Letting Schedule for July, 2019 County (FY 2019)
Bid Tabulations Dashboard
Use this interactive Tableau dashboard to display bidding information on projects let through statewide and local district letting for the past 24 months. The Electronic State Business Daily (ESBD), the Electronic Bidding System, and the project proposal are the official sources of advertisement and bidding information for the State and Local Lettings. Bidders should bid the project using the information found therein, including any addenda. These sources take precedence over information from other sources, including TxDOT webpages, which are unofficial and intended for informational purposes only. |
|
July, 2019 (FY 2019) | (see Links) |
SEP 2018 | OCT 2018 | NOV 2018 | DEC 2018 | JAN 2019 | FEB 2019 | MAR 2019 | APR 2019 | MAY 2019 | JUN 2019 | JUL 2019 | AUG 2019 | | |||||||
CCSJ | County/ District | Highway | Let Status | Contract Cost | Fund Cat | Description | DBE Goal |
---|---|---|---|---|---|---|---|
0206-01-050 | Anderson/ Tyler | US 79 | Actual | $13,470,239 | 1 | HIGHWAY IMPROVEMENT | 6.0 |
0548-01-034 | Andrews/ Odessa | SH 176 | Actual | $10,744,351 | 1 | CONSTRUCT BRIDGE | 5.0 |
0911-00-076 | Angelina/ Lufkin | VA | Actual | $4,277,919 | 10 | CONSTRUCT PEDESTRIAN INFRASTRUCTURE | 12.0 |
2507-01-020 | Angelina/ Lufkin | FM 326 | Actual | $3,876,890 | 11 | HIGHWAY IMPROVEMENT | 8.0 |
0336-05-066 | Angelina/ Lufkin | SH 103 | Actual | $2,137,153 | 6 | BRIDGE MAINTENANCE | 2.0 |
1549-01-052 | Aransas/ Corpus Christi | FM 1781 | Actual | $5,239 | 10 | EMERGENCY RELIEF | 0.0 |
0253-04-158 | Bexar/ San Antonio | US 281 | Actual | $2,723,087 | 10 | ADVANCED TRAFFIC MANAGEMENT SYSTEM | 0.0 |
0521-04-204 | Bexar/ San Antonio | IH 410 | Actual | $89,196,311 | 1 | WIDEN ROAD - ADD LANES | 13.5 |
0915-12-622 | Bexar/ San Antonio | CS | Actual | $1,781,470 | 3 | HAZARD ELIMINATION & SAFETY | 2.0 |
0017-10-288 | Bexar/ San Antonio | IH 35 | Actual | $1,226,147 | 1 | HAZARD ELIMINATION & SAFETY | 3.0 |
0017-09-105 | Bexar/ San Antonio | IH 35 | Actual | $734,467 | 10 | LANDSCAPE DEVELOPMENT | 0.0 |
1090-05-018 | Calhoun/ Yoakum | FM 1593 | Actual | $4,415,427 | 1 | SURFACING/ROADWAY RESTORATION | 1.5 |
0919-00-079 | Cass/ Atlanta | VA | Actual | $1,272,920 | 1 | HIGHWAY IMPROVEMENT | 0.0 |
0198-07-014 | Cherokee/ Tyler | SH 204 | Actual | $14,677,601 | 1 | HIGHWAY IMPROVEMENT | 7.0 |
0137-10-025 | Clay/ Wichita Falls | FM 174 | Actual | $702,818 | 1 | HAZARD ELIMINATION & SAFETY | 0.0 |
0091-05-059 | Collin/ Dallas | SH 289 | Actual | $4,087,249 | 5 | CONSTRUCT NEW ROAD | 5.0 |
0918-24-239 | Collin/ Dallas | CS | Actual | $700,000 | 3 | TRANSPORTATION NON-ROADWAY | 0.0 |
