Letting Schedule for November, 2018 County (FY 2019)
Bid Tabulations Dashboard
Use this interactive Tableau dashboard to display bidding information on projects let through statewide and local district letting for the past 24 months. The Electronic State Business Daily (ESBD), the Electronic Bidding System, and the project proposal are the official sources of advertisement and bidding information for the State and Local Lettings. Bidders should bid the project using the information found therein, including any addenda. These sources take precedence over information from other sources, including TxDOT webpages, which are unofficial and intended for informational purposes only. |
|
November, 2018 (FY 2019) | (see Links) |
SEP 2018 | OCT 2018 | NOV 2018 | DEC 2018 | JAN 2019 | FEB 2019 | MAR 2019 | APR 2019 | MAY 2019 | JUN 2019 | JUL 2019 | AUG 2019 | | |||||||
CCSJ | County/ District | Highway | Let Status | Contract Cost | Fund Cat | Description | DBE Goal |
---|---|---|---|---|---|---|---|
0180-04-127 | Aransas/ Corpus Christi | SH 35 | Actual | $168,630 | 10 | REPLACE 241 SMALL SIGN AND SUPPORT ASSEMBLIES DAMAGED BY | 0.0 |
0114-05-037 | Bastrop/ Austin | US 290 | Actual | $34,643,154 | 1 | RECONSTRUCT EXISTING 4-LN UNDIVIDED ROADWAY TO A 4-LN | 8.5 |
0914-18-110 | Bastrop/ Austin | CR | Actual | $451,679 | 6 | REPLACE BRIDGE AND APPROACHES | 0.0 |
0836-02-025 | Bell/ Waco | SH 195 | Actual | $339,204 | 1 | SAFETY LIGHTING | 0.0 |
0909-36-157 | Bell/ Waco | CS | Actual | $2,375,101 | 3 | CONSTRUCT HIKE AND BIKE TRAIL AND SIDEWALKS WITH LANDSCAPING | 0.0 |
0915-00-207 | Bexar/ San Antonio | VA | Actual | $441,854 | 1 | IMPROVEMENTS TO PEDESTRIAN CROSSINGS | 0.0 |
0915-12-547 | Bexar/ San Antonio | NR | Actual | $100,000 | 3 | ALAMO AREA COMMUTE SOLUTION PGM-FY 2017 | 0.0 |
0218-01-096 | Bowie/ Atlanta | US 59 | Actual | $4,788,910 | 1 | RESURFACE EXSTING 4-LANE ROADWAY | 0.0 |
0046-05-050 | Bowie/ Atlanta | US 82 | Actual | $470,867 | 1 | RESURFACE EXISTING 2-LANE HIGHWAY | 0.0 |
0255-04-094 | Brooks/ Pharr | US 281 | Actual | $16,294,519 | 1 | REHABILITATE ROADWAY | 0.0 |
0920-39-024 | Chambers/ Beaumont | VA | Actual | $1,071,385 | 3 | INSTALL PEDESTRIAN ILLUMINATION | 0.0 |
0920-39-025 | Chambers/ Beaumont | VA | Actual | $1,188,761 | 3 | CONSTRUCT SIDEWALKS | 6.0 |
0508-03-104 | Chambers/ Beaumont | IH 10 | Actual | $318,989 | 8 | MILLED EDGELINE RUMBLE STRIPS, MILLED CENTERLINE RUMBLE | 0.0 |
