Letting Schedule for August, 2020 County (FY 2021)

Last Update: Tuesday, August 13, 2024

Bid Tabulations Dashboard

This report will no longer be updated, please access links on the Contract Letting page.

The Electronic State Business Daily (ESBD), the Electronic Bidding System, and the project proposal are the official sources of advertisement and bidding information for the State and Local Lettings. Bidders should bid the project using the information found therein, including any addenda. These sources take precedence over information from other sources, including TxDOT webpages, which are unofficial and intended for informational purposes only.

August, 2020 (FY 2021)(see Links)
SEP 2019 | OCT 2019 | NOV 2019 | DEC 2019 | JAN 2020 | FEB 2020 | MAR 2020 | APR 2020 | MAY 2020 | JUN 2020 | JUL 2020 | AUG 2020 |
CCSJCounty/
District
HighwayLet StatusContract
Cost
Fund
Cat
DescriptionDBE Goal
2553-01-115Angelina/
Lufkin
US 59Tentative$13,557,0001Convert Non-Freeway0.0
0073-03-065Atascosa/
San Antonio
US 281Tentative$70,0001Railroad Crossing Improvements0.0
0909-36-163Bell/
Waco
VATentative$1,582,3643Hike And/Or Bike0.0
0915-12-600Bexar/
San Antonio
CSTentative$08ADVANCED PREEMPTION; UPDATE GATES AT UPRR DOT 446 652D0.0
0017-09-103Bexar/
San Antonio
IH 35Tentative$08INSTALL CANTILEVER AND UPGRADE GATES AND PREEMPTION AT UPRR0.0
0915-12-598Bexar/
San Antonio
CSTentative$08ADVANCED PREEMPTION, INSTALL CONTILEVERS AT0.0
0915-12-599Bexar/
San Antonio
CSTentative$08ADD RAILROAD GATES, CROSSBUCKS, UPGRADE PREEMPTION AT UPRR0.0
0017-09-102Bexar/
San Antonio
IH 35Tentative$08INSTALL BACKLIGHTS AND BACK XBUCKS ON EXISTING SIGNAL AT UPR0.0
0178-03-156Brazoria/
Houston
SH 35Tentative$6,695,0001WIDEN SHOULDERS, 1.5 IN LEVEL UP, 1.5 IN ACP OVERLAY,0.0
1425-03-068Cameron/
Pharr
SS 206Tentative$010CONSTRUCT CONCRETE SIDEWALKS, RAMPS, CURBS, SIGNAGE &0.0
1150-02-006Cherokee/
Tyler
FM 235Tentative$3,447,3018WIDEN TO 28',IMPROVE DRAINAGE,UPGRADE GUARD RAIL,ADD PROFILE0.0
0918-24-241Collin/
Dallas
VATentative$444,7303BICYCLE AND PEDESTRIAN IMPROVEMENTS0.0
0918-24-242Collin/
Dallas
CSTentative$487,8723CONSTRUCT INTERSECTION IMPROVEMENT0.0
0918-24-239Collin/
Dallas
CSTentative$700,0003CREATE A TMA THAT REDUCES DEMAND FOR AN OVER CAPACITY0.0
0918-47-209Dallas/
Dallas
CSTentative$1,949,8243Bicycle And Pedestrian Improvements0.0
0918-47-144Dallas/
Dallas
CSTentative$500,0003SKYLINE TRAIL - CONSTRUCT HIKE AND BIKE TRAIL0.0
0918-47-077Dallas/
Dallas
CSTentative$2,615,8043BIKE AND PEDESTRIAN IMPROVEMENTS0.0
0918-47-202Dallas/
Dallas
CSTentative$1,316,4393SHARED-USE PATH AND PEDESTRIAN IMPROVEMENT0.0
0918-47-204Dallas/
Dallas
VATentative$859,1003SAFETY LIGHTING ALONG EXISTING RIDGEWOOD TRL0.0
0918-47-207Dallas/
Dallas
VATentative$436,6853SAFE ROUTES TO SCHOOL PEDESTRIAN IMPROVEMENT IN PROXIMITY TO0.0
0918-47-073Dallas/
Dallas
CSTentative$380,0003PLANNING AND IMPLEMENTATION STUDY FOR IRVING BLVD/2ND ST TO0.0
0918-47-269Dallas/
Dallas
CSTentative$12,000,0003RECONSTRUCT FROM 3 TO 2 LANES WITH A BICYCLE LANE, SIDEWALK0.0
0918-46-306Denton/
Dallas
CSTentative$953,1353Bicycle And Pedestrian Improvements0.0
0918-46-311Denton/
Dallas