0070-05-037 | Concho/ San Angelo | US 87 | Actual | $12,619,079 | 1 | HIGHWAY IMPROVEMENT | 8.0 |
0823-01-036 | Cooke/ Wichita Falls | FM 2382 | Actual | $5,731,881 | 1 | SURFACING/ROADWAY RESTORATION | 7.5 |
0925-14-009 | Cottle/ Childress | CR | Actual | $520,123 | 6 | BRIDGE REPLACEMENT | 0.0 |
1643-01-016 | Crockett/ San Angelo | SH 137 | Actual | $14,210,778 | 11 | SURFACING/ROADWAY RESTORATION | 2.0 |
0918-00-288 | Dallas/ Dallas | VA | Actual | $2,550,000 | 1 | TRAFFIC SIGNAL IMPROVEMENTS | 3.0 |
0196-03-278 | Dallas/ Dallas | IH 35E | Actual | $4,776,141 | 1 | REHABILITATE EXISTING ROADWAY | 0.0 |
0136-03-065 | Delta/ Paris | SH 24 | Actual | $1,494,011 | 1 | HAZARD ELIMINATION & SAFETY | 6.5 |
0918-46-279 | Denton/ Dallas | VA | Actual | $3,061,437 | 10 | CONSTRUCT RAMPS | 11.0 |
0906-00-184 | Ector/ Odessa | VA | Actual | $958,092 | 1 | REPLACE GUARDRAIL | 0.0 |
0228-06-087 | Ector/ Odessa | US 385 | Actual | $660,977 | 1 | TRAFFIC SIGNAL IMPROVEMENTS | 0.0 |
0924-06-548 | El Paso/ El Paso | VA | Actual | $736,678 | 3 | CONSTRUCT PEDESTRIAN INFRASTRUCTURE | 0.0 |
0924-06-539 | El Paso/ El Paso | CS | Approved | $1,297,000 | 3 | INFRASTRUCTURE IMPROVEMENTS | 0.0 |
2552-01-058 | El Paso/ El Paso | SL 375 | Actual | $17,614,547 | 1 | HAZARD ELIMINATION & SAFETY | 11.0 |
2121-04-111 | El Paso/ El Paso | IH 10 | Actual | $696,549 | 10 | LANDSCAPE DEVELOPMENT | 0.0 |
0901-32-085 | Fannin/ Paris | CR | Actual | $1,383,879 | 6 | BRIDGE REPLACEMENT | 3.0 |
2820-01-012 | Fayette/ Yoakum | FM 2762 | Actual | $6,543,648 | 1 | SURFACING/ROADWAY RESTORATION | 0.0 |
0323-02-034 | Fayette/ Yoakum | SH 95 | Actual | $16,950,085 | 1 | SURFACING/ROADWAY RESTORATION | 3.0 |
3135-01-005 | Fayette/ Yoakum | FM 2714 | Actual | $1,988,584 | 1 | SURFACING/ROADWAY RESTORATION | 0.0 |
0017-07-136 | Frio/ San Antonio | IH 35 | Actual | $924,317 | 1 | HAZARD ELIMINATION & SAFETY | 7.0 |
0051-04-067 | Galveston/ Houston | SH 87 | Actual | $8,231,409 | 1 | SURFACING/ROADWAY RESTORATION | 7.0 |
0367-05-050 | Galveston/ Houston | SH 87 | Actual | $26,142,000 | 10 | FERRY OPERATION PROJECTS | 0.0 |
0155-04-055 | Goliad/ Corpus Christi | US 183 | Actual | $29,432,416 | 11 | WIDEN ROAD - ADD LANES | 3.0 |
0729-01-039 | Grayson/ Paris | FM 121 | Actual | $12,158,009 | 1 | WIDEN ROAD - ADD LANES | 6.0 |
0901-19-179 | Grayson/ Paris | CR | Actual | $1,159,202 | 6 | BRIDGE REPLACEMENT | 0.0 |
0366-12-030 | Guadalupe/ San Antonio | BS 123B | Actual | $1,013,689 | 1 | TRAFFIC SIGNAL IMPROVEMENTS | 5.0 |
0067-04-055 | Hale/ Lubbock | IH 27 | Actual | $36,241,761 | 1 | HAZARD ELIMINATION & SAFETY | 10.0 |
0065-06-066 | Hardin/ Beaumont | US 69 | Actual | $18,681 | 10 | EMERGENCY RELIEF | 0.0 |
