Letting Schedule for September, 2015 (FY 2016)

Last Update: Thursday, August 20, 2015
September, 2015 (FY 2016) (see Links)
SEP 2015 | OCT 2015 | NOV 2015 | DEC 2015 | JAN 2016 | FEB 2016 | MAR 2016 | APR 2016 | MAY 2016 | JUN 2016 | JUL 2016 | AUG 2016
CCSJ County/
District
Highway Let Status Contract
Cost
Fund
Cat
Description
0199-04-068 Angelina/
Lufkin
US 69 Approved $89,180 1 INSTALL INTERSECTION FLASHING BEACON
0328-06-029 Atascosa/
San Antonio
SH 97 Approved $10,380,908 1 REHAB AND WIDEN ROADWAY TO PROVIDE PASSING LANES
0836-02-070 Bell/
Waco
SH 195 Approved $1,356,723 1 MILL / INLAY
0909-36-148 Bell/
Waco
CS Approved $184,951 3 INSTALL ADVANCE WARNING SIGNALS AND SIGNS, CHEVRONS, SAFETY
2104-02-027 Bexar/
San Antonio
FM 1957 Approved $37,315,146 3 EXPAND FROM 2 LANES TO 4 LANE DIVIDED
0010-12-067 Bowie/
Atlanta
US 67 Approved $2,278,039 8 TEXTURIZE SHOULDERS & CL TEXTURING
0847-03-035 Brazoria/
Houston
FM 521 Approved $7,687,242 1 SHOULDER REPAIR AND 1.5" ACP OVERLAY
0049-09-068 Brazos/
Bryan
BS 6-R Approved $10,154,932 1 SEAL COAT CONSISTING OF A ONE COURSE SURFACE TREATMENT AND
0054-07-069 Brown/
Brownwood
US 84 Approved $11,725,889 1 RAILROAD BRIDGE REPLACEMENT AND ROADWAY WIDENING INCLUDING
0273-02-023 Burnet/
Austin
US 183 Approved $1,934,776 1 REPLACE BRIDGE AND APPROACHES
0152-03-056 Caldwell/
Austin
US 183 Approved $3,191,289 6 REPLACE BRIDGE AND APPROACHES
0914-22-064 Caldwell/
Austin
CR Approved $4,500,000 3 GRADING, ASPHALTIC CEMENT PAVEMENT & MARKINGS FOR CR 110
0039-08-099 Cameron/
Pharr
IH 69E Approved $8,319,526 1 MILL & OVERLAY
0047-06-157 Collin/
Dallas
US 75 Approved $1,320,160 1 FULL DEPTH CONCRETE REPAIR
0281-01-032 Collin/
Dallas
SH 78 Approved $2,654,559 1 BASE REPAIR, MILL AND OVERLAY
0870-04-038 Concho/
San Angelo
FM 765 Approved $4,915,500 1 RESTORATION OF EXISTING ROAD
0724-01-049 Coryell/
Waco
FM 116 Approved $2,625,382 ROW REHABILITATE ROADWAY AND ADD CONTINUOUS LEFT TURN LANE
0092-14-080 Dallas/
Dallas
IH 345 Approved $28,585,241 1 REHABILITATE JULIUS SCHEPPS OVERHEAD BRIDGE; REPAIR AND
0442-02-157 Dallas/
Dallas
IH 35E Approved $3,288,098 1 FULL DEPTH REPAIR CONCRETE PAVEMENT ON MAINLANES & FRONTAGE
0081-13-041 Denton/
Dallas
IH 35W Approved $17,229,036 1 CONSTRUCT 2 LANE SOUTHBOUND FRONTAGE ROADS WITH RAMP
0924-06-501 El Paso/
El Paso
VA Approved $5,650,000 3 CONSTRUC AND UPGRADE TO 4 LANE DIVIDED ARTERIAL
0924-06-502 El Paso/
El Paso
VA Approved $5,200,000 3 CONSTRUCT NEW 4 LANE DIVIDED ARTERIAL
0048-03-092 Ellis/
Dallas
US 77 Approved $11,991,918 1 SEAL COAT, PAVEMENT MARKINGS
0048-08-049 Ellis/
Dallas
IH 35E Approved $34,677,096 1 WIDEN 4 LANE RURAL TO 6 LANES
0269-01-029 Fayette/
Yoakum
US 77 Approved $2,476,046 1 ADD SHOULDERS
1441-01-012 Fayette/
Yoakum
FM 1457 Approved $1,120,388 6 REPLACE BRIDGE AND APPROACHES
0187-05-059 Fort Bend/
Houston
SS 10 Approved $2,121,912 1 BASE REPAIR, 1.5" ACP O / L, SHOULDER TEXTURING AND PAVEMENT
0610-02-052 Franklin/
Paris
IH 30 Approved $18,623,477 1 HEAVY OVERLAY
0294-01-037 Gaines/
Lubbock
US 62 Approved $192,417 11 NEW TRAFFIC SIGNAL
0558-01-012 Garza/
Lubbock
FM 669 Approved $6,758,000 11 REHABILITATION OF EXISTING ROADWAY
0155-04-051 Goliad/
Corpus Christi
US 183 Approved $5,257,121 1 MILL AND INLAY
0043-04-078 Hardeman/
Childress
US 287 Approved $4,912,469 1 SEALCOAT
0912-72-230 Harris/
Houston
CS Approved $2,186,338 6 REPLACE BRIDGE AND APPROACHES (NBI# 12102B71457079)
0912-72-299 Harris/
Houston
VA Approved $1,261,447 3 MISSOURI KANSAS TEXAS TRAIL SPUR CONNECTOR
0096-08-053 Harrison/