CSTentative$03RECONSTRUCT EXISTING 2 LNS, ADD BIKE LN, WIDEN/EXPAND0.0
0918-46-305Denton/
Dallas
CSTentative$952,8883SAFE ROUTES TO SCHOOL PEDESTRIAN IMPROVEMENTS IN PROXIMITY0.0
2296-01-056Ector/
Odessa
SH 191Tentative$2,366,3948INSTALL MEDIAN BARRIER0.0
0902-49-069Erath/
Ft Worth
CRTentative$987,6946Bridge Replacement0.0
0908-23-052Fisher/
Abilene
CRTentative$582,4006REPLACE BRIDGE AND APPROACHES0.0
3510-04-049Fort Bend/
Houston
SH 99Tentative$10,800,0003CONSTRUCT OVERPASS AND APPROACHES (SEGMENT D NON-TOLL)0.0
0188-09-040Fort Bend/
Houston
FM 723Tentative$176,000,0002MWIDEN ROAD - ADD LANES0.0
2523-01-026Galveston/
Houston
FM 2004Tentative$5,790,0001WIDEN FOR 8 FT SHOULDERS, 1 IN LEVEL UP AND 1 IN TOM0.0
0901-19-187Grayson/
Paris
VATentative$8,000,00011CONSTRUCT 2-LANE NEW LOCATION FM HIGHWAY0.0
0915-46-048Guadalupe/
San Antonio
CSTentative$08INSTALL CANTILEVERS AT UPRR DOT 742 634V (SCHERTZ PARKWAY)0.0
0067-06-058Hale/
Lubbock
IH 27Tentative$227,3318SAFETY0.0
0027-13-201Harris/
Houston
IH 69Tentative$210,000,0002MRECONSTRUCT TO 10 MAIN LANES0.0
0912-72-401Harris/
Houston
VATentative$36,530,3693CONSTRUCT RAILROAD UNDERPASS AT YORK ST AND CLOSE AT-GRADE0.0
0028-01-067Harris/
Houston
BU 90-UTentative$17,000,0002MWIDEN TO 6 LANE DIVIDED URBAN_(PHASE 2)0.0
0495-08-121Harrison/
Atlanta
IH 20Tentative$179,2656Bridge Maintenance0.0
0919-03-062Harrison/
Atlanta
CSTentative$783,1793CONSTRUCT SIDEWALKS0.0
1776-02-020Hays/
Austin
FM 2001Tentative$357,5003HIKE AND/OR BIKE0.0
1804-01-078Hidalgo/
Pharr
SS 115Tentative$290,00010LANDSCAPE IMPROVEMENTS0.0
0130-03-026Hockley/
Lubbock
SH 114Tentative$1,817,1988SAFETY - INSTALL BARRIERS0.0
0957-01-019Hudspeth/
El Paso
FM 192Tentative$800,0006Bridge Replacement0.0
1290-07-001Hunt/
Paris
SH 276Tentative$9,000,0002MCONSTRUCT 4 LANE FACILITY ON NEW LOCATION (QUINLAN BYPASS)0.0
0249-07-071Jack/
Ft Worth
US 281Tentative$10,000,0001GRADE SEPARATION CONSTRUCT BRIDGE AND RETAINING WALLS AT INT0.0
1853-01-046Johnson/
Ft Worth
FM 1434Tentative$9,781,2008PROVIDE ADDL PAVED SURFACE WIDTH; MILLED EDGELINE RUMBLE0.0
0902-50-125Johnson/
Ft Worth
VATentative$2,151,27434'-10' SHARED USE PATH INSTALLATION0.0
0014-03-088Johnson/
Ft Worth
IH 35WTentative$15,000,0001RECONSTRUCT INTERCHANGE AT FM 9170.0
0918-11-099Kaufman/
Dallas
VATentative$667,9753SAFE ROUTES TO SCHOOL PEDESTRIAN IMPROVEMENTS IN PROXIMITY0.0
0095-04-069Kaufman/
Dallas
US 80Tentative$9,349,9495INTERSECTION IMPROVEMENTS0.0
0053-01-126Lubbock/
Lubbock
US 84Tentative$1,650,9818SAFETY0.0
0005-04-081Martin/
Odessa
IH 20Tentative$1,804,8428INSTALL TRAFFIC SIGNAL0.0
0299-14-026Maverick/
Laredo
SL 480Tentative$500,00011FOR THE CONSTRUCTION OF DRAINAGE IMPROVEMENTS TO REDUCE0.0
0300-01-098Maverick/
Laredo
US 277Tentative$2,868,02010REHABILITATION OF EXISTING HIGHWAY0.0
1229-04-015Maverick/
Laredo
FM 375Tentative$8,987,5588INSTALL RAISED MEDIAN0.0
0909-22-180Mclennan/
Waco
CSTentative$395,0006REPLACE BRIDGE AND APPROACHES0.0
0523-10-042Montgomery/
Houston
FM 1488Tentative$947,9431INTERSECTION IMPROVEMENTS0.0
0074-06-227Nueces/
Corpus Christi
IH 37Tentative$1,198,7008IMPROVE GUARDRAIL TO DESIGN STANDARDS0.0
0916-35-224Nueces/
Corpus Christi
CSTentative$08IMPROVE TRAFFIC SIGNALS, IMPROVE PEDESTRIAN SIGNALS0.0
