This report will no longer be updated, please access links on the Contract Letting page. The Electronic State Business Daily (ESBD), the Electronic Bidding System, and the project proposal are the official sources of advertisement and bidding information for the State and Local Lettings. Bidders should bid the project using the information found therein, including any addenda. These sources take precedence over information from other sources, including TxDOT webpages, which are unofficial and intended for informational purposes only. |
|
May, 2020 (FY 2021) | (see Links) |
SEP 2019 | OCT 2019 | NOV 2019 | DEC 2019 | JAN 2020 | FEB 2020 | MAR 2020 | APR 2020 | MAY 2020 | JUN 2020 | JUL 2020 | AUG 2020 | | |||||||
CCSJ | County/ District | Highway | Let Status | Contract Cost | Fund Cat | Description | DBE Goal |
---|---|---|---|---|---|---|---|
0573-01-032 | Bastrop/ Austin | SH 304 | Tentative | $5,100,000 | 1 | PROVIDE ADDITIONAL PAVED SURFACE WIDTH | 0.0 |
0530-01-007 | Bastrop/ Austin | PR 1A | Tentative | $2,076,496 | 10 | REPAIR CULVERTS, ROADWAY AND WALLS IN BASTROP AND BEUSCHER | 0.0 |
0914-18-109 | Bastrop/ Austin | CS | Tentative | $1,300,000 | 3 | CONSTRUCT MULTI-USE PATH | 0.0 |
1835-02-059 | Bell/ Waco | FM 1741 | Tentative | $900,000 | 10 | HIKE AND/OR BIKE | 0.0 |
1835-02-061 | Bell/ Waco | FM 1741 | Approved | $1,175,002 | 10 | HIKE AND/OR BIKE | 0.0 |
0915-00-183 | Bexar/ San Antonio | VA | Tentative | $586,704 | 6 | REPLACE BRIDGE AND APPROACH RAILING OR ADD SAFETY END | 0.0 |
0915-00-184 | Bexar/ San Antonio | VA | Tentative | $757,656 | 6 | REPLACE BRIDGE AND APPROACH RAILING OR ADD SAFETY END | 0.0 |
0915-12-579 | Bexar/ San Antonio | VA | Tentative | $2,000,000 | 3 | CONSTRUCT CITYWIDE PEDESTRIAN AND BICYCLE IMPROVEMENTS | 0.0 |
0915-12-562 | Bexar/ San Antonio | CR | Tentative | $4,886,116 | 3 | EXPAND FROM 2 TO 4 LANES, INCLUDING DRAINAGE IMPROVEMENTS, | 0.0 |
7774-01-001 | Bexar/ San Antonio | PA 1502 | Tentative | $9,000,000 | 2M | EXPAND 4 TO 6 LANES & INTERSECTION OPERATIONAL IMPROVMENTS | 0.0 |
3278-01-003 | Blanco/ Austin | RM 473 | Tentative | $6,000,000 | 8 | IMPROVE GAURDRAIL TO DESIGN STANDARDS,SAFETY TREAT FIXED | 0.0 |
0914-23-010 | Blanco/ Austin | VA | Tentative | $200,000 | 10 | STATE PARK IMPROVEMENTS | 0.0 |
1231-01-066 | Bowie/ Atlanta | FM 989 | Tentative | $3,791,910 | 2U | WIDEN ROAD - ADD LANES | 0.0 |
0330-01-033 | Bowie/ Atlanta | SH 98 | Tentative | $3,286,629 | 6 | Widen Bridge | 5.0 |
2523-02-068 | Brazoria/ Houston | FM 2004 | Tentative | $32,000,000 | 1 | ADD SHOULDERS, WIDEN BRIDGES, REPLACE BRIDGE AT CHOCOLATE | 0.0 |