0912-72-340 | Harris/ Houston | CS | Actual | $13,802,148 | 3 | WIDEN ROAD - ADD LANES | 6.0 |
0912-70-093 | Harris/ Houston | CS | Actual | $4,190,235 | 6 | BRIDGE REPLACEMENT | 8.0 |
0912-72-373 | Harris/ Houston | CS | Actual | $14,590,643 | 3 | SURFACING/ROADWAY RESTORATION | 11.0 |
1062-04-058 | Harris/ Houston | FM 2100 | Actual | $22,119,617 | 2M | WIDEN ROAD - ADD LANES | 9.0 |
0271-14-235 | Harris/ Houston | IH 610 | Actual | $1,559,230 | 10 | LANDSCAPE DEVELOPMENT | 0.0 |
0050-09-095 | Harris/ Houston | US 290 | Actual | $2,139,748 | 10 | LANDSCAPE DEVELOPMENT | 0.0 |
0110-05-132 | Harris/ Houston | IH 45 | Actual | $1,733,904 | 10 | LANDSCAPE DEVELOPMENT | 0.0 |
3545-02-007 | Hays/ Austin | FM 110 | Actual | $14,103,421 | 3 | CONSTRUCT NEW ROAD | 0.0 |
0921-02-369 | Hidalgo/ Pharr | VA | Actual | $2,700,000 | 3 | CONSTRUCT NEW ROADWAY LANES | 0.0 |
0937-02-030 | Houston/ Lufkin | FM 227 | Actual | $1,363,450 | 6 | BRIDGE REPLACEMENT | 4.0 |
0668-04-004 | Howard/ Abilene | FM 700 | Actual | $6,537,229 | 11 | CONSTRUCT BRIDGE | 4.0 |
2121-06-044 | Hudspeth/ El Paso | IH 10 | Actual | $2,948,780 | 1 | HAZARD ELIMINATION & SAFETY | 0.0 |
0249-07-075 | Jack/ Ft Worth | US 281 | Actual | $2,661,496 | 1 | RESURFACE ROADWAY | 2.0 |
0089-03-092 | Jackson/ Yoakum | US 59 | Actual | $2,004,235 | 1 | HAZARD ELIMINATION & SAFETY | 0.0 |
0920-38-260 | Jefferson/ Beaumont | CS | Actual | $1,218,344 | 3 | SURFACING/ROADWAY RESTORATION | 0.0 |
0667-02-111 | Jefferson/ Beaumont | FM 366 | Actual | $641,307 | 1 | TRAFFIC SIGNAL IMPROVEMENTS | 0.0 |
0368-02-045 | Jefferson/ Beaumont | SH 124 | Actual | $13,584 | 10 | EMERGENCY RELIEF | 0.0 |
0255-01-084 | Jim Wells/ Corpus Christi | US 281 | Actual | $5,281,164 | 1 | SURFACING/ROADWAY RESTORATION | 0.0 |
0142-15-026 | Kendall/ San Antonio | IH 10 | Actual | $11,524,545 | 1 | HIGHWAY IMPROVEMENT | 8.0 |
0291-03-071 | Kerr/ San Antonio | SH 16 | Actual | $5,254,150 | 1 | SURFACING/ROADWAY RESTORATION | 4.0 |
0813-01-104 | Liberty/ Beaumont | FM 787 | Actual | $7,459 | 10 | EMERGENCY RELIEF | 0.0 |
0355-01-050 | Lipscomb/ Amarillo | SH 15 | Actual | $3,064,978 | 6 | BRIDGE REPLACEMENT | 6.0 |
0547-01-026 | Llano/ Austin | SH 261 | Actual | $604,013 | 8 | CONSTRUCT FRONTAGE ROADS | 0.0 |
0783-02-099 | Lubbock/ Lubbock | SL 289 | Actual | $1,364,002 | 1 | HAZARD ELIMINATION & SAFETY | 0.0 |
0070-06-049 | Mcculloch/ Brownwood | US 87 | Actual | $509,129 | 1 | CONSTRUCT NEW ROAD | 8.0 |
0909-22-177 | Mclennan/ Waco | CR | Actual | $976,069 | 3 | BRIDGE REPLACEMENT | 7.0 |
0380-09-093 | Midland/ Odessa | BS 349C | Actual | $1,942,606 | 1 | TRAFFIC SIGNAL IMPROVEMENTS | 0.0 |
