Letting Schedule for August, 2021 County (FY 2021)
The Electronic State Business Daily (ESBD), the Electronic Bidding System, and the project proposal are the official sources of advertisement and bidding information for the State and Local Lettings. Bidders should bid the project using the information found therein, including any addenda. These sources take precedence over information from other sources, including TxDOT webpages, which are unofficial and intended for informational purposes only. |
|
August, 2021 (FY 2021) | (see Links) |
SEP 2020 | OCT 2020 | NOV 2020 | DEC 2020 | JAN 2021 | FEB 2021 | MAR 2021 | APR 2021 | MAY 2021 | JUN 2021 | JUL 2021 | AUG 2021 | | |||||||
CCSJ | County/ District | Highway | Let Status | Contract Cost | Fund Cat | Description | DBE Goal |
---|---|---|---|---|---|---|---|
0911-00-106 | Angelina/ Lufkin | VA | Approved | $5,067,137 | 10 | CONSTRUCT PEDESTRIAN INFRASTRUCTURE | 0.0 |
0911-00-112 | Angelina/ Lufkin | VA | Approved | $2,000,000 | 8 | INSTALL ADVANCED TRAFFIC MANAGEMENT SYSTEM | 0.0 |
0176-02-124 | Angelina/ Lufkin | BU 59-G | Approved | $1,270,000 | 8 | CONSTRUCT PEDESTRIAN INFRASTRUCTURE | 0.0 |
0507-04-061 | Aransas/ Corpus Christi | SH 188 | Tentative | $4,482 | 10 | EMERGENCY RELIEF | 0.0 |
0507-04-060 | Aransas/ Corpus Christi | SH 188 | Tentative | $51,872 | 10 | EMERGENCY RELIEF | 0.0 |
2607-01-018 | Aransas/ Corpus Christi | SH 188 | Tentative | $1,793 | 10 | EMERGENCY RELIEF | 0.0 |
2607-01-017 | Aransas/ Corpus Christi | SH 188 | Tentative | $20,749 | 10 | EMERGENCY RELIEF | 0.0 |
0283-04-035 | Archer/ Wichita Falls | SH 79 | Approved | $984,317 | 1 | SURFACING/ROADWAY RESTORATION | 0.0 |
0472-01-044 | Bastrop/ Austin | SH 21 | Approved | $8,555,000 | 1 | PREVENTIVE MAINTENANCE | 0.0 |
0100-13-028 | Bee/ Corpus Christi | BU 181J | Approved | $3,300,000 | 8 | CONSTRUCT PEDESTRIAN INFRASTRUCTURE | 0.0 |
2502-01-021 | Bell/ Waco | SL 121 | Approved | $28,698,534 | 1 | WIDEN ROAD - ADD LANES | 0.0 |
0909-36-168 | Bell/ Waco | CS | Approved | $10,298,198 | 3 | CONSTRUCT NEW ROAD | 0.0 |
0909-36-167 | Bell/ Waco | CS | Approved | $1,558,802 | 3 | CONSTRUCT PEDESTRIAN INFRASTRUCTURE | 0.0 |
0915-12-677 | Bexar/ San Antonio | VA | Tentative | $90,000 | 3 | TRANSPORTATION NON-ROADWAY | 0.0 |
0024-07-063 | Bexar/ San Antonio | US 90 | Approved | $3,500,000 | 8 | INTERSECTION IMPROVEMENT | 0.0 |
0915-12-678 | Bexar/ San Antonio | VA | Tentative | $129,225 | 3 | TRANSPORTATION NON-ROADWAY | 0.0 |
0915-12-562 | Bexar/ San Antonio | CR | Approved | $4,886,116 | 3 | WIDEN ROAD - ADD LANES | 8.5 |
0100-02-068 | Bexar/ San Antonio | US 181 | Approved | $775,000 | 8 | INSTALL FLASHING BEACON | 0.0 |
0915-12-668 | Bexar/ San Antonio | VA | Approved | $1,000,000 | 3 | INTEGRATED CORRIDOR MANAGEMENT | 0.0 |