0912-31-293 | Brazoria/ Houston | CS | Tentative | $4,948,242 | 3 | WIDEN TO 4 LANES | 0.0 |
0912-31-319 | Brazoria/ Houston | CS | Tentative | $40,033,000 | 3 | WIDEN TO 4-LANE BLVD SECTION | 0.0 |
0116-04-104 | Brazos/ Bryan | SH 21 | Tentative | $332,814 | 8 | INSTALL TRAFFIC SIGNAL | 0.0 |
0117-09-002 | Brazos/ Bryan | US 190 | Tentative | $182,511 | 8 | INSTALL INTERSECTION FLASHING BEACON | 0.0 |
0049-12-121 | Brazos/ Bryan | US 190 | Tentative | $1,027,303 | 6 | PAINT STEEL SURFACES | 0.0 |
3138-01-029 | Brazos/ Bryan | FM 2347 | Tentative | $1,009,813 | 8 | INSTALL RAISED MEDIAN | 0.0 |
0924-35-021 | Brewster/ El Paso | VA | Tentative | $315,321 | 10 | IMPROVE EXISTING UNPAVED WMA ROAD WITH ADDITIONAL ROAD BASE | 0.0 |
0858-03-019 | Burleson/ Bryan | FM 908 | Tentative | $4,457,904 | 8 | SAFETY TREAT FIXED OBJECTS | 0.0 |
1024-01-078 | Chambers/ Beaumont | FM 565 | Tentative | $604,705 | 8 | Hazard Elimination & Safety | 0.0 |
0280-03-004 | Collin/ Dallas | BS 78-D | Tentative | $6,628,268 | 1 | BASE REPAIR, TWO-COURSE SURFACE TREATMENT, AND ADD SHOULDERS | 0.0 |
1268-01-013 | Comal/ San Antonio | FM 1103 | Tentative | $24,000,000 | 1 | WIDEN ROAD - ADD LANES | 0.0 |
0909-39-131 | Coryell/ Waco | CS | Tentative | $1,700,000 | 3 | CONSTRUCTION OF SIDEWALKS FOR PEDESTRIANS AND BICYCLES | 0.0 |
0918-00-206 | Dallas/ Dallas | VA | Tentative | $1,150,000 | 5 | REGIONAL ITS FUNDING POOL | 0.0 |
0918-00-219 | Dallas/ Dallas | VA | Tentative | $991,874 | 5 | REGIONAL ITS FUNDING POOL | 0.0 |
0195-03-092 | Denton/ Dallas | IH 35E | Tentative | $1,286,705 | 8 | IMPROVE TRAFFIC SIGNALS | 0.0 |
0257-04-031 | Eastland/ Brownwood | SH 6 | Tentative | $0 | 1 | RECONSTRUCT ROADWAY AND ADD TWO WAY LEFT TURN LANE | 0.0 |
0924-06-543 | El Paso/ El Paso | VA | Tentative | $1,566,820 | 3 | BICYCLE CONNECTIVITY INFRASTRUCTURE, PHASE 2 | 0.0 |
0924-06-544 | El Paso/ El Paso | VA | Tentative | $2,813,772 | 3 | PEDESTRIAN ENHANCEMENTS ALONG MONTANA RTS ROUTE TO INCLUDE I | 0.0 |
0924-06-549 | El Paso/ El Paso | VA | Tentative | $716,107 | 3 | PEDESTRIAN ENHANCEMENTS TO INCLUDE SIDEWALKS, ADA PEDESTRIAN | 0.0 |
0924-06-419 | El Paso/ El Paso | CS | Tentative | $3,743,350 | 6 | Widen Bridge | 0.0 |
2552-03-061 | El Paso/ El Paso | SL 375 | Tentative | $1,272,840 | 8 | SAFETY LIGHTING | 0.0 |
2552-03-049 | El Paso/ El Paso | SL 375 | Tentative | $30,436,749 | 11 | Widen Road - Add Lanes | 0.0 |
1046-03-005 | El Paso/ El Paso | SS 601 | Tentative | $21,289,105 | 11 | CONSTRUCT NORTHBOUND-WESTBOUND AND EASTBOUND-SOUTHBOUND | 0.0 |
