | $1,050,000 | 3 | AIR QUALITY MARKETING AND EDUCATION PROGRAM |
0918-47-151 | Dallas/ Dallas |
CS | Actual | $96,977 | 8 | IMPROVE TRAFFIC SIGNALS |
0918-47-166 | Dallas/ Dallas |
CS | Actual | $246,890 | 8 | INSTALL RAILROAD WARNING SIGNALS AND GATES |
0918-47-167 | Dallas/ Dallas |
CS | Actual | $378,000 | 8 | INSTALL RAILROAD WARNING SIGNALS AND GATES |
1068-04-148 | Dallas/ Dallas |
IH 30 | Actual | $7,991,673 | 7 | CONSTRUCT 0 TO 2 / 3 LANE EASTBOUND FRONTAGE ROAD AND RAMP |
0226-04-025 | Deaf Smith/ Amarillo |
US 385 | Actual | $8,318,208 | 1 | OVERLAY |
0708-01-029 | Eastland/ Brownwood |
FM 101 | Actual | $295,496 | 8 | INSTALL SIGNALS |
0906-00-179 | Ector/ Odessa |
VA | Actual | $386,848 | 8 | INSTALL RR SIGNALS, GATE ARMS, AND CANTILEVERS |
0924-06-526 | El Paso/ El Paso |
VA | Actual | $1,486,634 | 7 | TWELVE BUS ENGINE REBUILDS TO EXTEND USEFUL LIFE ON BUSES TO |
0924-06-529 | El Paso/ El Paso |
CS | Actual | $236,629 | 8 | INSTALL LIGHTS AND GATES AT RAILROAD CROSSING |
0550-03-024 | Erath/ Fort Worth |
FM 914 | Actual | $3,426,804 | 8 | ADD SHOULDERS, SAFETY END TREATMENTS, SEAL COAT AND PAVEMENT |
0027-08-172 | Fort Bend/ Houston |
US 90A | Actual | $2,933,336 | 1 | BASE REPAIR AND 1.5" ACP OVERLAY |
0912-34-187 | Fort Bend/ Houston |
VA | Actual | $992,941 | 3 | INSTALLATION OF DYNAMIC MESSAGE SIGNS |
1258-03-042 | Fort Bend/ Houston |
FM 1093 | Actual | $63,811,754 | 3 | CONSTRUCT 4 TOLL LANES WITH TWO 2 - LANE FRONTAGE ROADS |
0088-03-040 | Goliad/ Corpus Christi |
US 59 | Actual | $3,511,639 | 1 | DISTRICT WIDE HOT RUBBER SEAL 2016 PROJECT |
0045-02-032 | Grayson/ Paris |
SH 56 | Actual | $261,948 | 10 | REPLACE DAMAGED PIPE AND MANHOLES WITH NEW LINE DUE TO FLOOD |
0081-10-044 | Grayson/ Paris |
US 377 | Actual | $150,157 | 10 | REPAIR OF ROADWAY SURFACE DUE TO FLOODING |
0912-00-460 | Harris/ Houston |
VA | Actual | $2,500,000 | 3 | COMMUTE SOLUTIONS PROGRAM IMPLEMENTATION COMMUTER AND |
0912-00-478 | Harris/ Houston |
VA | Actual | $500,000 | 1 | ITS SUPPORT (NON - LET) (TRANSTAR) |
0912-00-529 | Harris/ Houston |
VA | Actual | $8,000,000 | 3 | FY 15 INCIDENT MANAGEMENT PROGRAM |
0912-70-105 | Harris/ Houston |
CR | Actual | $3,061,039 | 3 | INSTALL LED BRIDGE LIGHTING ON IH 69 ARCH BRIDGES AND |
0912-70-106 | Harris/ Houston |
VA | Actual | $122,421 | 10 | REPAIR OR REPLACE DAMAGED TRAFFIC CONTROL DEVICES |
0912-70-107 | Harris/ Houston |