3538-01-053 | Montgomery/ Houston | SH 242 | Actual | $608,798 | 6 | BRIDGE MAINTENANCE | 0.0 |
0110-02-027 | Montgomery/ Houston | SH 75 | Actual | $4,974,350 | 6 | BRIDGE REPLACEMENT | 6.0 |
0176-01-081 | Nacogdoches/ Lufkin | US 59 | Actual | $78,199,878 | 1 | HIGHWAY IMPROVEMENT | 8.5 |
2263-02-089 | Nueces/ Corpus Christi | SH 361 | Actual | $4,397,546 | 11 | FERRY OPERATION PROJECTS | 6.5 |
0916-00-221 | Nueces/ Corpus Christi | VA | Actual | $2,683,317 | 10 | CONSTRUCT PEDESTRIAN INFRASTRUCTURE | 8.0 |
1088-04-025 | Nueces/ Corpus Christi | FM 892 | Actual | $3,687,636 | 1 | WIDEN ROAD - ADD SHOULDERS | 7.0 |
0028-09-121 | Orange/ Beaumont | IH 10 | Actual | $50,121 | 10 | EMERGENCY RELIEF | 0.0 |
0063-04-060 | Panola/ Atlanta | US 59 | Actual | $4,913,597 | 11 | SURFACING/ROADWAY RESTORATION | 3.5 |
0365-01-050 | Parker/ Ft Worth | SH 171 | Actual | $397,790 | 3 | LANDSCAPE DEVELOPMENT | 0.0 |
0176-05-186 | Polk/ Lufkin | US 59 | Actual | $1,858 | 10 | EMERGENCY RELIEF | 0.0 |
0911-04-076 | Polk/ Lufkin | CR | Actual | $1,595,654 | 6 | BRIDGE REPLACEMENT | 6.0 |
0275-01-204 | Potter/ Amarillo | IH 40 | Actual | $4,345,374 | 1 | HAZARD ELIMINATION & SAFETY | 8.5 |
0558-09-035 | Reagan/ San Angelo | SH 137 | Actual | $16,884,098 | 11 | SURFACING/ROADWAY RESTORATION | 2.5 |
0371-03-123 | Refugio/ Corpus Christi | US 77 | Actual | $3,213,745 | 1 | SURFACING/ROADWAY RESTORATION | 3.5 |
0911-30-030 | San Augustine/ Lufkin | CR | Actual | $1,073,324 | 6 | BRIDGE REPLACEMENT | 5.0 |
0403-01-047 | San Jacinto/ Lufkin | SH 156 | Actual | $2,710 | 10 | EMERGENCY RELIEF | 0.0 |
0908-19-027 | Scurry/ Abilene | VA | Actual | $1,053,145 | 11 | PREVENTIVE MAINTENANCE | 0.0 |
0259-02-051 | Somervell/ Ft Worth | US 67 | Actual | $10,443,745 | 1 | CONSTRUCT NEW ROAD | 7.0 |
0907-11-006 | Sterling/ San Angelo | CR | Actual | $1,276,064 | 6 | BRIDGE REPLACEMENT | 10.0 |
0172-06-093 | Tarrant/ Ft Worth | SS 280 | Actual | $1,104,734 | 1 | RESURFACE ROADWAY | 5.0 |
0013-10-086 | Tarrant/ Ft Worth | BU 287P | Actual | $465,355 | 3 | LANDSCAPE DEVELOPMENT | 0.0 |
2374-05-086 | Tarrant/ Ft Worth | IH 20 | Actual | $1,415,291 | 1 | RESURFACE ROADWAY | 0.0 |
0008-16-046 | Tarrant/ Ft Worth | IH 20 | Actual | $2,020,477 | 1 | INSTALL ILLUMINATION | 0.0 |
1068-02-149 | Tarrant/ Ft Worth | IH 30 | Actual | $6,679,856 | 1 | RESURFACE ROADWAY | 4.0 |
0902-90-097 | Tarrant/ Ft Worth | CS | Actual | $335,374 | 3 | INSTALL TRAFFIC SIGNAL | 5.0 |
0902-90-078 | Tarrant/ Ft Worth | VA | Actual | $968,799 | 3 | CONSTRUCT PEDESTRIAN INFRASTRUCTURE | 0.0 |
0902-90-106 | Tarrant/ Ft Worth | VA | Actual | $4,347,326 | 1 | INSTALL/REHABILITATE ITS | 0.0 |