0915-12-604 | Bexar/ San Antonio | CS | Approved | $10,000,000 | 3 | CONSTRUCT PEDESTRIAN INFRASTRUCTURE | 0.0 |
0915-12-674 | Bexar/ San Antonio | VA | Approved | $1,000,000 | 3 | INTEGRATED CORRIDOR MANAGEMENT | 0.0 |
0120-03-031 | Bosque/ Waco | SH 22 | Approved | $12,500,000 | 1 | REHABILITATE EXISTING ROADWAY | 0.0 |
0919-00-088 | Bowie/ Atlanta | VA | Approved | $183,000 | 10 | LANDSCAPE DEVELOPMENT | 0.0 |
0010-12-074 | Bowie/ Atlanta | US 67 | Approved | $4,516,517 | 8 | HAZARD ELIMINATION & SAFETY | 0.0 |
0587-01-060 | Brazoria/ Houston | FM 1495 | Tentative | $18,000,000 | 1 | BRIDGE REPLACEMENT | 0.0 |
0976-02-095 | Brazoria/ Houston | FM 518 | Approved | $312,664 | 8 | HAZARD ELIMINATION & SAFETY | 0.0 |
0111-08-100 | Brazoria/ Houston | SH 36 | Approved | $8,300,000 | 11 | WIDEN ROAD - ADD LANES | 0.0 |
1316-01-067 | Brazos/ Bryan | FM 1179 | Approved | $1,356,508 | 8 | HAZARD ELIMINATION & SAFETY | 0.0 |
0917-00-051 | Brazos/ Bryan | VA | Approved | $106,200 | 1 | ADVANCED TRAFFIC MANAGEMENT SYSTEM CONNECTION | 0.0 |
0118-04-032 | Cherokee/ Tyler | SH 21 | Approved | $7,029,053 | 1 | SURFACING/ROADWAY RESTORATION | 0.0 |
1012-02-042 | Collin/ Dallas | FM 545 | Approved | $8,329,899 | 1 | REHABILITATE EXISTING ROADWAY | 0.0 |
0913-26-065 | Colorado/ Yoakum | CS | Approved | $314,730 | 3 | CONSTRUCT PEDESTRIAN INFRASTRUCTURE | 0.0 |
0079-03-051 | Comanche/ Brownwood | US 67 | Approved | $950,000 | 8 | INTERSECTION IMPROVEMENT | 0.0 |
0141-13-006 | Crockett/ San Angelo | SL 466 | Approved | $4,768,995 | 8 | HAZARD ELIMINATION & SAFETY | 0.0 |
0905-21-004 | Crosby/ Lubbock | CR | Approved | $718,760 | 6 | BRIDGE REPLACEMENT | 0.0 |
2964-10-008 | Dallas/ Dallas | SL 9 | Approved | $110,946,167 | 1 | CONSTRUCT FRONTAGE ROADS | 0.0 |
0918-48-004 | Dallas/ Dallas | VA | Tentative | $14,001,990 | 3 | BICYCLE AND PEDESTRIAN IMPROVEMENTS | 0.0 |
0918-00-277 | Dallas/ Dallas | VA | Tentative | $300,000 | 1 | TRANSPORTATION NON-ROADWAY | 0.0 |
0918-00-347 | Dallas/ Dallas | VA | Tentative | $1,503,000 | 7 | BICYCLE AND PEDESTRIAN IMPROVEMENTS | 0.0 |
0918-00-297 | Dallas/ Dallas | VA | Tentative | $1,560,000 | 5 | AIR QUALITY INITIATIVE | 0.0 |
0918-47-202 | Dallas/ Dallas | CS | Approved | $1,316,439 | 3 | BICYCLE AND PEDESTRIAN IMPROVEMENTS | 0.0 |
0196-03-274 | Dallas/ Dallas | IH 35E | Tentative | $708,268,750 | 1 | CONSTRUCT NEW ROADWAY LANES | 0.0 |
0918-00-343 | Dallas/ Dallas | VA | Tentative | $4,178,751 | 3 | TRANSPORTATION NON-ROADWAY | 0.0 |
0918-47-203 | Dallas/ Dallas | VA | Approved | $2,036,189 | 3 | BICYCLE AND PEDESTRIAN IMPROVEMENTS | 0.0 |
0918-00-317 | Dallas/ Dallas | VA | Tentative | $2,543,000 | 3 | TRANSPORTATION NON-ROADWAY | 0.0 |
0168-07-047 | Deaf Smith/ Amarillo | US 60 | Approved | $3,451,995 | 1 | HIGHWAY IMPROVEMENT | 0.0 |