VA | Actual | $44,582 | 10 | CLEAN AND REPLACED DAMAGED COMPONENTS, RESET BREAKERS |
0912-72-356 | Harris/ Houston |
CS | Actual | $163,655 | 8 | FY 2016 RR SIGNAL & WARNING DEVICES (UPRR DOT# 859 524M) |
0912-72-357 | Harris/ Houston |
CS | Actual | $194,671 | 8 | FY 2016 RR SIGNAL & WARNING DEVICES (UPRR DOT# 859 523F) |
1685-03-088 | Harris/ Houston |
FM 1960 | Actual | $6,636,001 | 1 | MILL & ACP OVERLAY |
3256-02-091 | Harris/ Houston |
SL 8 | Actual | $596,805 | 1 | CONSTRUCT CRACK ATTENUATING MIX (CAM) AND THIN OVERLAY MIX |
0285-03-060 | Hays/ Austin |
RM 12 | Actual | $669,492 | 10 | BRIDGE STRUCTURE REPAIRS |
0921-02-301 | Hidalgo/ Pharr |
CS | Actual | $6,998,410 | 3 | WIDEN TO 4 LANE DIVIDED - CURB & GUTTER SECTION |
0109-05-041 | Houston/ Lufkin |
SH 19 | Actual | $47,124 | 10 | ROADWAY REPAIRS |
0002-05-044 | Hudspeth/ El Paso |
IH 10 | Actual | $3,057,663 | 8 | TEXTURIZE SHOULDERS (PROFILE PAVEMENT MARKERS) |
0692-01-017 | Hunt/ Paris |
FM 1570 | Actual | $2,207,943 | 1 | TY - F OVERLAY |
0913-18-030 | Jackson/ Yoakum |
CS | Actual | $248,000 | 8 | 2016 FEDERAL RAILROAD SIGNAL PROGRAM |
0306-03-121 | Jefferson/ Beaumont |
SH 87 | Actual | $3,158,876 | 1 | OVERLAY EXISTING ROADWAY |
0920-38-258 | Jefferson/ Beaumont |
CS | Actual | $279,500 | 8 | RAILROAD SIGNAL UPGRADE |
0255-01-081 | Jim Wells/ Corpus Christi |
US 281 | Actual | $1,764,248 | 1 | FLEXIBLE PAVEMENT STRUCT REPAIR - SB LANES ONLY |
0916-37-034 | Jim Wells/ Corpus Christi |
CR | Actual | $342,500 | 8 | RAILROAD SIGNAL UPGRADE |
0916-37-035 | Jim Wells/ Corpus Christi |
CR | Actual | $391,600 | 8 | RAILROAD SIGNAL UPGRADE |
0019-01-144 | Johnson/ Fort Worth |
SH 174 | Actual | $3,929,910 | 1 | 2 IN SALV, HAUL & STKPL RCL APH PV, HMAC INLAY |
0215-06-038 | Kendall/ San Antonio |
SH 46 | Actual | $1,279,972 | 1 | BASE REPAIR, MILL, SEAL COAT, OVERLAY AND PAVEMENT MARKINGS |
0017-08-099 | La Salle/ Laredo |
IH 35 | Actual | $5,240,014 | 8 | INSTALLATION OF RAILROAD SIGNALS |
0018-02-067 | La Salle/ Laredo |
IH 35 | Actual | $5,671,466 | 1 | THIN OVERLAY MIXTURE |
0018-02-071 | La Salle/ Laredo |
IH 35 | Actual | $1,355,672 | 1 | RESURFACE OF EXISTING HIGHWAY |
1007-03-021 | Lavaca/ Yoakum |
FM 532 | Actual | $2,844,207 | 1 | RESTORE ROADWAY |
0917-16-034 | Leon/ Bryan |
CR | Actual | $357,814 | 6 | REPLACE EXISTING BRIDGE CONSISTING OF GRADING, STRUCTURES, |
0419-02-041 | Limestone/ Waco |
SH 171 | Actual | $3,653,777 | 1 | UNDERSEAL / OVERLAY |