0044-07-071 | Cooke/ Wichita Falls | US 82 | Actual | $4,541,277 | 1 | PAVEMENT REPAIR AND OVERLAY | 0.0 |
0918-00-290 | Dallas/ Dallas | VA | Actual | $4,155,844 | 7 | MOBILITY ASSISTANCE PATROL THAT PROVIDES ASSISTANCE TO | 0.0 |
0918-47-233 | Dallas/ Dallas | VA | Actual | $625,000 | 3 | PRELIMINARY ENGINEERING FOR VELOWEB SHARED-USE PATH | 0.0 |
0941-02-020 | Dewitt/ Yoakum | FM 2656 | Actual | $4,158,113 | 1 | REHABILITATE EXISTING ROADWAY | 6.0 |
0143-09-070 | Dewitt/ Yoakum | US 87 | Actual | $107,997 | 10 | LANDSCAPE DEVELOPMENT ON US 87 IN CUERO | 0.0 |
0007-03-092 | Eastland/ Brownwood | IH 20 | Actual | $8,402,295 | 1 | SEAL COAT | 0.0 |
0906-00-185 | Ector/ Odessa | VA | Actual | $1,293,074 | 1 | CULVERT/STRUCTURE REPAIR | 8.0 |
0906-00-186 | Ector/ Odessa | VA | Actual | $2,792,898 | 1 | INSTALL OVER-HEIGHT BRIDGE DETECTION SYSTEMS | 0.0 |
2224-01-100 | Ector/ Odessa | SL 338 | Actual | $1,663,725 | 1 | RECONSTRUCT INTERSECTION WITH TRAFFIC SIGNALS & ILLUMINATION | 5.5 |
0167-01-113 | El Paso/ El Paso | US 54 | Actual | $99,168,098 | 11 | US 54/IH10/IH110/LOOP 375 INTERCHANGE IMPROVEMENTS | 9.0 |
2139-03-021 | Fannin/ Paris | SH 11 | Actual | $3,494,604 | 1 | OVERLAY | 0.0 |
0145-11-011 | Floyd/ Lubbock | FM 97 | Actual | $9,871,566 | 1 | REHABILITATION OF ROADWAY | 5.0 |
2817-01-010 | Fort Bend/ Houston | FM 2759 | Actual | $5,461,236 | 1 | ADD 4' SHOULDERS, BASE REPAIR, 1.5" ACP OVERLAY, PAVEMENT | 7.0 |
0025-07-065 | Gonzales/ Yoakum | SH 97 | Actual | $6,763,132 | 1 | SEAL COAT | 0.0 |
0715-01-014 | Gonzales/ Yoakum | FM 108 | Actual | $2,210,730 | 6 | REPLACE BRIDGE AND APPROACHES | 7.0 |
0309-01-043 | Gray/ Amarillo | SH 70 | Actual | $1,913,557 | 8 | MILLED EDGELINE & MILLED CENTERLINE RUMBLE STRIPS | 0.0 |
0081-10-040 | Grayson/ Paris | US 377 | Actual | $30,066,755 | 6 | BRIDGE REPLACEMENT | 0.0 |
0025-10-092 | Guadalupe/ San Antonio | FM 78 | Actual | $7,854,130 | 1 | SPOT BASE REPAIR, OVERLAY & PAVEMENT MARKINGS | 6.0 |
0067-04-054 | Hale/ Lubbock | IH 27 | Actual | $5,438,802 | 1 | SEAL COAT | 0.0 |
1053-01-016 | Hall/ Childress | FM 658 | Actual | $851,726 | 1 | CULVERT EXTENSIONS & SAFETY END TREATMENTS | 0.0 |
0120-05-025 | Hamilton/ Waco | FM 218 | Actual | $510,929 | 1 | INSTALL CHEVRONS ON CURVE, INCREASE SUPERELELVATION | 0.0 |
2941-02-055 | Harris/ Houston | FM 2920 | Actual | $8,623,632 | 1 | BASE REPAIR, 1.25 INCH MILLING, THIN OVERLAY MIX, METAL | 0.0 |