0918-46-311 | Denton/ Dallas | CS | Tentative | $3,000,094 | 3 | RECONSTRUCT EXISTING ROADWAY | 0.0 |
1113-01-028 | Dewitt/ Yoakum | FM 766 | Approved | $8,680,000 | 6 | BRIDGE REPLACEMENT | 0.0 |
0913-00-114 | Dewitt/ Yoakum | VA | Approved | $3,269,438 | 1 | ADVANCED TRAFFIC MANAGEMENT SYSTEM CONNECTION | 0.0 |
2552-02-035 | El Paso/ El Paso | SL 375 | Approved | $5,000,000 | 1 | INTERCHANGE IMPROVEMENT | 0.0 |
0924-06-557 | El Paso/ El Paso | CS | Tentative | $250,000 | 8 | RAILROAD CROSSING IMPROVEMENTS | 0.0 |
0924-06-558 | El Paso/ El Paso | CS | Tentative | $250,000 | 8 | RAILROAD CROSSING IMPROVEMENTS | 0.0 |
2121-04-120 | El Paso/ El Paso | IH 10 | Approved | $3,000,000 | 8 | INSTALL ILLUMINATION | 0.0 |
2552-03-059 | El Paso/ El Paso | SL 375 | Approved | $3,250,000 | 1 | SURFACING/ROADWAY RESTORATION | 0.0 |
2121-04-114 | El Paso/ El Paso | IH 10 | Approved | $16,415,951 | 1 | WIDEN ROAD - ADD LANES | 0.0 |
0924-06-605 | El Paso/ El Paso | CS | Approved | $9,378,645 | 3 | RECONSTRUCT EXISTING ROADWAY | 0.0 |
0924-06-615 | El Paso/ El Paso | VA | Tentative | $894,646 | 3 | TRANSPORTATION SERVICE OPERATIONS | 0.0 |
0902-49-070 | Erath/ Ft Worth | CS | Tentative | $250,000 | 8 | INSTALL TRAFFIC SIGNAL | 0.0 |
1077-01-026 | Falls/ Waco | FM 434 | Approved | $4,323,424 | 8 | HAZARD ELIMINATION & SAFETY | 0.0 |
0901-32-098 | Fannin/ Paris | VA | Tentative | $40,000,000 | 3 | INTERCHANGE IMPROVEMENT | 0.0 |
0027-12-159 | Fort Bend/ Houston | IH 69 | Approved | $1,200,000 | 10 | LANDSCAPE DEVELOPMENT | 0.0 |
0188-10-021 | Fort Bend/ Houston | FM 1463 | Approved | $192,080,000 | 1 | WIDEN ROAD - ADD LANES | 0.0 |
1257-01-053 | Fort Bend/ Houston | FM 1092 | Approved | $2,617,021 | 8 | HIGHWAY IMPROVEMENT | 0.0 |
0367-06-062 | Galveston/ Houston | SH 87 | Tentative | $6,655 | 10 | EMERGENCY RELIEF | 0.0 |
0169-07-053 | Gray/ Amarillo | US 60 | Approved | $18,228,000 | 1 | HIGHWAY IMPROVEMENT | 0.0 |
0901-19-187 | Grayson/ Paris | VA | Approved | $8,000,000 | 11 | WIDEN ROAD - ADD LANES AND SHOULDERS | 0.0 |
0316-03-010 | Grayson/ Paris | FM 1753 | Approved | $5,487,600 | 1 | REHABILITATE EXISTING ROADWAY | 0.0 |
0050-03-096 | Grimes/ Bryan | SH 6 | Approved | $18,928,599 | 8 | HAZARD ELIMINATION & SAFETY | 0.0 |
0050-03-105 | Grimes/ Bryan | SH 6 | Tentative | $157,643 | 10 | EMERGENCY RELIEF | 0.0 |
0339-03-039 | Hardin/ Beaumont | SH 105 | Approved | $432,324 | 8 | CONSTRUCT NEW ROAD | 0.0 |
0912-72-556 | Harris/ Houston | VA | Tentative | $15,883 | 10 | EMERGENCY RELIEF | 0.0 |
0912-70-147 | Harris/ Houston | CS | Tentative | $21,185 | 10 | EMERGENCY RELIEF | 0.0 |
0912-72-555 | Harris/ Houston | VA | Tentative | $52,283 | 10 | EMERGENCY RELIEF | 0.0 |
3256-03-101 | Harris/ Houston | SL 8 | Tentative | $20,982 | 10 | EMERGENCY RELIEF | 0.0 |