0053-01-120 | Lubbock/ Lubbock |
US 84 | Actual | $14,947,746 | 1 | NEW INTERCHANGE |
0905-00-074 | Lubbock/ Lubbock |
VA | Actual | $3,617,792 | 1 | MISCELLANEOUS CONSTRUCTION |
0905-06-006 | Lubbock/ Lubbock |
CS | Actual | $276,633 | 8 | FY 2016 REPLANKING |
0005-04-069 | Martin/ Odessa |
IH 20 | Actual | $759,179 | 8 | INSTALL INTERSECTION FLASHING BEACON |
0909-22-166 | McLennan/ Waco |
CS | Actual | $755,455 | 6 | REPLACE BRIDGE AND APPROACHES |
0338-02-042 | Montgomery/ Houston |
SH 105 | Actual | $3,979,077 | 1 | PLANING, BASE REPAIR, ONE COURSE SURFACE TREATMENT AND 1.5" |
3050-02-024 | Montgomery/ Houston |
FM 2978 | Actual | $15,788,778 | 1 | WIDEN FROM 2 TO 4 LANES |
3538-01-044 | Montgomery/ Houston |
SH 242 | Actual | $275,773 | 8 | IMPROVE TRAFFIC SIGNALS AT INTERSECTION |
0557-01-028 | Moore/ Amarillo |
SH 152 | Actual | $15,561,611 | 1 | OVERLAY |
0176-01-109 | Nacogdoches/ Lufkin |
US 59 | Actual | $2,458,818 | 8 | REPLACE BRIDGE AND APPROACH RAILING |
1277-01-015 | Newton/ Beaumont |
FM 1012 | Actual | $1,777,741 | 6 | REPLACE BRIDGE AND APPROACHES |
0916-35-177 | Nueces/ Corpus Christi |
CR | Actual | $299,375 | 6 | REPLACE BRIDGE AND APPROACHES |
0640-02-029 | Panola/ Atlanta |
FM 31 | Actual | $3,629,436 | 1 | STRENGTHEN BASE AND RESURFACE EXISTING 2 - LANE HIGHWAY |
0731-01-051 | Panola/ Atlanta |
FM 123 | Actual | $3,958,706 | 8 | REHABILITATE PAVMENT ON EXISTING 2 - LANE RURAL HIGHWAY |
0168-02-030 | Parmer/ Lubbock |
US 60 | Actual | $14,851,976 | 1 | REHABILITATION OF EXISTING ROAD |
0213-04-046 | Polk/ Lufkin |
US 190 | Actual | $1,486,579 | 8 | SAFETY TREAT FIXED OBJECTS |
0904-00-159 | Potter/ Amarillo |
VA | Actual | $1,028,989 | 1 | THERMOPLASTIC STRIPING |
0427-01-037 | Red River/ Paris |
FM 44 | Actual | $4,617,292 | 1 | REHAB |
0009-12-072 | Rockwall/ Dallas |
IH 30 | Actual | $32,882,301 | 3 | RECONSTRUCT INTERCHANGE AT FM 3549 INCLUDING FRONTAGE ROADS |
0207-02-027 | Rusk/ Tyler |
SH 43 | Actual | $4,691,111 | 1 | REPAIR & RESURFACE ROADWAY |
0177-02-091 | San Jacinto/ Lufkin |
US 59 | Actual | $2,971,067 | 8 | RESURFACE EXISTING PAVEMENT |
0738-04-016 | San Patricio/ Corpus Christi |
FM 3284 | Actual | $335,425 | 8 | RAILROAD SIGNAL UPGRADE |
1559-01-024 | San Patricio/ Corpus Christi |
FM 1074 | Actual | $189,972 | 8 | RAILROAD SIGNAL UPGRADE |
1526-03-015 | Scurry/ Abilene |
FM 1606 | Actual | $6,876,410 | 1 | REHABILITATION AND WIDENING OF EXISTING ROADWAY |