0912-00-597 | Harris/ Houston | VA | Actual | $125,000 | 10 | MULTIMODAL NETWORK CONNECTIVITY PILOT STUDIES (NON-LET) | 0.0 |
0389-05-124 | Harris/ Houston | SH 146 | Actual | $2,153,827 | 1 | REMOVE MEDIAN RAIL W/FENCING & REPL W/ CONC TRAFFIC BARRIER | 0.0 |
0030-05-067 | Hemphill/ Amarillo | US 83 | Actual | $8,516,127 | 1 | SEALCOAT | 0.0 |
0697-02-039 | Henderson/ Tyler | SH 334 | Actual | $38,888,999 | 1 | CONSTRUCT 2 LN STRUCTURE TO COMPLETE 4 LN FACILITY | 5.0 |
0635-03-025 | Houston/ Lufkin | FM 228 | Actual | $3,635,559 | 1 | RESURFACE WITH SEALCOAT | 0.0 |
0002-07-049 | Hudspeth/ El Paso | IH 10 | Actual | $5,530,090 | 6 | REPLACE BRIDGES AND APPROACHES | 5.5 |
0018-01-093 | La Salle/ Laredo | IH 35 | Actual | $11,119,058 | 1 | REHABILITATION OF EXISTING HIGHWAY | 6.0 |
0445-02-066 | Lavaca/ Yoakum | US 90A | Actual | $794,803 | 1 | MILL AND INLAY | 0.0 |
0593-01-128 | Liberty/ Beaumont | SH 105 | Actual | $5,084 | 10 | TS HARVEY EMERGENCY REPAIR DONE W/ 47Y00279 | 0.0 |
0056-02-033 | Limestone/ Waco | US 84 | Actual | $9,150,814 | 1 | WIDEN SHOULDERS AND ADD PASSING LANES | 6.5 |
0053-03-021 | Lynn/ Lubbock | US 84 | Actual | $6,946,378 | 1 | SEAL COAT | 0.0 |
0068-02-048 | Lynn/ Lubbock | US 87 | Actual | $5,923,698 | 1 | SEAL COAT | 0.0 |
0150-01-028 | Mason/ Austin | SH 29 | Actual | $703,516 | 1 | FULL DEPTH REPAIR, SEAL AND TOM OVERLAY | 0.0 |
0604-01-043 | Matagorda/ Yoakum | FM 2031 | Actual | $594,825 | 8 | PROVIDE ADDITIONAL PAVED SURFACE WIDTH | 0.0 |
0010-08-055 | Morris/ Atlanta | US 67 | Actual | $417,187 | 8 | SAFETY LIGHTING | 0.0 |
0092-13-024 | Navarro/ Dallas | BI 45-F | Actual | $8,498,511 | 1 | REPLACE BRIDGE AND APPROACHES | 7.5 |
0304-06-077 | Newton/ Beaumont | SH 87 | Actual | $14,919 | 10 | TS HARVEY EMERGENCY REPAIR DONE WITH 47Y00279 | 0.0 |
0244-04-056 | Newton/ Beaumont | US 190 | Actual | $13,143 | 10 | TS HARVEY EMERGENCY REPAIR DONE WITH 47Y00279 | 0.0 |
2263-02-098 | Nueces/ Corpus Christi | SH 361 | Actual | $3,694,317 | 6 | BRIDGE REHABILITATION (DALE MILLER BRIDGE) | 7.0 |
2263-02-001 | Nueces/ Corpus Christi | SH 361 | Actual | $4,345,579 | 10 | REPLACE DAMAGED PILE CLUSTERS, FENDERS, TOWER,CATWALKS, RAMP | 0.0 |
0490-03-028 | Ochiltree/ Amarillo | SH 70 | Actual | $13,127,047 | 11 | BASE REPAIR AND OVERLAY | 0.0 |
0176-05-186 | Polk/ Lufkin | US 59 | Actual | $1,858 | 10 | EMERGENCY EROSION REPAIRS | 0.0 |
0176-05-184 | Polk/ Lufkin | US 59 | Actual | $8,468 | 10 | EMERGENCY EROSION REPAIRS | 0.0 |