1990-01-020 | Erath/ Ft Worth | FM 205 | Tentative | $4,184,593 | 8 | Hazard Elimination & Safety | 0.0 |
0912-34-200 | Fort Bend/ Houston | CS | Tentative | $1,025,528 | 10 | REMOVE AND REPLACE DAMAGED CONCRETE SLABS AND RIP RAP | 0.0 |
0166-03-033 | Freestone/ Bryan | SH 75 | Tentative | $6,594,668 | 8 | SAFETY TREAT FIXED OBJECTS | 0.0 |
2073-01-010 | Gregg/ Tyler | FM 2206 | Tentative | $17,400,000 | 11 | Widen Road - Add Lanes | 0.0 |
0917-17-070 | Grimes/ Bryan | CR | Tentative | $165,000 | 6 | REPLACE EXISTING BRIDGE CONSISTING OF GRADING, STRUCTURES, | 0.0 |
0915-46-046 | Guadalupe/ San Antonio | VA | Tentative | $2,801,246 | 3 | EXTEND WALNUT SPRINGS MULTI USE TRAIL, INCLUDING RETAINING | 0.0 |
0016-06-047 | Guadalupe/ San Antonio | IH 35 | Tentative | $748,200,000 | 1 | EXPAND FROM 8 LN TO 14 LN EXPY-ADD 6 NEW EXPRESS LANES | 0.0 |
0042-09-124 | Hall/ Childress | US 287 | Tentative | $8,142,200 | 1 | REALIGNMENT | 0.0 |
0912-00-500 | Harris/ Houston | VA | Tentative | $1,380,000 | 5 | COMMUTE SOLUTIONS STAFF AND OUTREACH (C.S. FUNDING INCLUDING | 0.0 |
0912-00-526 | Harris/ Houston | VA | Tentative | $1,000,000 | 1 | Install/Upgrade Roadway Lighting | 0.0 |
0050-06-093 | Harris/ Houston | US 290 | Tentative | $32,109,300 | 3 | CONSTRUCT RAMP PROVIDING ACCESS TO THE US 290 HOV/HOT | 0.0 |
0508-01-369 | Harris/ Houston | IH 10 | Tentative | $4,740,633 | 10 | REPLACE/REPAIR FENDER AND DOLPHINS | 0.0 |
0912-00-543 | Harris/ Houston | VA | Tentative | $40,033,000 | 3 | WIDEN TO 4-LANE BLVD SECTION | 0.0 |
0912-00-580 | Harris/ Houston | VA | Tentative | $1,383,770 | 3 | SIDEWALK AND ADA RAMP CONSTRUCTION | 0.0 |
0912-00-558 | Harris/ Houston | VA | Tentative | $10,000,000 | 3 | REGIONAL FREEWAY INCIDENT MANAGEMENT - TOWING (FY 2019) | 0.0 |
1685-03-098 | Harris/ Houston | FM 1960 | Tentative | $69,055,631 | 2M | WIDEN TO 6-LN DIVIDED W/ RAISED MEDIANS, CHANNELIZED TURN | 0.0 |
1685-03-058 | Harris/ Houston | FM 1960 | Tentative | $65,032,652 | 2M | WIDEN TO 6-LN DIVIDED W/ RAISED MEDIANS, CHANNELIZED TURN | 0.0 |
0912-71-836 | Harris/ Houston | CS | Tentative | $16,000,000 | 3 | WIDEN TO 4 LANE DIVIDED | 0.0 |
0912-72-391 | Harris/ Houston | CS | Tentative | $17,132,000 | 3 | RECONSTRUCT ROADWAY INCLUDING DRAINAGE, ACCESS MANAGEMENT & | 0.0 |
0495-10-092 | Harrison/ Atlanta | IH 20 | Tentative | $1,500,000 | 6 | BRIDGE MAINTENANCE | 0.0 |
0683-03-040 | Hays/ Austin | RM 12 | Tentative | $801,960 | 3 | PAVEMENT WIDENING FOR INTERSECTION IMPROVEMENTS | 0.0 |
0366-01-077 | Hays/ Austin | SH 123 | Tentative | $700,000 | 1 | CONSTRUCT SIDEWALKS | 0.0 |
0286-01-058 | Hays/ Austin | SH 80 | Tentative | $5,000,000 | 1 | COMPLETE GAP IN SHOULDER FOR BICYCLE TRAVEL | 0.0 |