Atlanta
US 80 Approved $438,885 8 IMPROVE TRAFFIC SIGNAL
0208-02-038 Harrison/
Atlanta
SH 43 Approved $1,284,872 8 INSTALL LED FLASHING CHEVRONS, TEXTURIZE SHOULDERS &
0495-08-096 Harrison/
Atlanta
IH 20 Approved $1,173,221 8 INSTALL & UPGRADE ROADWAY LIGHTING & HIGH MAST LIGHTING
0914-33-071 Hays/
Austin
CR Approved $2,210,480 6 REPLACE BRIDGE AND APPROACHES
0342-02-049 Hidalgo/
Pharr
SH 107 Approved $2,994,675 1 REHABILITATE EXISTING ROADWAY
0009-09-081 Hopkins/
Paris
IH 30 Approved $17,744,393 9 CONSTRUCTION OF SAFETY REST AREA
0735-05-017 Hopkins/
Paris
FM 1870 Approved $1,855,529 1 REHAB EXISTING ROADWAY
0558-04-021 Howard/
Abilene
FM 669 Approved $211,684 8 TEXTURIZE SHOULDERS (PROFILE PAVEMENT MARKERS)
0306-03-125 Jefferson/
Beaumont
SH 73 Approved $2,548,790 6 REPLACE DOLPHINS THAT PROTECT BRIDGE COLUMNS
0915-15-096 Kerr/
San Antonio
VA Approved $235,364 10 CONSTRUCT PAVED ONE - WAY LOOP ROAD AND PARKING LOT TO FERAL
0435-01-068 Lamar/
Paris
FM 137 Approved $4,556,639 1 REHAB EXISTING ROADWAY
0752-06-022 Limestone/
Waco
FM 147 Approved $4,311,099 1 REHABILITATE AND WIDEN PAVEMENT TO ADD SHOULDERS, UPGRADE
0254-01-141 Live Oak/
Corpus Christi
US 281 Approved $1,602,011 1 BASE REPAIR, UTBHMWC, INSTALL RIGHT TURN LANE
0675-05-079 Madison/
Bryan
IH 45 Approved $6,483,911 1 OVERLAY CONSISTING OF MILLING AND HMA OVERLAY
0179-07-026 Matagorda/
Yoakum
SH 35 Approved $195,647 8 TEXTURIZE C / L & SHOULDERS
0299-04-070 Maverick/
Laredo
US 277 Approved $267,384 8 IMPROVE TRAFFIC SIGNALS
0922-10-029 Maverick/
Laredo
VA Approved $5,078,028 3 UPGRADE INTERNATIONAL BRIDGE II FACILITY
0015-01-237 McLennan/
Waco
IH 35 Approved $3,301,473 6 REPAIR BRIDGE
0013-02-020 Montague/
Wichita Falls
US 81 Approved $697,659 8 CENTERLINE TEXTURING
0010-08-053 Morris/
Atlanta
US 67 Approved $884,714 8 TEXTURIZE SHOULDERS & CL TEXTURING
0916-00-079 Nueces/
Corpus Christi
VA Approved $1,563,585 10 CONSTRUCT CURB RAMPS - ARANSAS, REFUGIO AND SAN PAT COUNTIES
0213-03-097 Polk/
Lufkin
US 190 Approved $14,367,535 1 ADD PASSING LANES
0904-00-157 Potter/
Amarillo
VA Approved $545,261 1 CRACK SEAL
0904-00-168 Potter/
Amarillo
VA Approved $511,750 1 HARDWARE UPGRADE TO EXISTING SYSTEM
0371-02-071 Refugio/
Corpus Christi
US 77 Approved $1,946,611 8 WIDEN ROADWAY
1079-01-031 San Augustine/
Lufkin
FM 705 Approved $1,303,890 1 SAFETY TREAT FIXED OBJECTS
0081-12-047 Tarrant/
Fort Worth
IH 35W Approved 120,039,041 11 RECONSTRUCT 2 NB GENERAL LANES AND ADD MANAGED TOLL LANE 1 +
0407-05-025 Taylor/
Abilene
US 277 Approved $317,532 8 TEXTURIZE SHOULDERS (ROLLED IN OR MILLED IN) , CENTERLINE
0010-06-040 Titus/
Atlanta
US 67 Approved $7,625,004 1 SEAL COAT
0907-00-161 Tom Green/
San Angelo
VA Approved $789,484 1 UPGRADE SIGNALS AND ILLUMINATION
0113-13-157 Travis/
Austin
SL 360 Approved $4,958,143 1 INTERSECTION IMPROVEMENTS
0683-02-063 Travis/
Austin
RM 620 Approved $997,414 11 OPERATIONAL IMPROVEMENTS
0914-00-367 Travis/
Austin
VA Approved $360,000 1 FY 2016 SIGNING
3136-01-161 Travis/
Austin
SL 1 Approved $1,027,606 1 SEAL & THIN OVERLAY
2350-01-041 Victoria/
Yoakum
US 77 Approved $21,781,322 1 ADD 2 LANES FOR 4 - LANE DIVIDED FACILITY
0440-02-015 Williamson/
Austin
SH 195 Approved $486,706 3 CONSTRUCT MEDIAN AND LEFT TURN LANES
1202-01-017 Williamson/
Austin
FM 972 Approved $3,538,704 1 REHABILITATE PAVEMENT, ADD SHOULDERS & SAFETY TREAT


Let Status Definition
Tentative Estimated letting date for this project
Approved Project has administrative approval to be let
Actual Project was let to contract