1062-02-009 | Harris/ Houston | FM 2100 | Approved | $55,055,000 | 1 | WIDEN ROAD - ADD LANES | 0.0 |
2941-02-062 | Harris/ Houston | FM 2920 | Approved | $6,294,336 | 7 | HIGHWAY IMPROVEMENT | 0.0 |
1685-05-116 | Harris/ Houston | SH 6 | Approved | $10,514,083 | 1 | SURFACING/ROADWAY RESTORATION | 0.0 |
0912-00-534 | Harris/ Houston | VA | Tentative | $1,000,000 | 1 | REPLACE DYNAMIC MESSAGE SIGNS | 0.0 |
0508-01-370 | Harris/ Houston | IH 10 | Tentative | $57,468 | 10 | EMERGENCY RELIEF | 0.0 |
0912-00-539 | Harris/ Houston | VA | Tentative | $8,000,000 | 7 | REGIONAL TRAVEL MANAGEMENT PROGRAM | 0.0 |
0912-00-579 | Harris/ Houston | VA | Tentative | $1,170,400 | 1 | ADVANCED TRAFFIC MANAGEMENT SYSTEM | 0.0 |
0912-00-548 | Harris/ Houston | VA | Tentative | $3,750,000 | 3 | REGIONAL COMMUTE ALTERNATIVES PROGRAM | 0.0 |
0389-05-087 | Harris/ Houston | SH 146 | Approved | $87,205,000 | 1 | WIDEN ROAD - ADD LANES | 0.0 |
0178-01-039 | Harris/ Houston | SH 35 | Tentative | $30,000 | 10 | EMERGENCY RELIEF | 0.0 |
0912-72-458 | Harris/ Houston | CS | Tentative | $28,528 | 10 | EMERGENCY RELIEF | 0.0 |
0912-72-451 | Harris/ Houston | CR | Tentative | $28,268 | 10 | EMERGENCY RELIEF | 0.0 |
0912-72-443 | Harris/ Houston | CR | Tentative | $28,268 | 10 | EMERGENCY RELIEF | 0.0 |
0271-15-097 | Harris/ Houston | IH 610 | Approved | $6,000,000 | 6 | BRIDGE MAINTENANCE | 0.0 |
0912-72-436 | Harris/ Houston | CS | Tentative | $17,252 | 10 | EMERGENCY RELIEF | 0.0 |
0912-70-150 | Harris/ Houston | CS | Tentative | $8,283 | 10 | EMERGENCY RELIEF | 0.0 |
0912-70-151 | Harris/ Houston | CS | Tentative | $133,317 | 10 | EMERGENCY RELIEF | 0.0 |
0912-70-153 | Harris/ Houston | CS | Tentative | $80,944 | 10 | EMERGENCY RELIEF | 0.0 |
0912-70-152 | Harris/ Houston | CR | Tentative | $31,682 | 10 | EMERGENCY RELIEF | 0.0 |
0912-70-149 | Harris/ Houston | CS | Tentative | $25,169 | 10 | EMERGENCY RELIEF | 0.0 |
0912-00-625 | Harris/ Houston | VA | Approved | $950,000 | 8 | TRAFFIC SIGNAL IMPROVEMENTS | 0.0 |
0912-00-589 | Harris/ Houston | VA | Tentative | $4,160,000 | 1 | ADVANCED TRAFFIC MANAGEMENT SYSTEM | 0.0 |
0912-00-626 | Harris/ Houston | VA | Tentative | $2,383,720 | 8 | HIGHWAY IMPROVEMENT | 0.0 |
0912-72-437 | Harris/ Houston | CS | Tentative | $28,268 | 10 | EMERGENCY RELIEF | 0.0 |
0912-00-644 | Harris/ Houston | VA | Approved | $1,500,000 | 8 | HAZARD ELIMINATION & SAFETY | 0.0 |
0912-72-549 | Harris/ Houston | CS | Tentative | $68,672 | 10 | EMERGENCY RELIEF | 0.0 |
0912-72-547 | Harris/ Houston | CR | Tentative | $52,246 | 10 | EMERGENCY RELIEF | 0.0 |
0912-72-548 | Harris/ Houston | CS | Tentative | $32,250 | 10 | EMERGENCY RELIEF | 0.0 |
0912-70-154 | Harris/ Houston | CS | Tentative | $58,447 | 10 | EMERGENCY RELIEF | 0.0 |