0916-35-223Nueces/
Corpus Christi
CSTentative$08IMPROVE TRAFFIC SIGNALS, SAFETY LIGHTING AT INTERSECTION0.0
0916-35-222Nueces/
Corpus Christi
CSTentative$08IMPROVE TRAFFIC SIGNALS, INTERCONNECT SIGNALS0.0
0045-12-087Red River/
Paris
US 82Tentative$4,051,8628IMPROVE GUARDRAIL TO DESIGN STANDARDS0.0
0901-27-046Red River/
Paris
CSTentative$487,0846REPLACE BRIDGE AND APPROACHES0.0
0139-02-029Reeves/
Odessa
US 285Tentative$1,322,0888SAFETY LIGHTING AT INTERSECTION0.0
0447-05-075Refugio/
Corpus Christi
FM 774Tentative$08SAFETY TREAT FIXED OBJECTS, PROVIDE ADDITIONAL PAVED SURFACE0.0
0371-03-131Refugio/
Corpus Christi
US 77Tentative$08INSTALL MEDIAN BARRIER0.0
0738-01-065Refugio/
Corpus Christi
FM 136Tentative$08SAFETY TREAT FIXED OBJECTS, PROVIDE ADDITIONAL PAVED SURFACE0.0
0918-25-025Rockwall/
Dallas
CSTentative$475,2863SHARED-USE PATH FOR BICYCLISTS AND PEDESTRIANS ALONG0.0
0902-48-850Tarrant/
Ft Worth
CRTentative$358,2986BRIDGE REPLACEMENT0.0
2079-01-042Tarrant/
Ft Worth
FM 1220Tentative$2,018,9178CONVERT FOUR LANE ROADWAY WITH TWLTL TO A 4 LANE ROADWAY0.0
1068-02-137Tarrant/
Ft Worth
IH 30Tentative$265,0003Landscape Development0.0
0902-90-082Tarrant/
Ft Worth
VATentative$2,189,0543REPAIR EXISTING OR CONSTRUCT NEW SIDEWALKS, CURB RAMPS,0.0
3559-02-009Tarrant/
Ft Worth
SH 170Tentative$137,6418CHANNELIZATION0.0
2266-02-151Tarrant/
Ft Worth
SH 360Tentative$475,4048PROFILE EDGELINE MARKINGS0.0
0902-90-081Tarrant/
Ft Worth
VATentative$2,096,4013CONSTRUCTION OF BIKE/PED TRAIL0.0
0902-90-076Tarrant/
Ft Worth
VATentative$376,3953REPAIR EXISTING/CONSTRUCT NEW SIDEWALKS, CURB RAMPS, CROSS0.0
0902-90-050Tarrant/
Ft Worth
VATentative$2,210,0003PEDESTRIAN AND BIKE TRAIL0.0
0902-48-892Tarrant/
Ft Worth
CRTentative$446,1086REPLACE BRIDGE0.0
0902-90-080Tarrant/
Ft Worth
VATentative$263,9213CONSTRUCTION OF SIDEWALK, CURB RAMPS, CROSSWALKS, PAVEMENT0.0
0902-90-079Tarrant/
Ft Worth
VATentative$771,6183CONSTRUCTION OF RRFB'S, PEDESTRIAN SIGNALIZATION, PEDESTRIAN0.0
0902-90-078Tarrant/
Ft Worth
VATentative$968,7993CONSTRUCT SHARED USE PATH, ADA RAMPS, DRAINAGE CROSSING, &0.0
0034-01-127Taylor/
Abilene
US 83Tentative$7,000,0001ADD FRONTAGE ROAD AT US 83 CONNECTING FM 707 TO ANTILLEY.0.0
0151-06-143Travis/
Austin
US 183Tentative$500,000,0003Widen Road - Add Lanes0.0
0914-04-294Travis/
Austin
CSTentative$646,9006REHABILITATE BRIDGE0.0
0912-56-058Waller/
Houston
CRTentative$510,0006Bridge Replacement0.0
0086-14-084Webb/
Laredo
IH 69WTentative$18,340,00011WIDENING OF EXISTING FREEWAY (6 LANES)0.0
0922-33-076Webb/
Laredo
CSTentative$1,810,4343NEW LOCATION TWO LANE HIGHWAY0.0
0922-33-093Webb/
Laredo
CSTentative$16,242,0013CONSTRUCTION OF A GRADE SEPARATION INTERCHANGE3.0
0922-00-066Webb/
Laredo
VATentative$3,025,03011UPGRADE BRIDGE RAIL AND MBGF0.0
0922-00-070Webb/
Laredo
VATentative$150,00011CONSTRUCTION OF RAISED MEDIAN0.0
0151-08-010Williamson/
Austin
SL 332Tentative$1,348,4823Construct Pedestrian Infrastructure0.0
0015-08-147Williamson/
Austin
IH 35Tentative$59,281,8791RECONSTRUCT INTERCHANGE0.0


Let StatusDefinition
TentativeEstimated letting date for this project
ApprovedProject has administrative approval to be let
ActualProject was let to contract