1068-01-222 | Tarrant/ Ft Worth | IH 30 | Actual | $3,910,234 | 6 | REHABILITATE BRIDGE | 0.0 |
0902-00-210 | Tarrant/ Ft Worth | VA | Actual | $1,012,205 | 1 | UPGRADE DYNAMIC MESSAGE SIGN BOARDS | 0.0 |
0908-00-093 | Taylor/ Abilene | VA | Actual | $1,157,398 | 11 | PREVENTIVE MAINTENANCE | 0.0 |
0908-00-092 | Taylor/ Abilene | VA | Actual | $1,049,741 | 11 | PREVENTIVE MAINTENANCE | 0.0 |
0914-00-420 | Travis/ Austin | VA | Actual | $1,972,023 | 10 | CONSTRUCT PEDESTRIAN INFRASTRUCTURE | 8.0 |
1378-01-041 | Travis/ Austin | RM 1431 | Actual | $1,388,016 | 1 | HIGHWAY IMPROVEMENT | 0.0 |
0113-13-181 | Travis/ Austin | SH 71 | Actual | $3,422,650 | 1 | HAZARD ELIMINATION & SAFETY | 7.0 |
2100-01-060 | Travis/ Austin | RM 2222 | Actual | $11,670,486 | 1 | HIGHWAY IMPROVEMENT | 7.5 |
0914-00-423 | Travis/ Austin | VA | Actual | $312,500 | 3 | REGIONAL COMMUTE ALTERNATIVES PROGRAM | 0.0 |
1237-01-036 | Tyler/ Beaumont | FM 1013 | Actual | $17,506 | 10 | EMERGENCY RELIEF | 0.0 |
0703-03-025 | Tyler/ Beaumont | FM 256 | Actual | $48,854 | 10 | TS HARVEY EMERGENCY REPAIR DONE WITH 47Y00279 | 0.0 |
1584-01-027 | Tyler/ Beaumont | FM 1745 | Actual | $14,194 | 10 | EMERGENCY RELIEF | 0.0 |
0024-01-105 | Uvalde/ San Antonio | US 90 | Actual | $1,334,755 | 1 | HAZARD ELIMINATION & SAFETY | 2.5 |
0036-08-054 | Uvalde/ San Antonio | US 83 | Actual | $2,487,621 | 1 | HAZARD ELIMINATION & SAFETY | 8.0 |
0922-11-043 | Val Verde/ Laredo | PW | Actual | $4,254,441 | 10 | STATE PARK IMPROVEMENTS | 0.0 |
1132-01-031 | Victoria/ Yoakum | FM 1686 | Actual | $6,260,569 | 1 | SURFACING/ROADWAY RESTORATION | 0.0 |
0315-12-016 | Washington/ Bryan | FM 1155 | Actual | $1,284,590 | 1 | CONSTRUCT NEW ROAD | 8.0 |
0922-00-065 | Webb/ Laredo | VA | Actual | $2,137,964 | 11 | REMOVE/REPLACE BRIDGE RAIL | 9.0 |
0925-11-014 | Wheeler/ Childress | CR | Actual | $1,262,552 | 6 | BRIDGE REPLACEMENT | 0.0 |
1201-01-014 | Williamson/ Austin | FM 970 | Actual | $5,213,728 | 1 | HAZARD ELIMINATION & SAFETY | 9.0 |
2211-01-027 | Williamson/ Austin | RM 2338 | Actual | $239,710 | 3 | INFRASTRUCTURE IMPROVEMENTS | 0.0 |
0100-03-084 | Wilson/ San Antonio | US 181 | Actual | $12,807,765 | 1 | SURFACING/ROADWAY RESTORATION | 3.0 |
0143-04-066 | Wilson/ San Antonio | US 87 | Actual | $16,321,952 | 1 | SURFACING/ROADWAY RESTORATION | 4.5 |
0902-20-099 | Wise/ Ft Worth | CR | Actual | $703,995 | 6 | BRIDGE REPLACEMENT | 7.0 |
0013-08-135 | Wise/ Ft Worth | US 81 | Actual | $1,108,315 | 1 | RESURFACE ROADWAY | 6.0 |
0816-01-014 | Wise/ Ft Worth | FM 455 | Actual | $3,408,029 | 1 | REHABILITATE EXISTING ROADWAY | 7.5 |
0444-01-041 | Young/ Wichita Falls | SH 114 | Actual | $11,742,358 | 1 | WIDEN ROAD - ADD LANES | 6.0 |
|