0912-72-552 | Harris/ Houston | CS | Tentative | $147,046 | 10 | EMERGENCY RELIEF | 0.0 |
0912-72-554 | Harris/ Houston | VA | Tentative | $60,566 | 10 | EMERGENCY RELIEF | 0.0 |
0912-72-551 | Harris/ Houston | CR | Tentative | $72,605 | 10 | EMERGENCY RELIEF | 0.0 |
0912-72-550 | Harris/ Houston | CS | Tentative | $310,586 | 10 | EMERGENCY RELIEF | 0.0 |
0912-72-530 | Harris/ Houston | CR | Tentative | $28,269 | 10 | EMERGENCY RELIEF | 0.0 |
0912-72-460 | Harris/ Houston | CR | Tentative | $17,201 | 10 | EMERGENCY RELIEF | 0.0 |
0027-13-240 | Harris/ Houston | IH 69 | Approved | $500,000 | 11 | HIGHWAY IMPROVEMENT | 0.0 |
0912-72-459 | Harris/ Houston | CR | Tentative | $17,201 | 10 | EMERGENCY RELIEF | 0.0 |
0912-72-532 | Harris/ Houston | CR | Tentative | $82,109 | 3 | EMERGENCY RELIEF | 0.0 |
0912-72-531 | Harris/ Houston | CS | Tentative | $55,801 | 3 | EMERGENCY RELIEF | 0.0 |
0495-09-056 | Harrison/ Atlanta | IH 20 | Approved | $8,643,000 | 1 | BRIDGE REPLACEMENT | 0.0 |
0157-09-005 | Haskell/ Abilene | US 277 | Approved | $250,000 | 8 | INSTALL FLASHING BEACON | 0.0 |
0157-09-006 | Haskell/ Abilene | US 277 | Approved | $250,000 | 8 | INSTALL FLASHING BEACON | 0.0 |
1776-01-036 | Hays/ Austin | RM 967 | Approved | $7,174,290 | 3 | HAZARD ELIMINATION & SAFETY | 0.0 |
3545-01-005 | Hays/ Austin | FM 110 | Approved | $65,219,406 | 3 | CONSTRUCT NEW ROAD | 0.0 |
0987-03-012 | Hays/ Austin | FM 621 | Approved | $5,781,000 | 3 | WIDEN ROAD - ADD LANES | 0.0 |
0198-01-032 | Henderson/ Tyler | BU 175G | Approved | $791,000 | 8 | HAZARD ELIMINATION & SAFETY | 0.0 |
0921-02-389 | Hidalgo/ Pharr | VA | Tentative | $263,931 | 3 | CONSTRUCT PEDESTRIAN INFRASTRUCTURE | 0.0 |
0921-02-465 | Hidalgo/ Pharr | CR | Approved | $7,089,795 | 1 | ADVANCED TRAFFIC MANAGEMENT SYSTEM CONNECTION | 0.0 |
0621-01-109 | Hidalgo/ Pharr | SH 336 | Tentative | $250,000 | 8 | RAILROAD CROSSING IMPROVEMENTS | 0.0 |
1804-01-068 | Hidalgo/ Pharr | FM 1926 | Approved | $373,169 | 3 | INTERSECTION IMPROVEMENTS WITH RIGHT AND/OR LEFT TURN LANES | 0.0 |
1875-02-027 | Houston/ Lufkin | FM 2022 | Approved | $4,700,000 | 8 | WIDEN ROAD - ADD SHOULDERS | 0.0 |
0068-08-067 | Howard/ Abilene | US 87 | Approved | $6,835,542 | 11 | REHABILITATE EXISTING ROADWAY | 0.0 |
0068-07-052 | Howard/ Abilene | US 87 | Approved | $3,070,000 | 8 | HIGHWAY IMPROVEMENT | 0.0 |
1090-04-016 | Jackson/ Yoakum | FM 1593 | Approved | $3,460,000 | 1 | SURFACING/ROADWAY RESTORATION | 0.0 |
0920-00-143 | Jefferson/ Beaumont | VA | Tentative | $953,439 | 1 | ADVANCED TRAFFIC MANAGEMENT SYSTEM | 0.0 |
0065-07-068 | Jefferson/ Beaumont | US 69 | Approved | $1,451,266 | 8 | HAZARD ELIMINATION & SAFETY | 0.0 |
0200-15-026 | Jefferson/ Beaumont | US 69 | Approved | $7,897,104 | 8 | HAZARD ELIMINATION & SAFETY | 2.0 |