1876-01-036 | Polk/ Lufkin | FM 1988 | Actual | $116,154 | 10 | REESTABLISH SLOPE NEAR COLUMNS, REPLACE STONE RIPRAP IN THE | 0.0 |
1876-01-037 | Polk/ Lufkin | FM 1988 | Actual | $27,310 | 10 | PLACE FLOWABLE FILL UNDER RIPRAP SLOPE TO FILL VOID AND TO | 0.0 |
1408-01-025 | Polk/ Lufkin | FM 1276 | Actual | $128,133 | 10 | EMERGENCY ROADWAY REPAIRS | 0.0 |
0041-07-107 | Potter/ Amarillo | US 87 | Actual | $8,607,384 | 1 | SEALCOAT NB & SB FRONTAGE ROADS | 0.0 |
0155-05-043 | Refugio/ Corpus Christi | US 183 | Actual | $11,904 | 10 | REPAIR OR REPLACE SCHOOL ZONE FLASHERS DAMAGED BY HIGH WINDS | 0.0 |
1679-01-015 | Sabine/ Lufkin | FM 276 | Actual | $11,416 | 10 | EMERGENCY EROSION REPAIRS | 0.0 |
2829-02-008 | San Jacinto/ Lufkin | FM 2693 | Actual | $46,305 | 10 | EMERGENCY ROADWAY REPAIRS | 0.0 |
0177-02-098 | San Jacinto/ Lufkin | US 59 | Actual | $15,746 | 10 | REPLACED FLOWABLE BACKFILL IN THE VOID AT THE ABUTMENT | 0.0 |
0395-02-046 | San Jacinto/ Lufkin | SH 150 | Actual | $9,222 | 10 | EMERGENCY EROSION REPAIRS | 0.0 |
0395-02-044 | San Jacinto/ Lufkin | SH 150 | Actual | $90,642 | 10 | EMERGENCY ROADWAY REPAIRS | 0.0 |
0059-05-045 | Shelby/ Lufkin | SH 7 | Actual | $10,363,089 | 1 | Highway Improvement | 0.0 |
0902-00-166 | Tarrant/ Ft Worth | VA | Actual | $5,307,200 | 1 | NON-SITE SPECIFIC TRAFFIC SIGNAL INSTALLATION | 3.5 |
1378-01-038 | Travis/ Austin | RM 1431 | Actual | $620,601 | 8 | INSTALL CONTINUOUS TURN LANE, CONSTRUCT PAVED SHOULDERS | 0.0 |
0914-00-414 | Travis/ Austin | VA | Actual | $1,991,359 | 1 | RESTRIPING & REPLACEMENT OF RAISED PAVEMENT MARKS ON US 281 | 0.0 |
0914-00-415 | Travis/ Austin | VA | Actual | $873,308 | 1 | RESTRIPING & REPLACEMENT OF RAISED PAVEMENT MARKS ON US 183, | 0.0 |
0914-00-418 | Travis/ Austin | VA | Actual | $1,910,150 | 1 | ASPHALT PAVEMENT REPAIR | 0.0 |
0213-06-042 | Tyler/ Beaumont | US 190 | Actual | $8,047 | 10 | TS HARVEY EMERGENCY REPAIR DONE WITH 47Y00279 | 0.0 |
1828-01-029 | Tyler/ Beaumont | FM 1943 | Actual | $5,273 | 10 | TS HARVEY EMERGENCY REPAIR DONE WITH 47Y00279 | 0.0 |
0037-01-042 | Uvalde/ San Antonio | US 83 | Actual | $11,781,923 | 1 | REHAB EXISTING ROADWAY | 0.0 |
0922-11-031 | Val Verde/ Laredo | CS | Actual | $2,785,000 | 3 | NEW LOCATION TWO LANE HIGHWAY | 0.0 |
0922-00-069 | Webb/ Laredo | VA | Actual | $839,242 | 11 | THERMOPLASTIC RE-STRIPING DIMMIT, ZAVALA, MAVERICK, KINNEY A | 0.0 |
0044-11-002 | Wichita/ Wichita Falls | BU 287J | Actual | $9,517,380 | 1 | SEAL COAT | 0.0 |
|