1776-01-037 | Hays/ Austin | RM 967 | Tentative | $5,315,000 | 3 | WIDEN ROADWAY WITH CENTER TURN AND ADJUST VERTICAL PROFILE | 0.0 |
0987-03-012 | Hays/ Austin | FM 621 | Tentative | $4,080,000 | 3 | WIDEN ROADWAY WITH CENTER TURN LANE | 0.0 |
0108-09-050 | Hopkins/ Paris | SH 19 | Tentative | $4,230,955 | 8 | SAFETY TREAT FIXED OBJECTS | 0.0 |
0009-15-028 | Hunt/ Paris | US 69 | Tentative | $1,191,003 | 8 | IMPROVE TRAFFIC SIGNALS, INTERCONNECT SIGNALS, INSTALL | 0.0 |
2247-03-008 | Hunt/ Paris | FM 2194 | Tentative | $1,371,277 | 8 | SAFETY TREAT FIXED OBJECTS, CONSTRUCT PAVED SHOULDERS | 0.0 |
0249-07-072 | Jack/ Ft Worth | US 281 | Tentative | $10,000,000 | 1 | CONSTRUCT BRIDGE AND RETAINING WALLS AT US 380 INTERSECTION | 0.0 |
0249-07-070 | Jack/ Ft Worth | US 281 | Tentative | $8,750,000 | 11 | UPGRADE TO SUPER 2 DESIGN, EXT CULVERTS, SETS, 2" OVERLAY | 0.0 |
0924-10-007 | Jeff Davis/ El Paso | VA | Tentative | $350,000 | 10 | SEAL COAT PARK ROADS, PARKING LOTS AND CAMPSITE PULLOUTS | 0.0 |
0200-16-020 | Jefferson/ Beaumont | US 69 | Tentative | $66,400,000 | 1 | IMPROVE INTERCHANGE | 0.0 |
0112-01-019 | Kimble/ San Angelo | US 290 | Tentative | $2,285,192 | 8 | SAFETY TREATED FIXED OBJECTS | 0.0 |
0045-09-104 | Lamar/ Paris | US 82 | Tentative | $821,226 | 8 | IMPROVE TRAFFIC SIGNALS, INTERCONNECT SIGNALS | 0.0 |
0231-01-057 | Lampasas/ Brownwood | US 190 | Tentative | $0 | 11 | RECONSTRUCT INTERSECTION | 0.0 |
0231-01-058 | Lampasas/ Brownwood | US 190 | Tentative | $256,032 | 1 | Hazard Elimination & Safety | 0.0 |
1007-01-026 | Lavaca/ Yoakum | FM 532 | Tentative | $1,422,436 | 8 | SAFETY TREAT FIXED OBJECTS | 0.0 |
0334-03-021 | Lee/ Austin | FM 696 | Tentative | $0 | 1 | Widen Road - Add Shoulders | 0.0 |
0211-05-019 | Lee/ Austin | US 77 | Tentative | $7,101,206 | 1 | PROVIDE ADDITIONAL PAVED SURFACE WIDTH | 0.0 |
0920-02-091 | Liberty/ Beaumont | CR | Tentative | $176,255 | 6 | REPLACE BRIDGE AND APPROACHES | 0.0 |
0028-03-110 | Liberty/ Beaumont | US 90 | Tentative | $2,545,749 | 10 | Construct Pedestrian Infrastructure | 0.0 |
1187-02-018 | Mclennan/ Waco | FM 938 | Tentative | $560,000 | 6 | Bridge Replacement | 0.0 |
0005-15-090 | Midland/ Odessa | IH 20 | Tentative | $513,261 | 8 | INSTALL TRAFFIC SIGNAL AND SAFETY LIGHTING AT INTERSECTION | 0.0 |
0102-03-087 | Nueces/ Corpus Christi | US 77 | Tentative | $9,000,000 | 1 | CONSTRUCT EXIT AND ENTRANCE RAMPS | 0.0 |
0140-17-019 | Pecos/ Odessa | US 285 | Tentative | $206,795 | 8 | IMPROVE TRAFFIC SIGNALS | 0.0 |