1531-02-012 | Scurry/ Abilene |
FM 1610 | Actual | $5,397,846 | 1 | RESTORATION AND WIDEN EXISTING ROADWAY |
0238-06-029 | Sherman/ Amarillo |
US 54 | Actual | $7,825,684 | 1 | OVERLAY |
0106-04-034 | Stonewall/ Abilene |
US 380 | Actual | $695,243 | 8 | HIGH FRICTION SURFACE TREATMENT AND |
0905-17-013 | Swisher/ Lubbock |
VA | Actual | $280,507 | 1 | MISCELLANEOUS CONSTRUCTION |
0363-01-139 | Tarrant/ Fort Worth |
SH 26 | Actual | $38,223,663 | 1 | RECONSTRUCT 4 LANE UNDIVIDED TO 4 LANE DIVIDED W / MEDIAN; |
0902-00-151 | Tarrant/ Fort Worth |
VA | Actual | $1,707,025 | 1 | CONCRETE PAVEMENT REPAIR; SPOT REPAIRS VARIOUS LOCATIONS |
0908-00-080 | Taylor/ Abilene |
VA | Actual | $448,261 | 1 | INSTALL HIGH MAST ILLUMINATION AT US84 / US380, KENT;US84 / ENNIS |
0069-07-103 | Tom Green/ San Angelo |
US 87 | Actual | $1,548,841 | 1 | ACP OVERLAY |
0015-13-385 | Travis/ Austin |
IH 35 | Actual | $320,535 | 10 | LANDSCAPING |
0016-01-115 | Travis/ Austin |
SL 275 | Actual | $293,000 | 6 | UPGRADE BRIDGE AND APPROACH RAILING |
0914-04-297 | Travis/ Austin |
VA | Actual | $172,878 | 10 | MILL AND OVERLAY TPWD HEADQUARTER ENTRANCE ROAD |
3136-01-177 | Travis/ Austin |
SL 1 | Actual | $787,594 | 1 | OVERLAY FRONTAGE ROADS |
3417-01-028 | Travis/ Austin |
FM 734 | Actual | $839,341 | 3 | CONSTRUCT TURN LANES AND SIGNAL |
0922-11-033 | Val Verde/ Laredo |
CS | Actual | $5,162,504 | 3 | REPLACE TOLL BOOTHS GATES & ITS SYSTEM |
0271-04-091 | Waller/ Houston |
IH 10 | Actual | $4,962,242 | 1 | BASE REPAIR, PLANING, SURFACE TREATMENT AND 1.5" ACP OVERLAY |
0922-33-167 | Webb/ Laredo |
CS | Actual | $190,289 | 8 | INSTALLATION OF RAILROAD SIGNALS |
0922-33-168 | Webb/ Laredo |
CS | Actual | $310,428 | 8 | INSTALLATION OF RAILROAD SIGNALS |
0089-06-079 | Wharton/ Yoakum |
US 59 | Actual | $3,681,314 | 1 | PAVEMENT REPAIR & ACP OVERLAY |
0913-09-071 | Wharton/ Yoakum |
CR | Actual | $441,100 | 6 | REPLACE BRIDGE AND APPROACHES |
0913-09-087 | Wharton/ Yoakum |
CS | Actual | $320,500 | 8 | 2016 FEDERAL SIGNAL PROGRAM |
0921-27-037 | Willacy/ Pharr |
CS | Actual | $191,741 | 8 | INSTALLATION OF FLASHING LIGHT SIGNAL |
1202-03-016 | Williamson/ Austin |
FM 1063 | Actual | $89,906 | 10 | RIPRAP AND EDGE REPAIR |
0100-04-038 | Wilson/ San Antonio |
US 181 | Actual | $9,084,167 | 1 | REHAB EXISTING ROADWAY AND WIDEN TO ADD SHOULDERS |
1606-02-019 | Wise/ Fort Worth |
FM 2123 | Actual | $2,779,919 | 1 | WIDEN SHOULDER; 32' TOTAL WIDTH |
|