0747-05-041 | Johnson/ Ft Worth | FM 157 | Approved | $4,320,000 | 1 | RESURFACE ROADWAY | 0.0 |
2032-03-013 | Jones/ Abilene | FM 600 | Approved | $4,662,642 | 1 | PREVENTIVE MAINTENANCE | 0.0 |
0474-01-005 | Kimble/ San Angelo | PR 73 | Approved | $1,350,000 | 10 | BRIDGE REPLACEMENT | 0.0 |
0922-20-020 | La Salle/ Laredo | CR | Approved | $5,100,030 | 6 | BRIDGE REPLACEMENT | 0.0 |
0017-08-111 | La Salle/ Laredo | IH 35 | Approved | $1,240,446 | 8 | CONSTRUCT RAMPS | 0.0 |
0901-00-056 | Lamar/ Paris | VA | Approved | $3,000,000 | 10 | CONSTRUCT PEDESTRIAN INFRASTRUCTURE | 0.0 |
0593-01-130 | Liberty/ Beaumont | SH 105 | Approved | $900,763 | 8 | HAZARD ELIMINATION & SAFETY | 0.0 |
0028-03-107 | Liberty/ Beaumont | US 90 | Approved | $17,206,954 | 1 | HAZARD ELIMINATION & SAFETY | 0.0 |
1191-03-033 | Limestone/ Waco | FM 1245 | Approved | $2,803,539 | 6 | BRIDGE REPLACEMENT | 0.0 |
0150-04-046 | Llano/ Austin | SH 29 | Approved | $5,000,000 | 11 | HIGHWAY IMPROVEMENT | 0.0 |
0068-01-074 | Lubbock/ Lubbock | US 87 | Approved | $18,500,000 | 1 | CONSTRUCT BRIDGE | 0.0 |
1753-01-017 | Mason/ Austin | RM 1871 | Approved | $4,021,062 | 6 | BRIDGE REPLACEMENT | 0.0 |
0162-01-097 | Mclennan/ Waco | SH 31 | Approved | $11,168,109 | 1 | CONSTRUCT BRIDGE | 0.0 |
0833-03-051 | Mclennan/ Waco | FM 1637 | Approved | $144,179 | 3 | HAZARD ELIMINATION & SAFETY | 0.0 |
0035-05-061 | Menard/ San Angelo | US 83 | Tentative | $852,680 | 6 | BRIDGE MAINTENANCE | 0.0 |
0005-03-070 | Midland/ Odessa | BI 20-E | Tentative | $800,000 | 8 | TRAFFIC SIGNAL IMPROVEMENTS | 0.0 |
0005-03-073 | Midland/ Odessa | BI 20-E | Tentative | $500,000 | 8 | TRAFFIC SIGNAL IMPROVEMENTS | 0.0 |
0005-03-071 | Midland/ Odessa | BI 20-E | Tentative | $500,000 | 8 | TRAFFIC SIGNAL IMPROVEMENTS | 0.0 |
0005-03-072 | Midland/ Odessa | BI 20-E | Tentative | $800,000 | 8 | TRAFFIC SIGNAL IMPROVEMENTS | 0.0 |
0005-02-113 | Midland/ Odessa | BI 20-E | Tentative | $1,800,000 | 8 | TRAFFIC SIGNAL IMPROVEMENTS | 0.0 |
0224-03-060 | Montague/ Wichita Falls | US 287 | Approved | $2,528,736 | 11 | SURFACING/ROADWAY RESTORATION | 0.0 |
0523-09-009 | Montgomery/ Houston | FM 1488 | Approved | $46,000,000 | 1 | WIDEN ROAD - ADD LANES | 0.0 |
1259-01-044 | Montgomery/ Houston | FM 1097 | Tentative | $15,392,966 | 1 | WIDEN ROAD - ADD LANES | 0.0 |
3538-01-055 | Montgomery/ Houston | SH 242 | Approved | $31,303,598 | 1 | WIDEN ROAD - ADD LANES | 0.0 |
0650-01-034 | Nolan/ Abilene | SH 153 | Approved | $7,355,558 | 8 | WIDEN ROAD - ADD SHOULDERS | 0.0 |
0086-20-023 | Nueces/ Corpus Christi | FM 665 | Approved | $2,930,211 | 8 | HAZARD ELIMINATION & SAFETY | 0.0 |
0916-00-217 | Nueces/ Corpus Christi | VA | Approved | $1,000,000 | 1 | HIGHWAY IMPROVEMENT | 0.0 |