0275-01-205 | Potter/ Amarillo | IH 40 | Tentative | $13,340,000 | 6 | 2018 BMIP REPAIR WB BRIDGE | 0.0 |
0722-03-014 | Red River/ Paris | FM 911 | Tentative | $4,398,101 | 8 | PROVIDE ADDITIONAL PAVED SURFACE WIDTH | 0.0 |
0809-03-040 | San Augustine/ Lufkin | US 96 | Tentative | $6,000,000 | 11 | Construct New Roadway Lanes | 0.0 |
1209-01-030 | San Patricio/ Corpus Christi | FM 893 | Tentative | $7,000,000 | 1 | UPGRADE TO 5-LANE URBAN ROADWAY BY CONSTRUCTING ADDTNL 2 | 0.0 |
0141-03-063 | Sutton/ San Angelo | IH 10 | Tentative | $2,897,409 | 8 | SAFETY TREAT FIXED OBJECTS | 0.0 |
0789-04-006 | Swisher/ Lubbock | FM 2301 | Tentative | $234,909 | 6 | BRIDGE REPLACEMENT | 0.0 |
0008-15-052 | Tarrant/ Ft Worth | IH 820 | Tentative | $6,580,424 | 1 | REPAIR BASE FAILURES, HMAC OVERLAY, PAVEMENT MARKINGS | 0.0 |
0902-90-061 | Tarrant/ Ft Worth | CS | Tentative | $810,970 | 6 | BRIDGE REPLACEMENT | 0.0 |
0907-00-175 | Tom Green/ San Angelo | VA | Tentative | $600,000 | 11 | REPLACE GUARD FENCE, BRIDGE RAIL, AND SAFETY END TREATMENTS | 0.0 |
0113-13-177 | Travis/ Austin | US 290 | Tentative | $1,309,305 | 1 | MILL, SEAL & THIN OV FRONTAGE RDS- EB ONLY | 0.0 |
0265-02-036 | Travis/ Austin | SH 71 | Tentative | $43,031,262 | 1 | CONSTRUCT 4-LANE OVERPASSES AT ROSS RD AND KELLAM RD | 0.0 |
0152-01-080 | Travis/ Austin | US 183 | Tentative | $2,346,700 | 3 | ADD LEFT TURN LANE AND RIGHT-TURN DECELERATION LANE | 0.0 |
0015-11-066 | Travis/ Austin | SL 275 | Tentative | $751,262 | 8 | INSTALL LEFT TURN LANE, CONVERT 4 LANE UNDIVIDED TO SUPER 2 | 0.0 |
0914-04-273 | Travis/ Austin | VA | Tentative | $2,714,999 | 3 | CONSTRUCT BLAKE-MANOR SHARED USE PATH FOR USE BY BICYCLES & | 0.0 |
0914-04-315 | Travis/ Austin | CS | Tentative | $14,050,000 | 3 | EXTEND EXISTING 4-LN DIVIDED ROADWAY BRAKER LN & CONSTRUCT | 0.0 |
0911-40-029 | Trinity/ Lufkin | VA | Tentative | $808,538 | 3 | Construct Pedestrian Infrastructure | 0.0 |
0088-05-098 | Victoria/ Yoakum | US 59 | Tentative | $7,000,000 | 2U | CONSTRUCT SOUTHBOUND 2-LANE ONE-WAY FRONTAGE ROAD AND REHAB | 0.0 |
0114-09-078 | Washington/ Bryan | US 290 | Tentative | $575,412 | 8 | INSTALL INTERSECTION FLASHING BEACON | 0.0 |
0089-07-155 | Wharton/ Yoakum | US 59 | Tentative | $2,806,782 | 8 | IMPROVE GUARDRAIL TO DESIGN STANDARD | 0.0 |
0802-02-054 | Wichita/ Wichita Falls | FM 369 | Tentative | $7,000,001 | 1 | ENCLOSE DRAINAGE DITCH | 0.0 |
0273-04-040 | Williamson/ Austin | US 183 | Tentative | $1,383,059 | 8 | INSTALL CONTINUOUS TURN LANE, CONSTRUCT PAVED SHOULDERS | 0.0 |
0038-03-041 | Zapata/ Pharr | US 83 | Tentative | $4,853,424 | 8 | SAFETY LIGHTING | 0.0 |
|