2562-01-023 | Orange/ Beaumont | FM 1442 | Approved | $3,690,354 | 8 | CONSTRUCT NEW ROAD | 0.0 |
0028-14-116 | Orange/ Beaumont | IH 10 | Approved | $10,948,422 | 6 | BRIDGE MAINTENANCE | 6.0 |
0902-39-040 | Palo Pinto/ Ft Worth | VA | Approved | $6,787,921 | 10 | STATE PARK IMPROVEMENTS | 0.0 |
0902-38-129 | Parker/ Ft Worth | CS | Approved | $1,411,077 | 6 | BRIDGE REPLACEMENT | 0.0 |
1408-01-027 | Polk/ Lufkin | FM 1276 | Approved | $340,843 | 8 | INSTALL FLASHING BEACON | 0.0 |
0213-04-050 | Polk/ Lufkin | US 190 | Approved | $29,000,000 | 8 | INTERSECTION IMPROVEMENTS WITH RIGHT AND/OR LEFT TURN LANES | 0.0 |
0904-00-197 | Potter/ Amarillo | VA | Approved | $5,200,000 | 8 | HIGHWAY IMPROVEMENT | 0.0 |
1480-02-036 | Randall/ Amarillo | FM 1541 | Approved | $5,325,000 | 8 | INTERSECTION IMPROVEMENTS WITH RIGHT AND/OR LEFT TURN LANES | 0.0 |
0189-01-012 | Red River/ Paris | SH 37 | Approved | $8,974,328 | 1 | PREVENTIVE MAINTENANCE | 0.0 |
0901-27-046 | Red River/ Paris | CS | Tentative | $487,084 | 6 | BRIDGE REPLACEMENT | 0.0 |
0049-14-014 | Robertson/ Bryan | FM 46 | Approved | $2,934,907 | 1 | HAZARD ELIMINATION & SAFETY | 0.0 |
0180-10-081 | San Patricio/ Corpus Christi | SH 361 | Tentative | $30,000 | 1 | RAILROAD CROSSING IMPROVEMENTS | 0.0 |
0180-06-067 | San Patricio/ Corpus Christi | SH 35 | Approved | $23,000,000 | 8 | INTERCHANGE IMPROVEMENT (NEW OR UPDATE) | 0.0 |
0507-03-048 | San Patricio/ Corpus Christi | SH 188 | Tentative | $621 | 10 | EMERGENCY RELIEF | 0.0 |
0507-03-047 | San Patricio/ Corpus Christi | SH 188 | Tentative | $7,182 | 10 | EMERGENCY RELIEF | 0.0 |
1209-02-020 | San Patricio/ Corpus Christi | FM 631 | Tentative | $520 | 10 | EMERGENCY RELIEF | 0.0 |
0927-01-033 | Smith/ Tyler | Approved | $520,000 | 8 | HAZARD ELIMINATION & SAFETY | 0.0 | |
0606-01-007 | Smith/ Tyler | PR 16 | Approved | $905,036 | 10 | STATE PARK IMPROVEMENTS | 0.0 |
0902-00-173 | Tarrant/ Ft Worth | VA | Tentative | $5,367,819 | 5 | MAINTENANCE & OPERATIONS PROJECT | 0.0 |
0008-05-031 | Tarrant/ Ft Worth | SH 180 | Approved | $2,130,423 | 8 | CONSTRUCT PEDESTRIAN INFRASTRUCTURE | 0.0 |
0902-00-204 | Tarrant/ Ft Worth | VA | Approved | $3,500,000 | 1 | REHABILITATE EXISTING ROADWAY | 0.0 |
0353-03-102 | Tarrant/ Ft Worth | SH 114 | Tentative | $62,334 | 3 | INSTALL/REHABILITATE ITS | 0.0 |
0172-09-037 | Tarrant/ Ft Worth | US 287 | Approved | $32,457,359 | 1 | WIDEN ROAD - ADD SHOULDERS | 0.0 |
0014-01-025 | Tarrant/ Ft Worth | BU 287P | Approved | $502,787 | 1 | INSTALL TRAFFIC SIGNAL | 0.0 |
0902-00-221 | Tarrant/ Ft Worth | VA | Tentative | $2,120,000 | 7 | MAINTENANCE & OPERATIONS PROJECT | 0.0 |
0902-90-105 | Tarrant/ Ft Worth | VA | Approved | $1,957,380 | 1 | INSTALL ILLUMINATION | 0.0 |
0902-90-096 | Tarrant/ Ft Worth | CS | Approved | $556,903 | 3 | INSTALL TRAFFIC SIGNAL | 0.0 |
0902-90-127 | Tarrant/ Ft Worth | VA | Tentative | $26,850,000 | 3 | RAILROAD CROSSING IMPROVEMENTS | 0.0 |
0902-90-121 | Tarrant/ Ft Worth | VA | Tentative | $50,000 | 7 | MAINTENANCE & OPERATIONS PROJECT | 0.0 |
0902-00-222 | Tarrant/ Ft Worth | VA | Tentative | $2,120,000 | 7 | MAINTENANCE & OPERATIONS PROJECT | 0.0 |
0902-90-057 | Tarrant/ Ft Worth | CS | Approved | $823,301 | 6 | BRIDGE REPLACEMENT | 0.0 |
0902-90-055 | Tarrant/ Ft Worth | VA | Tentative | $50,000 | 7 | MAINTENANCE & OPERATIONS PROJECT | 0.0 |
0699-01-052 | Taylor/ Abilene | FM 89 | Approved | $21,650,000 | 1 | WIDEN ROAD - ADD LANES | 0.0 |
2270-01-023 | Taylor/ Abilene | FM 3438 | Approved | $4,222,740 | 1 | PREVENTIVE MAINTENANCE | 0.0 |
0663-02-010 | Taylor/ Abilene | FM 707 | Approved | $1,060,000 | 8 | INTERSECTION IMPROVEMENTS WITH RIGHT AND/OR LEFT TURN LANES | 0.0 |
0159-01-042 | Tom Green/ San Angelo | US 277 | Approved | $277,844 | 8 | HIGHWAY IMPROVEMENT | 0.0 |
0914-04-319 | Travis/ Austin | VA | Approved | $1,668,000 | 3 | INSTALL FLASHING BEACON | 0.0 |
1378-01-040 | Travis/ Austin | RM 1431 | Tentative | $856,550 | 1 | INFRASTRUCTURE IMPROVEMENTS | 0.0 |
0914-04-311 | Travis/ Austin | VA | Approved | $1,470,000 | 3 | HIKE AND/OR BIKE | 0.0 |
0015-13-419 | Travis/ Austin | IH 35 | Approved | $8,757,066 | 1 | PREVENTIVE MAINTENANCE | 0.0 |
0914-00-412 | Travis/ Austin | VA | Tentative | $1,000,000 | 1 | PURCHASE AND INSTALL SIGNS & EQUIP | 0.0 |
0161-03-024 | Val Verde/ Laredo | SS 239 | Approved | $1,768,357 | 8 | HAZARD ELIMINATION & SAFETY | 0.0 |
0108-02-033 | Van Zandt/ Tyler | SH 19 | Approved | $11,901,000 | 1 | HIGHWAY IMPROVEMENT | 0.0 |
0088-05-098 | Victoria/ Yoakum | US 59 | Approved | $11,200,000 | 1 | CONVERT NON-FREEWAY | 0.0 |
1687-01-018 | Waller/ Houston | FM 1736 | Approved | $89,804 | 1 | HAZARD ELIMINATION & SAFETY | 0.0 |
2371-01-012 | Ward/ Odessa | PR 41 | Approved | $398,315 | 10 | STATE PARK IMPROVEMENTS | 0.0 |
0114-09-089 | Washington/ Bryan | US 290 | Approved | $2,120,507 | 8 | INSTALL FLASHING BEACON | 0.0 |
0542-01-097 | Webb/ Laredo | BU 59-Z | Approved | $866,789 | 8 | HAZARD ELIMINATION & SAFETY | 0.0 |
0038-01-095 | Webb/ Laredo | US 83 | Approved | $374,990 | 8 | HAZARD ELIMINATION & SAFETY | 0.0 |
0018-04-064 | Webb/ Laredo | IH 35 | Approved | $3,130,061 | 11 | REMOVE/REPLACE BRIDGE RAIL | 0.0 |
0027-04-042 | Wharton/ Yoakum | US 90A | Approved | $3,829,053 | 8 | HAZARD ELIMINATION & SAFETY | 0.0 |
1236-01-015 | Willacy/ Pharr | FM 1018 | Approved | $17,537,988 | 8 | RECONSTRUCT EXISTING ROADWAY | 0.0 |
0190-03-087 | Wood/ Tyler | SH 37 | Approved | $4,596,702 | 1 | PREVENTIVE MAINTENANCE | 0.0 |
0134-02-059 | Young/ Wichita Falls | US 380 | Approved | $4,127,555 | 8 | HAZARD ELIMINATION & SAFETY | 0.0 |
|